Jump to content

Wind power in Spain

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Youssefsan (talk | contribs) at 20:40, 7 November 2011 (External links: *[https://demanda.ree.es/eolica.html Wind production in Spain by date] *[https://demanda.ree.es/demanda.html Percentage of wind production in Spain by date]). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Aerial view of a wind farm in Spain
A wind farm in a mountainous area in Galicia, Spain

Spain is the world's fourth biggest producer of wind power, after China, the United States and Germany, with an installed capacity of 19,959 megawatts (MW) at the end of 2010, a rise of 1,609 MW for the year.[1][2] Wind energy has consolidated as the third technology of the Spanish power system in 2010, having reached an output of 42,976 GWh, only overtaken by thermal gas combined cycle at 68,828 GWh and nuclear that reached 61,944 GWh. In 2009, for the first time in the annual calculation, wind overtook coal that produced 33,844 GWh. In 2010, wind energy has covered 16% of the demand, compared to 11.5% in 2008 and 13.8% in 2009.[3]

The largest producer of wind power in Spain at the end of 2009 is Iberdrola, with 25.5 percent of capacity, followed by Acciona on 20.9 percent and NEO Energia (EDP Renewables) with 8.3 percent.[4] On particular windy days, wind power generation has surpassed all other electricity sources in Spain, including nuclear.[5] On November 8, 2009 wind power production reached the highest percentage of electricity production till then, with wind farms covering 53% of the total demand.[2][6] On November 9, 2010, the maximum power output was reached being 14,960 MW.[7] On November 6, 2011 a new record was reached with 59% of power generated by wind power. [8]

Installed windpower capacity (MW)
Rank Autonomous Region 2008[9] 2009[10] 2010[11]
1 Castile and León 3 334.04 3 882.72 4 803.82
2 Castile-La Mancha 3 415.61 3 669.61 3 709.19
3 Galicia 3 145.24 3 231.81 3 289.33
4 Andalusia 1 794.99 2 840.07 2 979.33
5 Aragon 1 749.31 1 753.81 1 764.01
6 Valencian Community 710.34 986.99 986.99
7 Navarre 958.77 961.77 968.37
8 Catalonia 420.44 524.54 851.41
9 La Rioja 446.62 446.62 446.62
10 Asturias 304.30 355.95 355.95
11 Basque Country 152.77 152.77 153.25
12 Murcia 152.31 152.31 189.91
13 Canary Islands 134.09 138.34 138.92
14 Cantabria 17.85 17.85 35.30
15 Balearic Islands 3.65 3.65 3.65
Spain total (MW) 16 740.32 19 148.80 20 676.05

The intended wind energy capacity to be installed in the autonomous regions by 2010-2011 consists of 20 000 MW.[12]

“Spain is currently undergoing a renewable-energy revolution, with the Navarre region set to be the first in Europe to be self-sufficient in renewable energy”.[13] The US rating agency Standard & Poors, in a current investigation of standard of living in Europe, ranked Navarre, whose primary source of renewable energy is wind power, uppermost among the 17 autonomous regions of Spain.[13] Navarre, Europe’s sixth largest producer of wind power, currently sustains approximately 70 percent of its electricity needs from renewable energy sources, wind farms being used most extensively, and has a 900-megawatt capacity of installed wind power.

Navarre lacks thermal, nuclear, coal, oil, gas fields, or hefty hydro-electric power stations, but does possess considerable renewable resources, which the Government of Navarre pursued to drop its foreign energy dependence.[14] “Navarre’s economic success is a function of its small population (only 500 000 people), low unemployment, rich agricultural traditions, and most recently, a boom in rural tourism”.[13] Navarre was entirely reliant on imported energy until wind-power development and utilization began progress in 1996.[13]

Galicia

Galicia currently leads in wind power development in the autonomous regions for the third consecutive year with an increase in wind power of 264 MW, succeeding Castilla La Mancha, which exceeded the development goal of 1000 MW, and followed by Aragon, Navarre, and Castile-Leon, and the remaining autonomous regions.[12] Castilla Leon and La Rioja have initiated wind energy production, and the north-eastern area of Soria also holds the capacity to be an efficient producer; the possession of workable resources for wind power development is also represented in the Cantabrian, eastern and south-eastern coasts.[12]

