West Coast Expressway: Difference between revisions
m Section 6 WCE opened |
|||
(38 intermediate revisions by 19 users not shown) | |||
Line 1: | Line 1: | ||
{{Short description|Controlled-access highway in Peninsular Malaysia}} |
{{Short description|Controlled-access highway in Peninsular Malaysia}} |
||
{{About|the expressway in Malaysia|the highway running along the west coast of South Korea|Seohaean Expressway}} |
{{About|the expressway in Malaysia|the highway running along the west coast of South Korea|Seohaean Expressway}} |
||
{{Use dmy dates|date= |
{{Use dmy dates|date=March 2024}} |
||
{{Infobox road |
{{Infobox road |
||
| country = MYS |
| country = MYS |
||
Line 24: | Line 24: | ||
| length_km = 233.0 |
| length_km = 233.0 |
||
| established = 2014 |
| established = 2014 |
||
| status = |
| status = 7 sections opened: <br> |
||
Perak section: {{Bulleted list|All 4 section completed, and opened for traffic}}<br> |
|||
| history = Opened in stages from June 2019, expected completion in 2025. |
|||
Selangor section: {{Bulleted list|Section 1: Banting–Tg. Dua Belas (SKVE)|Section 5: Bandar Bukit Raja–Kapar|Section 6: Kapar–Assam Jawa}} |
|||
| history = Opened in stages from June 2019, expected completion in {{Start date and age|2026|||df=y}}. |
|||
| direction_a = North |
| direction_a = North |
||
| terminus_a = {{JKR|60}} [[Malaysia Federal Route 60|Federal route 60]] and {{MES-E|1}} [[North–South Expressway Northern Route]] at [[Changkat Jering]], Perak |
| terminus_a = {{JKR|60}} [[Malaysia Federal Route 60|Federal route 60]] and {{MES-E|1}} [[North–South Expressway Northern Route]] at [[Changkat Jering]], Perak |
||
Line 36: | Line 38: | ||
The '''West Coast Expressway''' ('''E32'''), abbreviated '''WCE''', is an interstate [[controlled-access highway]] running along the west coast of [[Peninsular Malaysia]]. The {{Convert|233|km|mi|abbr=off|adj=on}} expressway is currently under construction, with several sections open for public use. Once completed, the expressway will run between [[:Changkat Jering]], [[:Perak]] and [[:Banting]], [[:Selangor]], following federal routes [[Malaysia Federal Route 5|5]] and [[Malaysia Federal Route 60|60]] for most of its route. The expressway will operate in three sections, with sections of federal route 5 completing the missing connections; these sections will be upgraded to [[limited-access road]]s. The expressway is expected to be fully completed by the end of 2025,<ref name=":0">{{Cite web|url=https://www.edgeprop.my/content/1607579/hot-spots-coming-along-wce|title=Hot spots coming up along WCE|website=Edgeprop.my|language=en|access-date=19 December 2019}}</ref><ref>{{Cite web |last=TAHIR |first=MOHD IZZATUL IZUAN |date=2022-12-06 |title=Lebuhraya Taiping-Banting beroperasi sepenuhnya 2025 |url=https://www.sinarharian.com.my/article/234870/edisi/selangor-kl/lebuhraya-taiping-banting-beroperasi-sepenuhnya-2025 |access-date=2023-06-01 |website=Sinar Harian |language=ms}}</ref> except for a 10 km stretch from Section 7B which is expected to be completed by June 2026.<ref>{{Cite web|title=Bumpy path to profitability {{!}} The Star|url=https://www.thestar.com.my/business/business-news/2020/08/01/bumpy-path-to-profitability|access-date=2020-08-20|website=www.thestar.com.my}}</ref> |
The '''West Coast Expressway''' ('''E32'''), abbreviated '''WCE''', is an interstate [[controlled-access highway]] running along the west coast of [[Peninsular Malaysia]]. The {{Convert|233|km|mi|abbr=off|adj=on}} expressway is currently under construction, with several sections open for public use. Once completed, the expressway will run between [[:Changkat Jering]], [[:Perak]] and [[:Banting]], [[:Selangor]], following federal routes [[Malaysia Federal Route 5|5]] and [[Malaysia Federal Route 60|60]] for most of its route. The expressway will operate in three sections, with sections of federal route 5 completing the missing connections; these sections will be upgraded to [[limited-access road]]s. The expressway is expected to be fully completed by the end of 2025,<ref name=":0">{{Cite web|url=https://www.edgeprop.my/content/1607579/hot-spots-coming-along-wce|title=Hot spots coming up along WCE|website=Edgeprop.my|language=en|access-date=19 December 2019}}</ref><ref>{{Cite web |last=TAHIR |first=MOHD IZZATUL IZUAN |date=2022-12-06 |title=Lebuhraya Taiping-Banting beroperasi sepenuhnya 2025 |url=https://www.sinarharian.com.my/article/234870/edisi/selangor-kl/lebuhraya-taiping-banting-beroperasi-sepenuhnya-2025 |access-date=2023-06-01 |website=Sinar Harian |language=ms}}</ref> except for a 10 km stretch from Section 7B which is expected to be completed by June 2026.<ref>{{Cite web|title=Bumpy path to profitability {{!}} The Star|url=https://www.thestar.com.my/business/business-news/2020/08/01/bumpy-path-to-profitability|access-date=2020-08-20|website=www.thestar.com.my}}</ref> |
||
The expressway is being built by Konsortium Lebuhraya Pantai Barat. Approval was given by the government for the construction, which was to begin from 20 December 2013 and was to be completed within five years.<ref>http://www.wce.com.my/media-updates/New-beginning-for-KEuro {{Dead link|date=February 2022}}</ref> It originally was given route code E28 but later changed to E32, and E28 was used by [[Sultan Abdul Halim Muadzam Shah Bridge]]. The project was delayed and actual construction began in May 2014. Currently, a {{convert|31.5|km|mi|adj=on}} segment between [[Kapar]] and [[Assam Jawa]],<ref name=":2"/> a {{convert|19|km|mi|adj=on}} segment from [[Hutan Melintang]] to [[Teluk Intan]]<ref name=":3">{{Cite web|url=https://www.nst.com.my/news/nation/2019/05/492983/section-8-west-coast-expressway-opens-today|title=Section 8 of West Coast Expressway opens today|last=Arif|first=Zahratulhayat Mat|date=3 May 2019|website=NST Online|language=en|access-date=19 December 2019}}</ref> and a {{convert| |
The expressway is being built by Konsortium Lebuhraya Pantai Barat. Approval was given by the government for the construction, which was to begin from 20 December 2013 and was to be completed within five years.<ref>http://www.wce.com.my/media-updates/New-beginning-for-KEuro {{Dead link|date=February 2022}}</ref> It originally was given route code E28 but later changed to E32, and E28 was used by [[Sultan Abdul Halim Muadzam Shah Bridge]]. The project was delayed and actual construction began in May 2014. Currently, a {{convert|31.5|km|mi|adj=on}} segment between [[Kapar]] and [[Assam Jawa]],<ref name=":2"/> a {{convert|19|km|mi|adj=on}} segment from [[Hutan Melintang]] to [[Teluk Intan]]<ref name=":3">{{Cite web|url=https://www.nst.com.my/news/nation/2019/05/492983/section-8-west-coast-expressway-opens-today|title=Section 8 of West Coast Expressway opens today|last=Arif|first=Zahratulhayat Mat|date=3 May 2019|website=NST Online|language=en|access-date=19 December 2019}}</ref> and a {{convert|80|km|mi|adj=on}} segment from [[Lekir]] to [[Taiping, Perak|Taiping]]<ref name=":4">{{Cite web|url=https://www.nst.com.my/news/nation/2019/09/524086/sections-9-10-wce-now-open|title=Sections 9, 10 of WCE now open|last=Bernama|date=2 September 2019|website=NST Online|language=en|access-date=19 December 2019}}</ref> are opened to traffic. |
||
Once the expressway is completed, it will be the fourth longest in [[Peninsular Malaysia]], after the [[North-South Expressway Northern Route]], the [[East Coast Expressway]] and the [[North-South Expressway Southern Route]]. |
Once the expressway is completed, it will be the fourth longest in [[Peninsular Malaysia]], after the [[North-South Expressway Northern Route]], the [[East Coast Expressway]] and the [[North-South Expressway Southern Route]]. |
