Langley Park Wind Farm
Appearance
Langley Park Wind Farm | |
---|---|
Country | England, United Kingdom |
Location | Langley Park, County Durham |
Coordinates | 54°47′42″N 1°40′02″W / 54.795°N 1.6672°W |
Status | Operational |
Commission date | December 2008 |
Owner | EDF Energy |
Operator | Cumbria Wind Farms |
Wind farm | |
Hub height | 59m |
Rotor diameter | 82m |
Site elevation | 1552 ft |
Power generation | |
Units operational | 4 × 2.05 MW |
Make and model | REpower Systems: MM82 |
Nameplate capacity | 8.2 MW |
Langley Park Wind Farm is a wind farm near Langley Park, County Durham, England. It was developed by EDF Energy and is operated by Cumbria Wind Farms, the farm has a nameplate capacity of 8.2 MW, containing four REpower Systems' MM82 turbines each rated at 2.05MW.[1]
In 2008 EDF accepted that it had failed to check the impact of the turbines on digital television reception, after residents of villages where the turbines lay on a line-of-sight to the local TV transmitter complained of a loss of signal strength and severe Freeview Digital Services disruption, particularly when the turbine blades rotate.[2][3]
References
- ^ Association, RenewableUK. "RenewableUK". Archived from the original on 2 November 2012.
- ^ Wood, Kerry (6 November 2008). "Company admits wind farms ruined TV reception".
- ^ "Freeview TV disruption in Langley park". Archived from the original on 28 March 2010. Retrieved 16 March 2010.