Research

Largely concerned with advancing energy efficiency use in Spain, the Institute for Energy Saving and Diversification (IDEA) also seeks to expand renewable energy sources and energies.[12] “If Spain meets its goal of generating 30 percent of its electricity needs from renewable power by 2010, with half of that amount coming from wind power, it will reduce carbon dioxide emissions by 77 million tons”.[15]

Research concerning the production of hydrogen from the use of water by a wind farm is occurring at a newly installed laboratory in the Universidad Pública de Navarra under an agreement between Energía Hidroeléctrica de Navarra, Stuart Energy Systems of Canada, and Statkraft of Norway.[16] The lab will replicate the power generation environment of a wind farm and examine the effects of an electrolyzer.[16] “An initial phase of the experiment will utilize a budget of 180,000 euro, with later phases evaluating the use of hydrogen in public buses in the city of Pamplona, and a wind turbine designed specifically for hydrogen production”.[16]

Concentrated research is occurring concerning wind measurement in the Albacete region at Higueruela.[12]

Wind power industry

“The business framework for the installed capacity of wind power in the Autonomous Regions was made up of more than 170 companies that included manufacturers (wind turbines, blades, towers, generators, multipliers, electrical equipment, etc.), suppliers (hydraulic and electrical equipment and equipment for controlling and regulating), mechanical construction and public works companies, installation companies and maintenance, exploitation, and engineering companies in 2003”.[12]

“Spanish companies are leading the way in turbine innovation by increasing the size of turbines while reducing turbine weight, and are also developing new technologies to take advantage of wind changes and split-second power outages”.[15]

The Spanish wind energy sector now hosts the involvement of over 500 companies, with approximately 150 wind turbine production plants and their machinery across the Spanish regions.[17] The assets of the Spanish industry are being noticed and acted upon by financial analysts, as United States Ernst and Young in 2005 ranked the wind market in Spain among the uppermost in its index of “long-term country attractiveness”.[15] Including those indirectly employed in supplying components and services, the total number of jobs supported by Spain’s wind industry has reached more than 30 000, and is estimated to double to 60 000 by 2010” (2005).[17]

Gamesa Eólica

“Basque Country’s engineering group, Gamesa Corporación Tecnológica, the second-largest global wind turbine manufacturer, currently manufactures and exports nearly 20 percent of the world’s wind turbines, and is aiming to become a market leader in Britain’s renewable energy sector through its local subsidiary, Gamesa Energy UK”.[13] The company values the distinctive geographical setting of Spain as a benefit to Spanish companies competing in the global arena.[15] Gamesa Eólica currently operates plants in Spain, The US and China. It has projects in many other parts of the world including Egypt, Germany, Ireland, Italy, Japan, Korea, and Portugal.[15] Gamesa opened a manufacturing plant for wind turbine generator blades in Philadelphia, Pennsylvania in 2005, creating 500 part-time building and operations jobs and 236 permanent manufacturing jobs; the building, operation, and upkeep of Gamesa’s wind farms, in conjunction with its two Philadelphia offices and production plant, formed about 1,000 jobs in the state over a five-year period.[18] The company seeks expansion into Greece, Taiwan, and the United Kingdom.[15]

Acciona Energy

Acciona Energy (Acciona Energía), the biggest global wind-park developer, currently operates in Australia, Canada, France, Germany, Morocco, Spain, and the United States.[15] The company credits its success to its initial stages in Navarre during 1994. Its line of work involves wind-farm operation, turbine manufacture, and the development of wind-power plants, and the company intends to expand into China, Ireland, and the United Kingdom.[15]

Iberdrola

According to Cohn et al., “Iberdrola, Spain’s No. 2 utility, set up its first wind farm in 2000 and overtook FPL Energy of Florida in 2004 as the world’s largest wind farm operator” (2005). Iberdrola currently holds functioning facilities in Brazil, France, Greece, Italy, Mexico, Portugal, Spain, the United States and the United Kingdom, and is continuing to develop wind farms in Europe and Latin America[15][3].