||
==Overview== |
==Overview== |
||
Construction of the expressway is divided into eleven packages. Works for the first five packages commenced in May 2014, of which three packages are in Selangor while the other two are in Perak. The stretches between [[Tanjung Karang, Selangor|Tanjung Karang]] to [[Hutan Melintang]] and [[Teluk Intan]] to [[Kampung Lekir]] are using the existing stretches of [[Malaysia Federal Route 5|federal route 5]], both of which are currently being upgraded. As a result, the expressway will consist of three non-contiguous stretches of controlled-access expressway (JKR R6), i.e. from [[Banting]] to [[Tanjung Karang, Selangor|Tanjung Karang]], [[Hutan Melintang]] to [[Teluk Intan]] and [[Lekir]] to [[Changkat Jering]] while the two stretches on federal route 5 are partial access highways (JKR R5) featuring grade-separated interchanges at major junctions, left-in/left-out junctions and at-grade U-Turns.{{fact|date=November 2022}} |
|||
Construction of the expressway is divided into eleven packages. Works for the first five packages commenced in May 2014, of which three packages are in Selangor while the other two are in Perak. The stretches between [[Tanjung Karang, Selangor|Tanjung Karang]] to [[Hutan Melintang]] and [[Teluk Intan]] to [[Kampung Lekir]] are using the existing stretches of [[Malaysia Federal Route 5|federal route 5]], both of which are currently being upgraded. As a result, the expressway will consist of three non-contiguous stretches of controlled-access expressway (JKR R6), i.e. from [[Banting]] to [[Tanjung Karang, Selangor|Tanjung Karang]], [[Hutan Melintang]] to [[Teluk Intan]] and [[Lekir]] to [[Changkat Jering]] while the two stretches on federal route 5 are partial access highways (JKR R5) featuring grade-separated interchanges at major junctions, left-in/left-out junctions and at-grade U-Turns.{{citation needed|date=November 2022}} |
|||
A spur link from [[Changkat Keruing]] to Siputeh (near [[Ipoh]]) in Perak which will be connected via an interchange with the main link is also in the plan. Construction of the spur link is however deferred. The spur link will consist of a controlled-access expressway (JKR R6) stretch from [[Changkat Keruing]] to [[Parit]] while the stretch between [[Parit]] to Siputeh will use the existing stretch of [[Malaysia Federal Route 73|federal route 73]] will be similarly upgraded like the two federal route 5 stretches of the main link package has been awarded to Gedeihen Engineering Sdn Bhd. The controlled-access expressway stretches will use a closed toll system like the [[North–South Expressway (Malaysia)|North–South Expressway]]. Toll collection has started at all opened stretches of the expressway. The stretches on existing federal roads will remain toll-free.{{fact|date=November 2022}} |
|||
A spur link from [[Changkat Keruing]] to Siputeh (near [[Ipoh]]) in Perak which will be connected via an interchange with the main link is also in the plan. Construction of the spur link is however deferred. The spur link will consist of a controlled-access expressway (JKR R6) stretch from [[Changkat Keruing]] to [[Parit]] while the stretch between [[Parit]] to Siputeh will use the existing stretch of [[Malaysia Federal Route 73|federal route 73]] will be similarly upgraded like the two federal route 5 stretches of the main link package has been awarded to Gedeihen Engineering Sdn Bhd. The controlled-access expressway stretches will use a closed toll system like the [[North–South Expressway (Malaysia)|North–South Expressway]]. Toll collection has started at all opened stretches of the expressway. The stretches on existing federal roads will remain toll-free.{{citation needed|date=November 2022}} |
|||
On 25 May 2014, the construction of the expressway began. The groundbreaking ceremony for the new expressway was held near the Teluk Intan interchange in [[Teluk Intan]], Perak.{{fact|date=November 2022}} |
|||
Progress updates on construction of the expressway is updated monthly [https://wce.com.my/project-updates/ here]. |
|||
On 25 May 2014, the construction of the expressway began. The groundbreaking ceremony for the new expressway was held near the Teluk Intan interchange in [[Teluk Intan]], Perak.{{citation needed|date=November 2022}} |
|||
Five interchanges (sections 4–5, 8–10) were expected to be opened in time for [[Eid al-Fitr]] in 2019<ref name=":1">{{Cite web|url=http://www.wce.com.my/media-updates/WCE-back-in-the-spotlight|title=West Coast Expressway – Media Updates – WCE back in the spotlight|website=wce.com.my|access-date=19 December 2019}}</ref> but a burst water pipe on 5 May 2019 delayed the opening of sections 4–5.<ref>{{Cite web|url=https://www.worldofbuzz.com/photos-show-extent-of-damage-to-collapsed-expressway-that-caused-unexpected-water-shortage-in-klang/|title=Photos Show Extent Of Damage to Collapsed Expressway That Caused Unexpected Water Shortage in Klang – WORLD OF BUZZ|last=Thiagarajan|first=Tara|date=9 May 2019|website=worldofbuzz.com/|language=en-US|access-date=19 December 2019}}</ref> |
Five interchanges (sections 4–5, 8–10) were expected to be opened in time for [[Eid al-Fitr]] in 2019<ref name=":1">{{Cite web|url=http://www.wce.com.my/media-updates/WCE-back-in-the-spotlight|title=West Coast Expressway – Media Updates – WCE back in the spotlight|website=wce.com.my|access-date=19 December 2019}}</ref> but a burst water pipe on 5 May 2019 delayed the opening of sections 4–5.<ref>{{Cite web|url=https://www.worldofbuzz.com/photos-show-extent-of-damage-to-collapsed-expressway-that-caused-unexpected-water-shortage-in-klang/|title=Photos Show Extent Of Damage to Collapsed Expressway That Caused Unexpected Water Shortage in Klang – WORLD OF BUZZ|last=Thiagarajan|first=Tara|date=9 May 2019|website=worldofbuzz.com/|language=en-US|access-date=19 December 2019}}</ref> |
||
Line 51: | Line 56: | ||
On 31 May 2019, section 8 between Hutan Melintang and Teluk Intan in Perak was opened to traffic. The opening ceremony was officiated by the Deputy Minister of Works, Mohd. Anuar Tahir.<ref name=":3" /> This followed by the opening of sections 9 and 10 between Lekir and Beruas, also in Perak on 23 September 2019 and officiated by Works Ministry secretary-general Datuk Dr Syed Omar Sharifuddin Syed Ikhsan.<ref name=":4" /> The first section to open in Selangor was section 5 between Kapar and Bukit Raja and officiated by Malaysian Highway Authority director-general Datuk Mohd Shuhaimi Hassan. This stretch was opened to public on 10 December 2019.<ref name=":2">{{Cite web|url=https://www.nst.com.my/news/nation/2019/12/546673/west-coast-expressway-opens-section-5-stretch-traffic-tonight|title=West Coast Expressway opens Section 5 stretch to traffic tonight|last=Chan|first=Dawn|date=1 December 2019|website=NST Online|language=en|access-date=19 December 2019}}</ref> |
On 31 May 2019, section 8 between Hutan Melintang and Teluk Intan in Perak was opened to traffic. The opening ceremony was officiated by the Deputy Minister of Works, Mohd. Anuar Tahir.<ref name=":3" /> This followed by the opening of sections 9 and 10 between Lekir and Beruas, also in Perak on 23 September 2019 and officiated by Works Ministry secretary-general Datuk Dr Syed Omar Sharifuddin Syed Ikhsan.<ref name=":4" /> The first section to open in Selangor was section 5 between Kapar and Bukit Raja and officiated by Malaysian Highway Authority director-general Datuk Mohd Shuhaimi Hassan. This stretch was opened to public on 10 December 2019.<ref name=":2">{{Cite web|url=https://www.nst.com.my/news/nation/2019/12/546673/west-coast-expressway-opens-section-5-stretch-traffic-tonight|title=West Coast Expressway opens Section 5 stretch to traffic tonight|last=Chan|first=Dawn|date=1 December 2019|website=NST Online|language=en|access-date=19 December 2019}}</ref> |
