North Station: Difference between revisions
→Boston Garden Towers changes: faregates |
Undid revision 1248919228 by 4300streetcar (talk) Slightly prefer the sunnier vibe of the old picture to the new picture including an Amtrak trian |
||
(44 intermediate revisions by 21 users not shown) | |||
Line 1: | Line 1: | ||
{{short description|Train station in Boston}} |
{{short description|Train station in Boston, Massachusetts, US}} |
||
{{for multi|the adjacent subway station|North Station (subway)|other stations by this name|North Station (disambiguation)}} |
{{for multi|the adjacent subway station|North Station (subway)|other stations by this name|North Station (disambiguation)}} |
||
{{Infobox station |
{{Infobox station |
||
| name = North Station |
| name = North Station |
||
| style = MBTA |
| style = MBTA |
||
| image = North Station from |
| image = North Station from north August 2024.jpg |
||
| caption = [[MBTA Commuter Rail]] trains at North Station in |
| caption = [[MBTA Commuter Rail]] trains at North Station in August 2024 |
||
| address = 126 Causeway Street |
| address = 126 Causeway Street |
||
| borough = [[Boston]], Massachusetts |
|||
| country = United States |
| country = United States |
||
| coordinates = {{coord|42.36630|-71.06222|display=inline,title |type:railwaystation_region:US-MA}} |
| coordinates = {{coord|42.36630|-71.06222|display=inline,title |type:railwaystation_region:US-MA}} |
||
| owned = [[Massachusetts Bay Transportation Authority]] |
| owned = [[Massachusetts Bay Transportation Authority]] |
||
| line = [[Boston & Maine Railroad|Western Route]]<br/>[[Eastern Railroad|Eastern Route]]<br/>[[Boston and Lowell Railroad|New Hampshire Main Line]]<br/>[[Fitchburg Railroad|Fitchburg Route]] |
|||
| platform = 5 [[island platform]]s |
| platform = 5 [[island platform]]s |
||
| tracks = 10 |
| tracks = 10 |
||
| connections = {{rint|boston|subway}} {{rint|boston|Green}} {{rint|boston|Orange}} at [[North Station (subway)|North Station]]<br />{{bus icon}} [[MBTA bus]]: {{ |
| connections = {{rint|boston|subway}} {{rint|boston|Green}} {{rint|boston|Orange}} at [[North Station (subway)|North Station]]<br />{{bus icon}} [[MBTA bus]]: {{MBTA bus links|North Station}} <br />{{bus icon|12px}} {{MBTA other buses|North Station}} |
||
| parking = 1,275 spaces (privately owned garage)<br />38 accessible spaces |
| parking = 1,275 spaces (privately owned garage)<br />38 accessible spaces |
||
| bicycle = 20 spaces; [[Bluebikes]] dock |
| bicycle = 20 spaces; [[Bluebikes]] dock |
||
| |
| accessible = Yes<!-- all modes--> |
||
| code = {{Amtrak code|BON}} |
| code = {{Amtrak code|BON}} |
||
| zone = 1A (MBTA Commuter Rail) |
| zone = 1A (MBTA Commuter Rail) |
||
| opened = 1893 ([[North Union Station]]) |
| opened = 1893 ([[#North Union Station|North Union Station]]) |
||
| rebuilt = 1928, 1989, 1995, January 2007 |
| rebuilt = 1928, 1989, 1995, January 2007 |
||
| mpassengers = |
| mpassengers = |
||
Line 25: | Line 27: | ||
| services_collapsible = yes |
| services_collapsible = yes |
||
| services = {{Adjacent stations |
| services = {{Adjacent stations |
||
|system1=Amtrak|line1=Downeaster|right1=Woburn |
|system1=Amtrak |
||
|line1=Downeaster|right1=Woburn |
|||
|system2=MBTA |
|system2=MBTA |
||
|line2=Fitchburg|left2=Porter |
|line2=Fitchburg|left2=Porter |
||
|line3=Lowell|left3=West Medford |
|line3=Lowell|left3=West Medford |
||
|line4=Haverhill|left4= |
|line4=Haverhill|left4=Ballardvale|note-mid4=(limited service via [[Wildcat Branch]])|to-left4=Haverhill |
||
|line5=Haverhill|right5=Malden Center |
|line5=Haverhill|right5=Malden Center |
||
|line6=Newburyport|right6=Chelsea |
|line6=Newburyport|right6=Chelsea |
||
}} |
}} |
||
| other_services_header = Former services |
| other_services_header = Former services |
||
| other_services_collapsible = yes |
| other_services_collapsible = yes |
||
| other_services = {{Adjacent stations|system1=MBTA |
| other_services = {{Adjacent stations |
||
|system1=MBTA |
|||
|line1=Lexington|left1=Cambridge|note-mid1= |
|line1=Lexington|left1=Cambridge|note-mid1=(closed 1977) |
||
|line2=Central Mass|left2=Cambridge|note-mid2= |
|line2=Central Mass|left2=Cambridge|note-mid2=(closed 1971) |
||
| |
|system3=Boston and Maine Railroad |
||
|line3=Boston-Northampton|left3=Cambridge |
|||
⚫ | |||
|line4=Fitchburg|left4=Cambridge |
|||
⚫ | |||
|line5=Boston-Troy|left5=Cambridge |
|||
|line6=Watertown|left6=Union Square |
|||
|line7=Boston-Concord<!-- Lowell -->|left7=Prospect Hill |