As of 2008, Iberdrola plans to develop six offshore wind farm projects with a combined generation capacity of 3000 MW at locations off the coasts of the Spanish Atlantic provinces of Cadiz, Huelva and the Mediterranean province of Castellon.[19]

MTorres

MTorres initiated their activities in the Wing Energy field in 1998, with the launch of their newly developed Wind Turbine TWT-1.5/70, a 1500 KW variable-speed direct-drive multipole Wind Turbine with a full-power converter and a 70 meters rotor diameter.

Exports

The national Spanish wind energy industry has begun to export its wind generators by forming contracts for the erection of wind farms in China, India, and Mexico, as well as Cuba, where work began in 1998 (2007). They also have contracts at a highly developed stage with Portugal, Turkey, Tunisia, Egypt, Brazil, and Argentina.[12]

Alstom Ecotècnia, the second largest Spanish manufacturer focused on decreasing the weight of its wind turbines, currently manages wind production facilities in Cuba, France, India, Japan, Portugal, and Spain.[15] The company plans on expanding operations into China and Italy, and was one of the original companies to put in a wind-power generator in Spain.[15] The existing wind energy capacity for major companies in Spain is the following: Gamesa Eólica, 3281 MW; Made, 803 MW; Neg Micon, 715 MW; Ecotècnia, 446 MW; G. Electric, 343 MW; Izar-Bonus, 317 MW; Desa & AWP, 121 MW; Enercon, 58 MW; Lagerwey, 38 MW; and Others, 113 MW (2007).[12]

Future development

According to Graber,[15] an area of needed improvement for the wind power sector includes “more-detailed prediction of meteorological information that could increase efficiency of wind turbines, allowing electric companies and wind-farm operators to predict with a high level of accuracy when wind will pick up and slow down” (2005). Additionally, three factors will control the further progress of wind power development in Spain: the capability of the wind farms network to hold all the electricity harnessed by wind power, predominantly in off-peak times, the cost of energy, and the environmental effect that the abundance of wind farm development in Spain could turn out.[14] The Spanish wind power industry will be confronted with the following issues in the immediate future:[14]

  • formulating its development to be congruent with required supply agreements by the national electricity supply operator
  • guaranteeing that the installation of wind farms occurs with recognition of the environment
  • synchronizing wind power development of the 17 autonomous regions
  • trimming down the investment costs to acquire sufficient returns with declining energy prices in the upcoming years.

It is also noteworthy that the supportive Spanish policies for wind power development have resulted in severe competition for construction sites among major companies.[14] Political leaders in the autonomous communities have been frazzled by the numerous applications for wind farm construction.[14] Additionally, according to Toke et al.,[20] “one in five applications receives significant opposition from local wildlife conservation groups, accounting for considerable delays, and the planning for specific schemes is the preserve of the regional governments” (2007). Finally, local possession of wind power is not present in Spain, but does not appear to take away from further development of wind power in Spain since a much smaller and weaker quantity of local anti-wind farm grid population inhabits the country.[20]

“Sustained and robust expansion in Spain, a result of recent efforts to clarify policy structures, the offshore sectors in the UK and Germany, both of which are gaining serious momentum, and growth in newer markets, such as Italy, France, and Portugal, combine to create positive growth prospects for the industry, resulting in record level investments that will be well in excess of Euro 30 billion through 2010”.[21] However, a further obstacle concerning wind power development needs to be tackled before Spain can achieve these ambitious objectives: construction of a central control center for all the Spanish wind farms, analogous to the control center used for traditional power plants.[15] “Because a great amount of wind power is generated in northern Spain, a stronger connection to France and the rest of Europe to better manage power surges and dips is paramount”.[15]

Opposition

With some exceptions, there has been little opposition to the installation of inland wind parks. However, the projects to build offshore parks have been more controversial. According to Cohn et al.,[22] “On Spain’s Atlantic coast, bird lovers, fisherfolk, and tourism officials have joined forces to oppose the creation of offshore wind farms, claiming that they wreak havoc on birds’ migratory patterns, obstruct navigation channels, and blight the coastline” (2005). The proposal of building the biggest offshore wind power production facility in the world in southwestern Spain on the spot of the 1805 Battle of Trafalgar.[23] has been met with strong oppostition from the towns in the coast of Cádiz, who fear for tourism and fisheries in the area.[24] There have also been complaints by the British, who claim that the area is a war grave and that any development of the area could destroy archaeological evidence of the historic battle.[23]