||
Land acquisition issues and alignment changes causing delay of the construction of section 7 (Assam Jawa–Tanjung Karang),<ref name=":1" /> which |
Land acquisition issues and alignment changes causing delay of the construction of section 7 (Assam Jawa–Tanjung Karang),<ref name=":1" /> which was being completed by 2024 along with section 11 (Beruas–Taiping South).<ref name=":5">{{Cite web|url=https://www.thestar.com.my/business/business-news/2020/01/11/in-high-gear-to-complete-233km-west-coast-expressway|title=In high gear to complete 233km West Coast Expressway {{!}} The Star Online|website=The Star|location=Malaysia|access-date=14 January 2020}}</ref><ref name=":6">{{Cite web|url=https://themalaysianreserve.com/2020/11/03/wce-highway-completion-delayed-to-2024/|title=WCE highway completion delayed to 2024 {{!}} The Malaysian Reserve|website=The Malaysian Reserve|location=Malaysia|access-date=3 November 2020}}</ref> |
||
As of 21 |
As of 21 November 2023, section 6 (Kapar – Assam Jawa) is opened to traffic along which steady progress being made at sections 7 and 11, with are the most integral sections of the expressway to be completed to ease traffic congestion at [[Tanjung Karang, Selangor|Tanjung Karang]] and along {{JKR|60}}, especially during festive seasons.<ref>{{Cite web |last=BERNAMA |date=2023-11-20 |title=WCE SECTION 6 OPENS AT MIDNIGHT, NO TOLL UNTIL JAN 2, 2024 |url=https://www.bernama.com/en/news.php?id=2246146 |access-date=2023-11-20 |website=BERNAMA |language=en}}</ref> |
||
WCE group has the first right of refusal for Section 12 (Siputeh – Segari) which will cost RM600 million with 41 km stretch. There is a plan to extend the expressway all the way to Penang if it is feasible.<ref name=":5" /> |
WCE group has the first right of refusal for Section 12 (Siputeh – Segari) which will cost RM600 million with 41 km stretch. There is a plan to extend the expressway all the way to Penang if it is feasible.<ref name=":5" /> |
||
There's also a proposal by the Johorean state government to extend the WCE to Melaka, Pontian, and Iskandar Puteri from Banting. If it is feasible, WCE will be the alternative route to the North South Expressway from Johor Bahru to Taiping.<ref>{{Cite journal |date=26 March 2020 |title=Rancangan Struktur Negeri Johor 2030 (RSNJ 2030) |url=https://www.planmalaysia.gov.my/planmalaysia/resources/Ranacangan/RSN/RSNJ2030_FULL.pdf |journal=PLANMalaysia |volume=1 |issue=1 |pages=78 |via=Government of Malaysia, Ministry of Housing and Local Government (Kementerian Perumahan dan Kerajaan Tempatan; KPKT)}}</ref> |
|||
==Route background== |
|||
== Route background == |
|||
[[File:WCE highway from Sungai Rasau.jpg|thumb|WCE in Sungai Rasau, [[Klang (city)|Klang]]]] |
[[File:WCE highway from Sungai Rasau.jpg|thumb|WCE in Sungai Rasau, [[Klang (city)|Klang]]]] |
||
[[File:WCE Changkat Jering IC (220806).jpg|thumb|WCE in Changkat Jering, the northern termini in [[Taiping, Perak|Taiping]]]] |
[[File:WCE Changkat Jering IC (220806).jpg|thumb|WCE in Changkat Jering, the northern termini in [[Taiping, Perak|Taiping]]]] |
||
Line 113: | Line 120: | ||
! scope="col" |Destination |
! scope="col" |Destination |
||
! scope="col" |Note |
! scope="col" |Note |
||
! scope="col" |Photograph |
|||
|- |
|- |
||
| rowspan=" |
| rowspan="30" |[[Perak]] |
||
| rowspan=" |
| rowspan="4" |[[Larut, Matang and Selama District|Larut, Matang & Selama]] |
||
! scope="row" style="text-align: right;" | |
! scope="row" style="text-align: right;" | |
||
| align="center" |3238 |
| align="center" |3238 |
||
|Taiping Selatan |
|Taiping Selatan |
||
|{{JKR| |
|3238A <br> {{JKR|60}} [[Malaysia Federal Route 60|Federal Route 60]]- Trong, Bendang Siam, Kg. Changkat Ibol. <br> |
||
3238B <br> {{JKR|1}} [[Malaysia Federal Route 1|Federal Route 1]]- Simpang, [[Kamunting]], [[Padang Rengas]]. <br> |
|||
{{JKR|74}} [[Malaysia Federal Route 74|Federal Route 74]] - [[Taiping, Perak|Taiping]], [[Kuala Sepetang]]. <br> |
|||
{{Jct|country=MYS|E2|1}}({{Jct|country=MYS|AH|2}}) –[[Kuala Kangsar (town)|Kuala Kangsar]], [[Ipoh]], [[George Town, Penang|George Town]], [[Alor Setar]], [[Kuala Lumpur]] |
3238C <br> {{Jct|country=MYS|E2|1}}({{Jct|country=MYS|AH|2}}) –[[Kuala Kangsar (town)|Kuala Kangsar]], [[Ipoh]], [[George Town, Penang|George Town]], [[Alor Setar]], [[Kuala Lumpur]] |
||
|Cloverleaf Diamond Fused Interchange |
|||
|Under construction. |
|||
| |
|||
|- |
|- |
||
! scope="row" style="text-align: right;" | |
! scope="row" style="text-align: right;" | |
||
| colspan="4" style="text-align: center;" |Taiping Selatan Toll Plaza<br> {{TnG}} {{TAG}} '''[[MyRFID|<span style="padding:1px .2em; background-color:#e6e6e6; color:#214682; font-weight:bold;">My</span><span style="padding:1px .2em; background-color:#e6e6e6; color:#ff0000; font-weight:bold;">RFID</span>]]'''<br> Start/End closed toll collection system |
|||
| colspan="4" style="text-align: center;" |Taiping Selatan Toll Plaza |
|||
| |
|||
{{TnG}} {{TAG}} '''[[MyRFID|<span style="padding:1px .2em; background-color:#e6e6e6; color:#214682; font-weight:bold;">My</span><span style="padding:1px .2em; background-color:#e6e6e6; color:#ff0000; font-weight:bold;">RFID</span>]]''' |
|||
Start/End closed toll collection system |
|||
(under construction) |
|||
|- |
|- |
||
! scope="row" style="text-align: right;" | |
! scope="row" style="text-align: right;" | |
||
Line 136: | Line 143: | ||
|Trong |
|Trong |
||
|{{JKR|60}} [[Malaysia Federal Route 60|Federal Route 60]] - Trong |
|{{JKR|60}} [[Malaysia Federal Route 60|Federal Route 60]] - Trong |
||
|Trumpet interchange. |
|Trumpet interchange. |
||
| |
|||
|- |
|||
! |
|||
| colspan="4" style="text-align: center;" |Sg. Nyior Rest and Service Area (Partially completed; both directions; separated) {{Parking sign}} {{Toilet sign}} {{Surau sign}} |
|||
| |
|||
|- |
|- |
||
| rowspan=" |
| rowspan="11" |[[Manjung District|Manjung]] |
||
! scope="row" style="text-align: right;" |241.63 |
! scope="row" style="text-align: right;" |'''241.63''' |
||
| align="center" |3235 |
| align="center" |3235 |
||
|Beruas |
|Beruas |
||
|{{JKR|73}} [[Malaysia Federal Route 73|Federal Route 73]] - [[Beruas]], [[Parit]] |
|{{JKR|73}} [[Malaysia Federal Route 73|Federal Route 73]] - [[Beruas]], [[Parit]], [[Batu Gajah]] |
||
{{JKR|60}} [[Malaysia Federal Route 60|Federal Route 60]] - [[Pantai Remis]] |
{{JKR|60}} [[Malaysia Federal Route 60|Federal Route 60]] - [[Pantai Remis]] |
||
|Trumpet interchange. |
|Trumpet interchange. |
||
| |
|||
Closed toll collection system start/end temporary here. |
|||
|- |
|- |
||
! scope="row" style="text-align: right;" |222.55 |
! scope="row" style="text-align: right;" |'''222.55''' |
||
| align="center" |3233 |
| align="center" |3233 |
||
|Changkat Cermin |
|Changkat Cermin |
||
|{{JKR|5}} [[Malaysia Federal Route 5|Federal Route 5]] - Ayer Tawar, Bota, Seri Iskandar, Batu Gajah, Ipoh |
|{{JKR|5}} [[Malaysia Federal Route 5|Federal Route 5]] - Ayer Tawar, Bota, Seri Iskandar, Batu Gajah, Ipoh |
||
|Trumpet interchange |
|Trumpet interchange |
||
| |
|||
|- |
|- |
||
! scope="row" style="text-align: right;" |216.5 |
! scope="row" style="text-align: right;" |'''216.5''' |
||
| colspan="4" style="text-align: center;" |Ayer Tawar Rest and Service Area (under construction; northbound) |
| colspan="4" style="text-align: center;" |Ayer Tawar Rest and Service Area (under construction; northbound) |
||
West Coast Expressway North Region Office (northbound) |
West Coast Expressway North Region Office (northbound) |
||
| |
|||
|- |
|- |
||
! scope="row" style="text-align: right;" |210.1 |