|||
|line8=Main Line|right8=East Somerville |
|||
|line9=Eastern Route|right9=East Somerville |
|||
⚫ | |||
⚫ | |||
|mapframe = yes |
|||
|mapframe-marker-color = #{{rcr|MBTA}} |
|||
|mapframe-marker = rail |
|||
|mapframe-zoom = 12 |
|||
}} |
}} |
||
'''North Station''' is a [[commuter rail]] and [[intercity rail]] terminal station in [[Boston]], [[Massachusetts]]. It is served by four [[MBTA Commuter Rail]] lines – the [[Fitchburg Line]], [[Haverhill Line]], [[Lowell Line]], and [[Newburyport/Rockport Line]] – and the [[Amtrak]] {{lnl|Amtrak|Downeaster}} intercity service. The concourse is located under the [[TD Garden]] arena, with the platforms extending north towards drawbridges over the [[Charles River]]. The [[North Station (subway)|eponymous subway station]], served by the [[Green Line (MBTA)|Green Line]] and [[Orange Line (MBTA)|Orange Line]], is connected to the concourse with an underground passageway. |
'''North Station''' is a [[commuter rail]] and [[intercity rail]] terminal station in [[Boston]], [[Massachusetts]]. It is served by four [[MBTA Commuter Rail]] lines – the [[Fitchburg Line]], [[Haverhill Line]], [[Lowell Line]], and [[Newburyport/Rockport Line]] – and the [[Amtrak]] {{lnl|Amtrak|Downeaster}} intercity service. The concourse is located under the [[TD Garden]] arena, with the platforms extending north towards drawbridges over the [[Charles River]]. The [[North Station (subway)|eponymous subway station]], served by the [[Green Line (MBTA)|Green Line]] and [[Orange Line (MBTA)|Orange Line]], is connected to the concourse with an underground passageway. |
||
==Description== |
== Description == |
||
[[File:North Station platforms and drawbridges, April 2014.jpg|thumb|left|Platforms and drawbridges at North Station]] |
[[File:North Station platforms and drawbridges, April 2014.jpg|thumb|left|Platforms and drawbridges at North Station]] |
||
The concourse of the station, named for longtime [[Boston Celtics]] coach and executive [[Red Auerbach]], is located under the [[TD Garden]] arena, with two entrances from Causeway Street, as well as entrances from Nashua Street to the west. Five [[island platform]]s serving ten tracks run north from the concourse. Just north of the platforms, a [[Charles River Bridge (Commuter Rail)|pair of two-track drawbridges]] cross the [[Charles River]]. Eight commuter rail lines and three Amtrak services terminate at [[South Station]] about {{convert|1|mile}} to the south, with no direct rail link between the two stations. The proposed [[North–South Rail Link]] would link the two halves of the commuter rail system, with new underground platforms at both stations. |
The concourse of the station, named for longtime [[Boston Celtics]] coach and executive [[Red Auerbach]], is located under the [[TD Garden]] arena, with two entrances from Causeway Street, as well as entrances from Nashua Street to the west. Five [[island platform]]s serving ten tracks run north from the concourse. Just north of the platforms, a [[Charles River Bridge (Commuter Rail)|pair of two-track drawbridges]] cross the [[Charles River]]. Eight commuter rail lines and three Amtrak services terminate at [[South Station]] about {{convert|1|mile}} to the south, with no direct rail link between the two stations. The proposed [[North–South Rail Link]] would link the two halves of the commuter rail system, with new underground platforms at both stations. |
||
North Station is [[accessible]] on all modes. [[MBTA bus]] route {{MBTABus|4}} runs on Causeway Street, with stops near Canal Street. The [[EZRide]] Shuttle loops on Red Auerbach Way with a stop near the secondary entrance to North Station.<ref name=mbtamap>{{cite web |url=http://www.mbta.com/uploadedfiles/services/subway/N.%20Station%20Neighborhood%20Map.pdf |title=North Station Neighborhood Map |publisher=Massachusetts Bay Transportation Authority |date=April 2012 |access-date=November 25, 2015}}</ref> |
North Station is [[accessible]] on all modes. [[MBTA bus]] route {{MBTABus|4}} runs on Causeway Street, with stops near Canal Street. The [[EZRide]] Shuttle loops on Red Auerbach Way with a stop near the secondary entrance to North Station.<ref name=mbtamap>{{cite web |url=http://www.mbta.com/uploadedfiles/services/subway/N.%20Station%20Neighborhood%20Map.pdf |title=North Station Neighborhood Map |publisher=Massachusetts Bay Transportation Authority |date=April 2012 |access-date=November 25, 2015 |archive-date=December 20, 2016 |archive-url=https://web.archive.org/web/20161220105039/http://www.mbta.com/uploadedfiles/services/subway/N.%20Station%20Neighborhood%20Map.pdf |url-status=dead }}</ref> |