See also

References

Cited
  1. ^ Spain wind power firms see steady growth in 2009
  2. ^ a b International Energy Agency (2009). IEA Wind Energy: Annual Report 2008 p. 235.
  3. ^ name=REE reviews. Wind Energy has consolidated as the third technology of the power system
  4. ^ http://www.aeeolica.es/userfiles/file/notas-de-prensa/2010/NP%20AEE%20_%20potencia%20instalada%20febrero%202010.pdf
  5. ^ Récord de energía eólica por el vendaval
  6. ^ < La energía eólica supera por primera vez la mitad de la producción eléctrica [1]>
  7. ^ http://www.ree.es/sala_prensa/web/notas_detalle.aspx?id_nota=189
  8. ^ http://www.elpais.com/articulo/economia/aportacion/energia/eolica/red/marca/nuevo/record/elpepueco/20111107elpepueco_4/Tes
  9. ^ "Spanish Wind Energy Association (aae) statistics" (PDF).
  10. ^ "La eólica instaló en España 2.459 MW en 2009 pero este año se reducirán a cerca de 1.000 MW" (PDF). Spanish Wind Energy Association (AEE).
  11. ^ "Spanish Wind Energy Association (AAE) Map".
  12. ^ a b c d e f g h Montes, G (2007). "The current situation of wind energy in Spain". Renewable and Sustainable Energy Reviews. 11 (3). Elsevier: 467–481. doi:10.1016/j.rser.2005.03.002. {{cite journal}}: Unknown parameter |coauthors= ignored (|author= suggested) (help)
  13. ^ a b c d e Stewart, Jules (2006). "Windmills of the Green Mind". Geographical. 78 (3): 56–58. {{cite journal}}: Cite has empty unknown parameter: |coauthors= (help)
  14. ^ a b c d e Alberto, Miguel Ichaso (2000-8). "Wind power development in Spain, the model of Navarra" (PDF). DEWI Magazine. Retrieved 2007-01-28. {{cite news}}: Check date values in: |date= (help) [dead link]
  15. ^ a b c d e f g h i j k l m n Graber, Cynthia (2005-12-14). "Wind Power in Spain". MIT Technology Review. Retrieved 2007-01-16.
  16. ^ a b c "Spanish utility to produce H2 from wind power". Fuel Cells Bulletin.: 5. 10-2004. {{cite journal}}: Check date values in: |date= (help); Cite has empty unknown parameter: |coauthors= (help)
  17. ^ a b "Spain's wind power industry on a roll". Renewable Energy Access. 2005-08-24. Retrieved 2007-01-28.
  18. ^ Curry, Jennifer (2005-02-18). "Spanish wind company to build plant in region". Pittsburgh Business Times. Retrieved 2007-01-28.
  19. ^ Iberdrola Plans Six Offshore Wind Projects
  20. ^ a b Toke, D (2007). "Wind power development outcomes: How can we account for the differences?". Renewable and Sustainable Energy Reviews. 11 (3). Elsevier: 467–481. doi:10.1016/j.rser.2006.10.021. {{cite journal}}: Unknown parameter |coauthors= ignored (|author= suggested) (help)
  21. ^ Hays, Keith (2005). "European Wind". Refocus. 6 (2): 30–5. doi:10.1016/S1471-0846(05)00327-6. {{cite journal}}: Cite has empty unknown parameter: |coauthors= (help)
  22. ^ Cohn, Laura (2005-07-11). "Wind power has a head of steam". European Business. {{cite journal}}: Unknown parameter |coauthors= ignored (|author= suggested) (help)
  23. ^ a b "Grave developments for battle site". The Engineer.: 6. 2003-06-13. {{cite journal}}: Cite has empty unknown parameter: |coauthors= (help)
  24. ^ <Las eólicas preparan su inmersión [2]>