! scope="row" style="text-align: right;" |'''210.1''' |
||
| align="center" |3232 |
| align="center" |3232 |
||
|Sitiawan Utara |
|Sitiawan Utara |
||
Line 163: | Line 177: | ||
{{JKR|100}} [[Malaysia Federal Route 100|Federal Route 100]] - Seri Manjung, Lumut, Pelabuhan Lumut {{Harbour sign}}, Pulau Pangkor {{Beach area sign}}, Teluk Senangin {{Beach area sign}} |
{{JKR|100}} [[Malaysia Federal Route 100|Federal Route 100]] - Seri Manjung, Lumut, Pelabuhan Lumut {{Harbour sign}}, Pulau Pangkor {{Beach area sign}}, Teluk Senangin {{Beach area sign}} |
||
|Trumpet interchange |
|Trumpet interchange |
||
|[[File:WCE Sitiawan Utara 1.jpg|150px|Sitiawan Utara toll]] |
|||
|- |
|- |
||
! scope="row" style="text-align: right;" |208.0 |
! scope="row" style="text-align: right;" |'''208.0''' |
||
| colspan="4" style="text-align: center;" |Sungai Wangi Rest and Service Area (under construction; southbound) |
| colspan="4" style="text-align: center;" |Sungai Wangi Rest and Service Area (under construction; southbound) |
||
| |
|||
|- |
|- |
||
! scope="row" style="text-align: right;" |202.89 |
! scope="row" style="text-align: right;" |'''202.89''' |
||
| align="center" |3231 |
| align="center" |3231 |
||
|Sitiawan |
|Sitiawan Selatan |
||
|{{JKR|5}} [[Malaysia Federal Route 5|Federal Route 5]] - Sitiawan |
|{{JKR|5}} [[Malaysia Federal Route 5|Federal Route 5]] - Sitiawan |
||
{{JKR|60}} [[Malaysia Federal Route 60|Federal Route 60]] - Seri Manjung, Lumut, Pelabuhan Lumut {{Harbour sign}}, Pulau Pangkor {{Beach area sign}}, Teluk Batik {{Beach area sign}} |
{{JKR|60}} [[Malaysia Federal Route 60|Federal Route 60]] - Seri Manjung, Lumut, Pelabuhan Lumut {{Harbour sign}}, Pulau Pangkor {{Beach area sign}}, Teluk Batik {{Beach area sign}} |
||
|Trumpet interchange |
|Trumpet interchange |
||
| |
|||
|- |
|- |
||
! scope="row" style="text-align: right;" |197.71 |
! scope="row" style="text-align: right;" |'''197.71''' |
||
| colspan="4" style="text-align: center;" |Lekir Toll Plaza<br> {{TnG}} {{TAG}} '''[[MyRFID|<span style="padding:1px .2em; background-color:#e6e6e6; color:#214682; font-weight:bold;">My</span><span style="padding:1px .2em; background-color:#e6e6e6; color:#ff0000; font-weight:bold;">RFID</span>]]'''<br> Start/End closed toll collection system |
|||
| colspan="4" style="text-align: center;" |Lekir Toll Plaza |
|||
| |
|||
{{TnG}} {{TAG}} '''[[MyRFID|<span style="padding:1px .2em; background-color:#e6e6e6; color:#214682; font-weight:bold;">My</span><span style="padding:1px .2em; background-color:#e6e6e6; color:#ff0000; font-weight:bold;">RFID</span>]]''' |
|||
Start/End closed toll collection system |
|||
|- |
|- |
||
! scope="row" style="text-align: right;" |196.24 |
! scope="row" style="text-align: right;" |'''196.24''' |
||
| align="center" |3230 |
| align="center" |3230 |
||
|Lekir |
|Lekir |
||
|{{JKR|5}} [[Malaysia Federal Route 5|Federal Route 5]] - Lekir (Batu 9-11) |
|{{JKR|5}} [[Malaysia Federal Route 5|Federal Route 5]] - Lekir (Batu 9-11) |
||
|Diamond Interchange |
|Diamond Interchange |
||
| |
|||
|- |
|- |
||
! scope="row" style="text-align: right;" |193.59 |
! scope="row" style="text-align: right;" |'''193.59''' |
||
| colspan="4" style="text-align: |
| colspan="4" style="text-align: center;" |Expressway {{Jct|country=MYS|E2|32}} ends southbound / commences northbound |
||
Federal Route {{JKR|5}} stretch commences southbound / ends northbound |
Federal Route {{JKR|5}} stretch commences southbound / ends northbound |
||
| |
|||
|- |
|||
! |
|||
| |
|||
|Batu 14 Lekir |
|||
|{{JKR|5}} [[Malaysia Federal Route 5|Federal Route 5]] - Lekir, Kg Koh, Sitiawan, Seri Manjung, Lumut |
|||
|LiLO interchange, entry/exit only for northbound traffic |
|||
| |
|||
|- |
|- |
||
! scope="row" style="text-align: right;" | |
! scope="row" style="text-align: right;" | |
||
| |
| |
||
|Kampung Kayan |
|Kampung Kayan |
||
|Kampung Kayan |
|||
| |
|||
|LiLO Interchange, entry/exit only for northbound traffic |
|LiLO Interchange, entry/exit only for northbound traffic |
||
| |
|||
|- |
|- |
||
| rowspan="4" |[[Perak Tengah District|Perak Tengah]] |
| rowspan="4" |[[Perak Tengah District|Perak Tengah]] |
||
Line 200: | Line 225: | ||
| |
| |
||
|[[Bagan Datuk Bridge]] (Sultan Nazrin Shah Bridge) |
|[[Bagan Datuk Bridge]] (Sultan Nazrin Shah Bridge) |
||
|{{JKR|312}} Bagan Datuk |
|{{JKR|312}} - Bagan Datuk, Selekoh, Rungkup |
||
|LiLO Interchange, entry/exit only for northbound traffic |
|LiLO Interchange, entry/exit only for northbound traffic |
||
| |
|||
|- |
|- |
||
! scope="row" style="text-align: right;" | |
! scope="row" style="text-align: right;" | |
||
| align="center" | |
| align="center" | |
||
|Jalan Trans Perak |
|Jalan Trans Perak |
||
|{{JKR(A)|266}} FELCRA Seberang Perak, Kampung Gajah, Bota Kiri |
|{{JKR(A)|266}} Lebuh Pemaisuri - FELCRA Seberang Perak, Kampung Gajah, Bota Kiri |
||
|Directional T-junction with traffic lights |
|Directional T-junction with traffic lights |
||
| |
|||
|- |
|- |
||
! scope="row" style="text-align: right;" | |
! scope="row" style="text-align: right;" | |
||
| |
| |
||
|Jalan Kota Setia |
|Jalan Kota Setia |
||
|{{JKR(A)|145}} Kota Setia |
|{{JKR(A)|145}} Kota Setia, Kampung Sungai Besar |
||
|LiLO Interchange, entry/exit only for northbound traffic |
|LiLO Interchange, entry/exit only for northbound traffic |
||
| |
|||
|- |
|- |
||
! scope="row" style="text-align: right;" | |
! scope="row" style="text-align: right;" | |
||
Line 220: | Line 248: | ||
|{{JKR(A)|18}} Ulu Dedap, Kampung Gajah, Bota Kiri |
|{{JKR(A)|18}} Ulu Dedap, Kampung Gajah, Bota Kiri |
||
|LiLO Interchange, entry/exit only for southbound traffic |
|LiLO Interchange, entry/exit only for southbound traffic |
||
| |
|||
|- |
|- |
||
| rowspan=" |
| rowspan="8" |[[Hilir Perak District|Hilir Perak]] |
||
! scope="row" style="text-align: right;" | |
! scope="row" style="text-align: right;" | |
||
| |
| |
||
|Sungai Rubana |
|Sungai Rubana |
||
|Kampung Sungai Rubana |
|||
|LiLO Interchange, entry/exit only for northbound traffic |
|||
| |
|||
|- |
|||
! |
|||
| |
| |
||
|Sungai Durian |
|||
|Sungai Durian, Selat Masjid |
|||
|LiLO interchange, entry/exit only for southbound traffic. |
|||
| |
| |
||
|- |
|- |
||
! scope="row" style="text-align: right;" | |
! scope="row" style="text-align: right;" | |
||
| |
| |
||
|Tanjung Sari |
|||
| |
|||
|Tapak Semenang, Tanjung Sari, Teluk Bharu |
|Tapak Semenang, Tanjung Sari, Teluk Bharu |
||
|LiLO Interchange, entry/exit only for northbound traffic |
|LiLO Interchange, entry/exit only for northbound traffic |
||
| |
|||
|- |
|- |
||
! scope="row" style="text-align: right;" | |
! scope="row" style="text-align: right;" | |
||
| colspan="4" |[[Sultan Yusuf Bridge]] |
| colspan="4" style="text-align: center" |[[Sultan Yusuf Bridge]] |
||
| |
|||
|- |
|- |
||
! scope="row" style="text-align: right;" |162.07 |
! scope="row" style="text-align: right;" |'''162.07''' |
||
| colspan="4" style="text-align: center;" |Federal Route {{JKR|5}} stretch commences northbound / ends southbound |
| colspan="4" style="text-align: center;" |Federal Route {{JKR|5}} stretch commences northbound / ends southbound |
||
Expressway {{Jct|country=MYS|E2|32}} ends northbound / commences southbound |
Expressway {{Jct|country=MYS|E2|32}} ends northbound / commences southbound |
||
| |
|||
|- |
|- |
||
! scope="row" style="text-align: right;" | |
! scope="row" style="text-align: right;" | |
||
Line 247: | Line 287: | ||
{{JKR|5}} [[Malaysia Federal Route 5|Federal Route 5]] - Hutan Melintang, Bagan Datuk |
{{JKR|5}} [[Malaysia Federal Route 5|Federal Route 5]] - Hutan Melintang, Bagan Datuk |
||
|Diamond interchange. |
|Diamond interchange. |
||
| |
|||
|- |
|- |
||
! scope="row" style="text-align: right;" | |
! scope="row" style="text-align: right;" | |
||
| colspan="4" style="text-align: center;" |Teluk Intan Toll Plaza<br> {{TnG}} {{TAG}} '''[[MyRFID|<span style="padding:1px .2em; background-color:#e6e6e6; color:#214682; font-weight:bold;">My</span><span style="padding:1px .2em; background-color:#e6e6e6; color:#ff0000; font-weight:bold;">RFID</span>]]'''<br> Start/End closed toll collection system |
|||
| colspan="4" style="text-align: center;" |Teluk Intan Toll Plaza |
|||
| [[File:WCE 1.jpg|150px|Teluk Intan Toll Plaza]] |
|||
{{TnG}} {{TAG}} '''[[MyRFID|<span style="padding:1px .2em; background-color:#e6e6e6; color:#214682; font-weight:bold;">My</span><span style="padding:1px .2em; background-color:#e6e6e6; color:#ff0000; font-weight:bold;">RFID</span>]]''' |
|||
Start/End closed toll collection system |
|||
|- |
|- |
||
! scope="row" style="text-align: right;" | |
! scope="row" style="text-align: right;" | |
||
| colspan="4" style="text-align: center;" |Teluk Intan Rest and Service Area ( |
| colspan="4" style="text-align: center;" |Teluk Intan Rest and Service Area (both directions; separated) |
||
|[[File:WCE 4.jpg|150px|Teluk Intan R&R]] |
|||
|- |
|- |
||
| rowspan="3" |[[Bagan Datuk District|Bagan Datuk]] |
| rowspan="3" |[[Bagan Datuk District|Bagan Datuk]] |
||
! scope="row" style="text-align: right;" | |
! scope="row" style="text-align: right;" | |
||
| colspan="4" style="text-align: center;" |Hutan Melintang Toll Plaza<br> {{TnG}} {{TAG}} '''[[MyRFID|<span style="padding:1px .2em; background-color:#e6e6e6; color:#214682; font-weight:bold;">My</span><span style="padding:1px .2em; background-color:#e6e6e6; color:#ff0000; font-weight:bold;">RFID</span>]]'''<br> Start/End closed toll collection system |
|||
| colspan="4" style="text-align: center;" |Hutan Melintang Toll Plaza |
|||
| |
|||
{{TnG}} {{TAG}} '''[[MyRFID|<span style="padding:1px .2em; background-color:#e6e6e6; color:#214682; font-weight:bold;">My</span><span style="padding:1px .2em; background-color:#e6e6e6; color:#ff0000; font-weight:bold;">RFID</span>]]''' |
|||
Start/End closed toll collection system |
|||
|- |
|- |
||
! scope="row" style="text-align: right;" | |
! scope="row" style="text-align: right;" | |
||
Line 270: | Line 308: | ||
{{JKR|69}} [[Malaysia Federal Route 69|Federal Route 69]] - Bagan Datuk |
{{JKR|69}} [[Malaysia Federal Route 69|Federal Route 69]] - Bagan Datuk |
||
|Diamond interchange. |
|Diamond interchange. |
||
| [[File:Jalan Klang-Teluk Intan (Malaysia Federal Highway 5), Kampung Seri Perkasa 20231220 113314.jpg|150px|Hutan Melintang Interchange]] |
|||
|- |
|- |
||
! scope="row" style="text-align: right;" | 143.99 |
! scope="row" style="text-align: right;" | '''143.99''' |
||
| colspan="4" style="text-align: center;" |Expressway {{Jct|country=MYS|E2|32}} ends southbound / commences northbound |
| colspan="4" style="text-align: center;" |Expressway {{Jct|country=MYS|E2|32}} ends southbound / commences northbound |
||
Federal Route {{JKR|5}} stretch commences southbound / ends northbound |
Federal Route {{JKR|5}} stretch commences southbound / ends northbound |
||
| [[File:Jalan Klang-Teluk Intan (Malaysia Federal Highway 5), Kampung Seri Perkasa 20231220 113311.jpg|150px|Route 5-WCE boundary]] |
|||
|- |
|- |
||
|Perak–Selangor border |
|Perak–Selangor border |
||
Line 279: | Line 319: | ||
! scope="row" style="text-align: right;" | |
! scope="row" style="text-align: right;" | |
||
| colspan="4" style="text-align: center;" |Bernam River Bridge |
| colspan="4" style="text-align: center;" |Bernam River Bridge |
||
|[[File:Sungei Bernam Bridges - panoramio.jpg|150px|Bernam River Bridge]] |
|||
|- |
|- |
||
| rowspan="18" |[[Selangor]] |
| rowspan="18" |[[Selangor]] |
||
Line 287: | Line 328: | ||
|{{JKR(B)|53}} Jalan Gertak Tinggi – Sabak Bernam |
|{{JKR(B)|53}} Jalan Gertak Tinggi – Sabak Bernam |
||
|Diamond interchange |
|Diamond interchange |
||
|[[File:Jalan Klang-Teluk Intan (Malaysia Federal Highway 5), Sabak 20231220 112746.jpg|150px|Sabak Bernam Interchange]] |
|||
|- |
|- |
||
! scope="row" style="text-align: right;" | |
! scope="row" style="text-align: right;" | |
||
Line 293: | Line 335: | ||
|{{JKR(B)|55}} Jalan Sungai Air Tawar – Sungai Air Tawar, Bagan Nakhoda Omar |
|{{JKR(B)|55}} Jalan Sungai Air Tawar – Sungai Air Tawar, Bagan Nakhoda Omar |
||
|Diamond interchange |
|Diamond interchange |
||
|[[File:Jalan Klang-Teluk Intan (Malaysia Federal Highway 5), Kampung Panchang Bedena 20231220 112354.jpg|150px|Sungai Air Tawar Interchange]] |
|||
|- |
|- |
||
! scope="row" style="text-align: right;" | |
! scope="row" style="text-align: right;" | |
||
Line 299: | Line 342: | ||
|{{JKR(B)|51}} Jalan Sungai Limau Dua – Sungai Besar |
|{{JKR(B)|51}} Jalan Sungai Limau Dua – Sungai Besar |
||
|Diamond interchange |
|Diamond interchange |
||
|[[File:Jalan Klang-Teluk Intan (Malaysia Federal Highway 5), Sungai Besar 20240109 111818.jpg|150px|Sungai Besar Interchange]] |
|||
|- |
|- |
||
! scope="row" style="text-align: right;" | |
! scope="row" style="text-align: right;" | |
||
Line 305: | Line 349: | ||
|{{JKR(B)|44}} Jalan Sungai Panjang – Sungai Panjang, Tanjung Malim |
|{{JKR(B)|44}} Jalan Sungai Panjang – Sungai Panjang, Tanjung Malim |
||
|Diamond interchange |
|Diamond interchange |
||
|[[File:Jalan Klang-Teluk Intan (Malaysia Federal Highway 5), Kampung Sungai Haji Dorani 20231220 111543.jpg|150px|Sungai Panjang Interchange]] |
|||
|- |
|- |
||
! scope="row" style="text-align: right;" | |
! scope="row" style="text-align: right;" | |
||
Line 311: | Line 356: | ||
|Jalan Bahagia – Sekinchan |
|Jalan Bahagia – Sekinchan |
||
|Diamond interchange |
|Diamond interchange |
||
|[[File:Jalan Klang-Teluk Intan (Malaysia Federal Highway 5), Sekinchan 20231220 102105.jpg|150px|Sekinchan Interchange]] |
|||
|- |
|- |
||
| rowspan="4" |[[Kuala Selangor District|Kuala Selangor]] |
| rowspan="4" |[[Kuala Selangor District|Kuala Selangor]] |
||
Line 316: | Line 362: | ||
| colspan="4" style="text-align: center;" |Federal Route {{JKR|5}} stretch commences northbound / ends southbound |
| colspan="4" style="text-align: center;" |Federal Route {{JKR|5}} stretch commences northbound / ends southbound |
||
Expressway {{Jct|country=MYS|E2|32}} (under construction) ends northbound / commences southbound |
Expressway {{Jct|country=MYS|E2|32}} (under construction) ends northbound / commences southbound |
||
| |
|||
|- |
|- |
||
! scope="row" style="text-align: right;" | |
! scope="row" style="text-align: right;" | |
||
|3212 |
| align="center" |3212 |
||
|Tanjung Karang |
|Tanjung Karang |
||
|{{JKR|5}} [[Malaysia Federal Route 5|Federal Route 5]] - Tanjung Karang, Bagan Tengkorak |
|{{JKR|5}} [[Malaysia Federal Route 5|Federal Route 5]] - Tanjung Karang, Bagan Tengkorak |
||
|Under construction. Diamond interchange |
|Under construction. Diamond interchange |
||
| |
|||
|- |
|- |
||
! scope="row" style="text-align: right;" | |
! scope="row" style="text-align: right;" | |
||
| colspan="4" style="text-align: center;" |Tanjung Karang Toll Plaza<br> {{TnG}} {{TAG}} '''[[MyRFID|<span style="padding:1px .2em; background-color:#e6e6e6; color:#214682; font-weight:bold;">My</span><span style="padding:1px .2em; background-color:#e6e6e6; color:#ff0000; font-weight:bold;">RFID</span>]]'''<br> Start/End closed toll collection system |
|||
| colspan="4" style="text-align: center;" |Tanjung Karang Toll Plaza |
|||
{{TnG}} {{TAG}} '''[[MyRFID|<span style="padding:1px .2em; background-color:#e6e6e6; color:#214682; font-weight:bold;">My</span><span style="padding:1px .2em; background-color:#e6e6e6; color:#ff0000; font-weight:bold;">RFID</span>]]''' |
|||
Start/End closed toll collection system |
|||
(under construction) |
(under construction) |
||
| |
|||
|- |
|- |
||
! scope="row" style="text-align: right;" | |
! scope="row" style="text-align: right;" | |
||
|3210 |
| align="center" |3210 |
||
|Assam Jawa |
|Assam Jawa |
||
|{{JKR|54}} [[Malaysia Federal Route 54|Federal Route 54]] - Kuala Selangor, Bestari Jaya |
|{{JKR|54}} [[Malaysia Federal Route 54|Federal Route 54]] - Kuala Selangor, Bestari Jaya, Ijok |
||
{{Jct|country=MYS|E2|25}} – Rawang, Selayang, Puncak Alam, Kuang, Kuala Lumpur |
{{Jct|country=MYS|E2|25}} – Rawang, Selayang, Puncak Alam, Kuang, Kuala Lumpur |
||
|Trumpet interchange |
|Trumpet interchange |
||
| |
|||
|- |
|- |
||
| rowspan="6" |[[Klang District|Klang]] |
| rowspan="6" |[[Klang District|Klang]] |
||
! |
! |
||
| colspan="4" |Bukit Kapar Rest and Service Area (under construction; both directions; separated) |
| colspan="4" style="text-align: center;"| Bukit Kapar Rest and Service Area (under construction; both directions; separated) |
||
| |
|||
|- |
|- |
||
! scope="row" style="text-align: right;" |39.95 |
! scope="row" style="text-align: right;" |'''39.95''' |
||
|3208 |
| align="center" |3208 |
||
| |
|Bandar Bukit Raja North (Kapar) |
||
|{{JKR|5}} [[Malaysia Federal Route 5|Federal Route 5]] - Kapar |
|{{JKR|5}} [[Malaysia Federal Route 5|Federal Route 5]] - Kapar |
||
{{JKR|3217}} [[Malaysia Federal Route 3217|Federal Route 3217]] - Meru, Setia Alam |
{{JKR|3217}} [[Malaysia Federal Route 3217|Federal Route 3217]] - Meru, Setia Alam |
||
|Trumpet interchange |
|Trumpet interchange |
||
| |
|||
|- |
|- |
||
! scope="row" style="text-align: right;" |34.55 |
! scope="row" style="text-align: right;" |'''34.55''' |
||
|3207 |
| align="center" |3207 |
||
|Bandar Bukit Raja South |
|Bandar Bukit Raja South (NNKSB 2) |
||
|3207A<br>{{JKR|3217}} [[Malaysia Federal Route 3217|Federal Route 3217]] - Meru, Setia Alam |
|||
|3207A |
|||
{{JKR|3217}} [[Malaysia Federal Route 3217|Federal Route 3217]] - Meru, Setia Alam |
|||
3207B<br>{{Jct|country=MYS|E2|30}} – Port Klang {{Harbour sign}}, West Port {{Harbour sign}} |
|||
3207C<br>{{Jct|country=MYS|E2|1}} – Shah Alam, Subang, Damansara, Kuala Lumpur |
|||
3207B |
|||
{{Jct|country=MYS|E2|30}} – Port Klang {{Harbour sign}}, West Port {{Harbour sign}} |
|||
3207C |
|||
{{Jct|country=MYS|E2|1}} – Shah Alam, Subang, Damansara, Kuala Lumpur |
|||
|Half cloverleaf interchange; exit from northbound only |
|Half cloverleaf interchange; exit from northbound only |
||
| |
|||
|- |
|- |
||
! scope="row" style="text-align: right;" | |
! scope="row" style="text-align: right;" | |
||
|3206 |
| align="center" |3206 |
||
|NKVE-FHR2 |
|||
|Sungai Rasau (Federal Highway) |
|||
|{{JKR|2}} [[Federal Highway (Malaysia)|Federal Highway]] - Klang |
|3206A<br>{{JKR|2}} [[Federal Highway (Malaysia)|Federal Highway]] - Klang, Shah Alam, Petaling Jaya. |
||
3206B<br>{{Jct|country=MYS|E2|1}} -Kuala Lumpur, Damansara, Kuantan.<br> |
|||
{{Jct|country=MYS|E2|30}} - Bandar Baru Klang, Port Klang {{Harbour sign}}, West Port {{Harbour sign}}, North Port {{Harbour sign}}. |
|||
|Under construction; exit from Banting / southbound only |
|Under construction; exit from Banting / southbound only |
||
| |
|||
|- |
|- |
||
! scope="row" style="text-align: right;" | |
! scope="row" style="text-align: right;" | |
||
|3205 |
| align="center" |3205 |
||
|Sri Andalas |
|Sri Andalas |
||
|{{JKR|190}} [[Malaysia Federal Route 190|Federal Route 190]] - Taman Sri Andalas, Bukit Kemuning |
|{{JKR|190}} [[Malaysia Federal Route 190|Federal Route 190]] - Taman Sri Andalas, Bukit Kemuning |
||
|Under construction |
|Under construction; <br> Exit from northbound only |
||
| |
|||
|- |
|- |
||
! scope="row" style="text-align: right;" | |
! scope="row" style="text-align: right;" | |
||
|3204 |
| align="center" |3204 |
||
|Shah Alam Expressway (KESAS) |
|Shah Alam Expressway (KESAS) |
||
|{{Jct|country=MYS|E2|5}} – Pulau Indah {{Harbour sign}}, Klang, Shah Alam, Subang Jaya, Kuala Lumpur |
|{{Jct|country=MYS|E2|5}} – Pulau Indah {{Harbour sign}}, Klang, Shah Alam, Subang Jaya, Kuala Lumpur |
||
|Under construction; trumpet interchange |
|Under construction; trumpet interchange |
||
| |
|||
|- |
|- |
||
| rowspan="3" |[[Kuala Langat District|Kuala Langat]] |
| rowspan="3" |[[Kuala Langat District|Kuala Langat]] |
||
! scope="row" style="text-align: right;" | |
! scope="row" style="text-align: right;" | |
||
|3203 |
| align="center" |3203 |
||
|South Klang Valley Expressway (SKVE) |
|South Klang Valley Expressway (SKVE) |
||
|{{Jct|country=MYS|E2|26}} – Pulau Indah {{Harbour sign}}, Putrajaya, Cyberjaya, Kajang, Johor Bahru |
|{{Jct|country=MYS|E2|26}} – Pulau Indah {{Harbour sign}}, Putrajaya, Cyberjaya, Kajang, Johor Bahru |
||
|Trumpet interchange. Interchange without toll plaza; integrated toll system with SKVE |
|||
|Under construction; trumpet interchange |
|||
| |
|||
|- |
|- |
||
! scope="row" style="text-align: right;" | |
! scope="row" style="text-align: right;" | |
||
| colspan="4" style="text-align: center;" |Kota Seri Langat Toll Plaza<br>{{TnG}} {{TAG}} '''[[MyRFID|<span style="padding:1px .2em; background-color:#e6e6e6; color:#214682; font-weight:bold;">My</span><span style="padding:1px .2em; background-color:#e6e6e6; color:#ff0000; font-weight:bold;">RFID</span>]]'''<br>Start/End closed toll collection system |
|||
| colspan="4" style="text-align: center;" |Banting Toll Plaza |
|||
| |
|||
{{TnG}} {{TAG}} '''[[MyRFID|<span style="padding:1px .2em; background-color:#e6e6e6; color:#214682; font-weight:bold;">My</span><span style="padding:1px .2em; background-color:#e6e6e6; color:#ff0000; font-weight:bold;">RFID</span>]]''' |
|||
Start/End closed toll collection system |
|||
(under construction) |
|||
|- |
|- |
||
! scope="row" style="text-align: right;" | |
! scope="row" style="text-align: right;" | |
||
|3201 |
| align="center" |3201 |
||
|Banting |
|Banting |
||
|{{JKR|31}} Federal Route 31 - Banting, Morib, Dengkil, Kuala Lumpur International Airport (KLIA) {{Airport sign}} |
|{{JKR|31}} [[Jalan Banting–Semenyih|Federal Route 31]] - Banting, Morib, Dengkil, Kuala Lumpur International Airport (KLIA) {{Airport sign}} |
||
| |
|Trumpet interchange |
||
| |
|||
|} |
|} |
||
Latest revision as of 01:25, 5 October 2024
The West Coast Expressway (E32), abbreviated WCE, is an interstate controlled-access highway running along the west coast of Peninsular Malaysia. The 233-kilometre (145-mile) expressway is currently under construction, with several sections open for public use. Once completed, the expressway will run between Changkat Jering, Perak and Banting, Selangor, following federal routes 5 and 60 for most of its route. The expressway will operate in three sections, with sections of federal route 5 completing the missing connections; these sections will be upgraded to limited-access roads. The expressway is expected to be fully completed by the end of 2025,[1][2] except for a 10 km stretch from Section 7B which is expected to be completed by June 2026.[3]
The expressway is being built by Konsortium Lebuhraya Pantai Barat. Approval was given by the government for the construction, which was to begin from 20 December 2013 and was to be completed within five years.[4] It originally was given route code E28 but later changed to E32, and E28 was used by Sultan Abdul Halim Muadzam Shah Bridge. The project was delayed and actual construction began in May 2014. Currently, a 31.5-kilometre (19.6 mi) segment between Kapar and Assam Jawa,[5] a 19-kilometre (12 mi) segment from Hutan Melintang to Teluk Intan[6] and a 80-kilometre (50 mi) segment from Lekir to Taiping[7] are opened to traffic.
Once the expressway is completed, it will be the fourth longest in Peninsular Malaysia, after the North-South Expressway Northern Route, the East Coast Expressway and the North-South Expressway Southern Route.
Overview
[edit]Construction of the expressway is divided into eleven packages. Works for the first five packages commenced in May 2014, of which three packages are in Selangor while the other two are in Perak. The stretches between Tanjung Karang to Hutan Melintang and Teluk Intan to Kampung Lekir are using the existing stretches of federal route 5, both of which are currently being upgraded. As a result, the expressway will consist of three non-contiguous stretches of controlled-access expressway (JKR R6), i.e. from Banting to Tanjung Karang, Hutan Melintang to Teluk Intan and Lekir to Changkat Jering while the two stretches on federal route 5 are partial access highways (JKR R5) featuring grade-separated interchanges at major junctions, left-in/left-out junctions and at-grade U-Turns.[citation needed]
A spur link from Changkat Keruing to Siputeh (near Ipoh) in Perak which will be connected via an interchange with the main link is also in the plan. Construction of the spur link is however deferred. The spur link will consist of a controlled-access expressway (JKR R6) stretch from Changkat Keruing to Parit while the stretch between Parit to Siputeh will use the existing stretch of federal route 73 will be similarly upgraded like the two federal route 5 stretches of the main link package has been awarded to Gedeihen Engineering Sdn Bhd. The controlled-access expressway stretches will use a closed toll system like the North–South Expressway. Toll collection has started at all opened stretches of the expressway. The stretches on existing federal roads will remain toll-free.[citation needed]
Progress updates on construction of the expressway is updated monthly here.
On 25 May 2014, the construction of the expressway began. The groundbreaking ceremony for the new expressway was held near the Teluk Intan interchange in Teluk Intan, Perak.[citation needed]
Five interchanges (sections 4–5, 8–10) were expected to be opened in time for Eid al-Fitr in 2019[8] but a burst water pipe on 5 May 2019 delayed the opening of sections 4–5.[9]
On 31 May 2019, section 8 between Hutan Melintang and Teluk Intan in Perak was opened to traffic. The opening ceremony was officiated by the Deputy Minister of Works, Mohd. Anuar Tahir.[6] This followed by the opening of sections 9 and 10 between Lekir and Beruas, also in Perak on 23 September 2019 and officiated by Works Ministry secretary-general Datuk Dr Syed Omar Sharifuddin Syed Ikhsan.[7] The first section to open in Selangor was section 5 between Kapar and Bukit Raja and officiated by Malaysian Highway Authority director-general Datuk Mohd Shuhaimi Hassan. This stretch was opened to public on 10 December 2019.[5]
Land acquisition issues and alignment changes causing delay of the construction of section 7 (Assam Jawa–Tanjung Karang),[8] which was being completed by 2024 along with section 11 (Beruas–Taiping South).[10][11]
As of 21 November 2023, section 6 (Kapar – Assam Jawa) is opened to traffic along which steady progress being made at sections 7 and 11, with are the most integral sections of the expressway to be completed to ease traffic congestion at Tanjung Karang and along FT 60, especially during festive seasons.[12]
WCE group has the first right of refusal for Section 12 (Siputeh – Segari) which will cost RM600 million with 41 km stretch. There is a plan to extend the expressway all the way to Penang if it is feasible.[10]
There's also a proposal by the Johorean state government to extend the WCE to Melaka, Pontian, and Iskandar Puteri from Banting. If it is feasible, WCE will be the alternative route to the North South Expressway from Johor Bahru to Taiping.[13]
Route background
[edit]The northern terminus of the expressway will be located at Changkat Jering on the North–South Expressway Northern Route. The southern terminus will be located at Banting on Federal Route 31. The expressway will have interchanges to Trong, Beruas, Changkat Cermin, Sitiawan, Lekir, Teluk Intan, Hutan Melintang, Sabak Bernam, Sungai Besar, Sekinchan, Tanjung Karang, Kuala Lumpur–Kuala Selangor Expressway at Assam Jawa, Kapar, New North Klang Straits Bypass, New Klang Valley Expressway at Bukit Raja, Federal Highway at Klang, Sri Andalas, Shah Alam Expressway near Jalan Kebun and South Klang Valley Expressway.
12 sites have been identified as rest and services area with each area will have 2 petrol stations.[10]
Tolls
[edit]The expressway implements closed toll system where rates are calculated between entry and exit of the expressway. However toll collections are not implemented in Federal Route 5 upgraded sections, making the closed toll section divided into three sections, including the short section of Hutan Melintang - Teluk Intan as well where vehicles still need to go through entry and exit tolls despite not having interchanges in between.
As for now toll collection has begun in all the opened sections.
Toll rates
[edit]Class | Types of Vehicles | Rate (in Malaysian ringgit RM) |
---|---|---|
0 | Motorcycles | Free |
1 | Vehicles with 2 axles and 3 or 4 wheels excluding taxis | RM 2.90 |
2 | Vehicles with 2 axles and 5 or 6 wheels excluding buses | RM 5.80 |
3 | Vehicles with 3 or more axles | RM 8.70 |
4 | Taxis | RM 1.50 |
5 | Buses | RM 2.20 |
Junction list
[edit]This section is missing kilometre posts for junctions. |
State | District | km | Interchange | Name | Destination | Note | Photograph |
---|---|---|---|---|---|---|---|
Perak | Larut, Matang & Selama | 3238 | Taiping Selatan | 3238A FT 60 Federal Route 60- Trong, Bendang Siam, Kg. Changkat Ibol. 3238B 3238C |
Cloverleaf Diamond Fused Interchange | ||
Taiping Selatan Toll Plaza Touch 'n Go SmartTAG MyRFID Start/End closed toll collection system |
|||||||
3237 | Trong | FT 60 Federal Route 60 - Trong | Trumpet interchange. | ||||
Sg. Nyior Rest and Service Area (Partially completed; both directions; separated) | |||||||
Manjung | 241.63 | 3235 | Beruas | FT 73 Federal Route 73 - Beruas, Parit, Batu Gajah | Trumpet interchange. | ||
222.55 | 3233 | Changkat Cermin | FT 5 Federal Route 5 - Ayer Tawar, Bota, Seri Iskandar, Batu Gajah, Ipoh | Trumpet interchange | |||
216.5 | Ayer Tawar Rest and Service Area (under construction; northbound)
West Coast Expressway North Region Office (northbound) |
||||||
210.1 | 3232 | Sitiawan Utara | FT 5 Federal Route 5 - Sitiawan, Ayer Tawar
FT 100 Federal Route 100 - Seri Manjung, Lumut, Pelabuhan Lumut , Pulau Pangkor , Teluk Senangin |
Trumpet interchange | |||
208.0 | Sungai Wangi Rest and Service Area (under construction; southbound) | ||||||
202.89 | 3231 | Sitiawan Selatan | FT 5 Federal Route 5 - Sitiawan
FT 60 Federal Route 60 - Seri Manjung, Lumut, Pelabuhan Lumut , Pulau Pangkor , Teluk Batik |
Trumpet interchange | |||
197.71 | Lekir Toll Plaza Touch 'n Go SmartTAG MyRFID Start/End closed toll collection system |
||||||
196.24 | 3230 | Lekir | FT 5 Federal Route 5 - Lekir (Batu 9-11) | Diamond Interchange | |||
193.59 | Expressway West Coast Expressway ends southbound / commences northbound
Federal Route FT 5 stretch commences southbound / ends northbound |
||||||
Batu 14 Lekir | FT 5 Federal Route 5 - Lekir, Kg Koh, Sitiawan, Seri Manjung, Lumut | LiLO interchange, entry/exit only for northbound traffic | |||||
Kampung Kayan | Kampung Kayan | LiLO Interchange, entry/exit only for northbound traffic | |||||
Perak Tengah | Bagan Datuk Bridge (Sultan Nazrin Shah Bridge) | FT 312 - Bagan Datuk, Selekoh, Rungkup | LiLO Interchange, entry/exit only for northbound traffic | ||||
Jalan Trans Perak | A266 Lebuh Pemaisuri - FELCRA Seberang Perak, Kampung Gajah, Bota Kiri | Directional T-junction with traffic lights | |||||
Jalan Kota Setia | A145 Kota Setia, Kampung Sungai Besar | LiLO Interchange, entry/exit only for northbound traffic | |||||
Jalan Bota Kiri | A18 Ulu Dedap, Kampung Gajah, Bota Kiri | LiLO Interchange, entry/exit only for southbound traffic | |||||
Hilir Perak | Sungai Rubana | Kampung Sungai Rubana | LiLO Interchange, entry/exit only for northbound traffic | ||||
Sungai Durian | Sungai Durian, Selat Masjid | LiLO interchange, entry/exit only for southbound traffic. | |||||
Tanjung Sari | Tapak Semenang, Tanjung Sari, Teluk Bharu | LiLO Interchange, entry/exit only for northbound traffic | |||||
Sultan Yusuf Bridge | |||||||
162.07 | Federal Route FT 5 stretch commences northbound / ends southbound
Expressway West Coast Expressway ends northbound / commences southbound |
||||||
3223 | Teluk Intan | FT 58 Federal Route 58 - Teluk Intan, Bidor
FT 5 Federal Route 5 - Hutan Melintang, Bagan Datuk |
Diamond interchange. | ||||
Teluk Intan Toll Plaza Touch 'n Go SmartTAG MyRFID Start/End closed toll collection system |
|||||||
Teluk Intan Rest and Service Area (both directions; separated) | |||||||
Bagan Datuk | Hutan Melintang Toll Plaza Touch 'n Go SmartTAG MyRFID Start/End closed toll collection system |
||||||
3222 | Hutan Melintang | FT 5 Federal Route 5 - Hutan Melintang
FT 69 Federal Route 69 - Bagan Datuk |
Diamond interchange. | ||||
143.99 | Expressway West Coast Expressway ends southbound / commences northbound
Federal Route FT 5 stretch commences southbound / ends northbound |
||||||
Perak–Selangor border | Bernam River Bridge | ||||||
Selangor | Sabak Bernam | Sabak Bernam | B53 Jalan Gertak Tinggi – Sabak Bernam | Diamond interchange | |||
Sungai Air Tawar | B55 Jalan Sungai Air Tawar – Sungai Air Tawar, Bagan Nakhoda Omar | Diamond interchange | |||||
Sungai Besar | B51 Jalan Sungai Limau Dua – Sungai Besar | Diamond interchange | |||||
Sungai Panjang | B44 Jalan Sungai Panjang – Sungai Panjang, Tanjung Malim | Diamond interchange | |||||
Sekinchan | Jalan Bahagia – Sekinchan | Diamond interchange | |||||
Kuala Selangor | Federal Route FT 5 stretch commences northbound / ends southbound
Expressway West Coast Expressway (under construction) ends northbound / commences southbound |
||||||
3212 | Tanjung Karang | FT 5 Federal Route 5 - Tanjung Karang, Bagan Tengkorak | Under construction. Diamond interchange | ||||
Tanjung Karang Toll Plaza Touch 'n Go SmartTAG MyRFID Start/End closed toll collection system (under construction) |
|||||||
3210 | Assam Jawa | FT 54 Federal Route 54 - Kuala Selangor, Bestari Jaya, Ijok
Kuala Lumpur–Kuala Selangor Expressway – Rawang, Selayang, Puncak Alam, Kuang, Kuala Lumpur |
Trumpet interchange | ||||
Klang | Bukit Kapar Rest and Service Area (under construction; both directions; separated) | ||||||
39.95 | 3208 | Bandar Bukit Raja North (Kapar) | FT 5 Federal Route 5 - Kapar
FT 3217 Federal Route 3217 - Meru, Setia Alam |
Trumpet interchange | |||
34.55 | 3207 | Bandar Bukit Raja South (NNKSB 2) | 3207A FT 3217 Federal Route 3217 - Meru, Setia Alam 3207B 3207C |
Half cloverleaf interchange; exit from northbound only | |||
3206 | NKVE-FHR2 | 3206A FT 2 Federal Highway - Klang, Shah Alam, Petaling Jaya. 3206B |
Under construction; exit from Banting / southbound only | ||||
3205 | Sri Andalas | FT 190 Federal Route 190 - Taman Sri Andalas, Bukit Kemuning | Under construction; Exit from northbound only |
||||
3204 | Shah Alam Expressway (KESAS) | Shah Alam Expressway – Pulau Indah , Klang, Shah Alam, Subang Jaya, Kuala Lumpur | Under construction; trumpet interchange | ||||
Kuala Langat | 3203 | South Klang Valley Expressway (SKVE) | South Klang Valley Expressway – Pulau Indah , Putrajaya, Cyberjaya, Kajang, Johor Bahru | Trumpet interchange. Interchange without toll plaza; integrated toll system with SKVE | |||
Kota Seri Langat Toll Plaza Touch 'n Go SmartTAG MyRFID Start/End closed toll collection system |
|||||||
3201 | Banting | FT 31 Federal Route 31 - Banting, Morib, Dengkil, Kuala Lumpur International Airport (KLIA) | Trumpet interchange |
References
[edit]- ^ "Hot spots coming up along WCE". Edgeprop.my. Retrieved 19 December 2019.
- ^ TAHIR, MOHD IZZATUL IZUAN (6 December 2022). "Lebuhraya Taiping-Banting beroperasi sepenuhnya 2025". Sinar Harian (in Malay). Retrieved 1 June 2023.
- ^ "Bumpy path to profitability | The Star". www.thestar.com.my. Retrieved 20 August 2020.
- ^ http://www.wce.com.my/media-updates/New-beginning-for-KEuro [dead link]
- ^ a b Chan, Dawn (1 December 2019). "West Coast Expressway opens Section 5 stretch to traffic tonight". NST Online. Retrieved 19 December 2019.
- ^ a b Arif, Zahratulhayat Mat (3 May 2019). "Section 8 of West Coast Expressway opens today". NST Online. Retrieved 19 December 2019.
- ^ a b Bernama (2 September 2019). "Sections 9, 10 of WCE now open". NST Online. Retrieved 19 December 2019.
- ^ a b "West Coast Expressway – Media Updates – WCE back in the spotlight". wce.com.my. Retrieved 19 December 2019.
- ^ Thiagarajan, Tara (9 May 2019). "Photos Show Extent Of Damage to Collapsed Expressway That Caused Unexpected Water Shortage in Klang – WORLD OF BUZZ". worldofbuzz.com/. Retrieved 19 December 2019.
- ^ a b c "In high gear to complete 233km West Coast Expressway | The Star Online". The Star. Malaysia. Retrieved 14 January 2020.
- ^ "WCE highway completion delayed to 2024 | The Malaysian Reserve". The Malaysian Reserve. Malaysia. Retrieved 3 November 2020.
- ^ BERNAMA (20 November 2023). "WCE SECTION 6 OPENS AT MIDNIGHT, NO TOLL UNTIL JAN 2, 2024". BERNAMA. Retrieved 20 November 2023.
- ^ "Rancangan Struktur Negeri Johor 2030 (RSNJ 2030)" (PDF). PLANMalaysia. 1 (1): 78. 26 March 2020 – via Government of Malaysia, Ministry of Housing and Local Government (Kementerian Perumahan dan Kerajaan Tempatan; KPKT).