||
Lovejoy Wharf, located off Beverly Street northeast of North Station, is the [[head of navigation]] of the [[Charles River]] due to the adjacent [[Charles River Dam]].<ref name=mbtamap /> It is served by [[water taxi]] services to [[Logan Airport]] and the Boston waterfront by two private companies, and a Lovejoy Wharf – Fan Pier ferry route.<ref>{{cite web |url=https://www.massport.com/logan-airport/to-and-from-logan/water-transport/ |title=Water Transport: Water Shuttles and Water Taxis |publisher=Massachusetts Port Authority |access-date=December 8, 2015 |archive-date=July 2, 2017 |archive-url=https://web.archive.org/web/20170702120052/http://massport.com/logan-airport/to-and-from-logan/water-transport/ |url-status=dead }}</ref> |
Lovejoy Wharf, located off Beverly Street northeast of North Station, is the [[head of navigation]] of the [[Charles River]] due to the adjacent [[Charles River Dam]].<ref name=mbtamap /> It is served by [[water taxi]] services to [[Logan Airport]] and the Boston waterfront by two private companies, and a Lovejoy Wharf – Fan Pier ferry route.<ref>{{cite web |url=https://www.massport.com/logan-airport/to-and-from-logan/water-transport/ |title=Water Transport: Water Shuttles and Water Taxis |publisher=Massachusetts Port Authority |access-date=December 8, 2015 |archive-date=July 2, 2017 |archive-url=https://web.archive.org/web/20170702120052/http://massport.com/logan-airport/to-and-from-logan/water-transport/ |url-status=dead }}</ref> |
||
{{clear left}} |
{{clear left}} |
||
==History== |
== History == |
||
===Previous stations=== |
=== Previous stations === |
||
[[File:Boston and Maine Railroad station in Haymarket Square, circa 1894.jpg|thumb|left|The B&M terminal around 1894]] |
[[File:Boston and Maine Railroad station in Haymarket Square, circa 1894.jpg|thumb|left|The B&M terminal around 1894]] |
||
The four major northside railroads originally built separate terminal stations in Boston. The [[Boston and Lowell Railroad]] (B&L) was the first to open, with service beginning on June 24, 1835.<ref name=terminals>{{cite book |title=Boston's Depots and Terminals |first=Richard C. |last=Barrett |publisher=Railroad Research Publications |isbn= |
The four major northside railroads originally built separate terminal stations in Boston. The [[Boston and Lowell Railroad]] (B&L) was the first to open, with service beginning on June 24, 1835.<ref name=terminals>{{cite book |title=Boston's Depots and Terminals |first=Richard C. |last=Barrett |publisher=Railroad Research Publications |isbn=1-884650-03-1 |year=1996}}</ref>{{rp|26}} The first station was built later in 1835 along Lowell Street (now Lomasney Way) and was several blocks north of Causeway Street. A new station was built at Causeway Street east of Nashua Street in 1857, with the original depot converted to a freight house.<ref name=terminals />{{rp|33}} An even larger third station on the Causeway Street site, constructed of brick with towers at the front corners, was opened on November 24, 1873.<ref name=terminals />{{rp|33}} |
||
The [[Boston and Maine Railroad]] (B&M) opened in July 1845, with a temporary station at Canal and Traverse streets. The permanent station, opened on October 20, was between Canal and Haverhill streets and fronted on [[Haymarket Square (Boston)|Haymarket Square]]. Trains had to cross busy Causeway Street to reach the station; at first, a city ordinance |
The [[Boston and Maine Railroad]] (B&M) opened in July 1845, with a temporary station at Canal and Traverse streets. The permanent station, opened on October 20, was between Canal and Haverhill streets and fronted on [[Haymarket Square (Boston)|Haymarket Square]]. Trains had to cross busy Causeway Street to reach the station; at first, a city ordinance required the railroad to pull cars across the street with oxen rather than locomotives. In 1867, the station was extended northwards from Market Street to Traverse Street.<ref name=terminals />{{rp|38}} |
||
The 1843-opened [[Fitchburg Railroad]] originally terminated in [[Charlestown, Boston|Charlestown]], near the north end of the [[Warren Bridge]]. On August 9, 1848, the railroad opened a new station with large Norman style towers at Causeway Street, just east of the B&M tracks.<ref name=terminals />{{rp|5}} The second floor was the largest auditorium in New England at the time; it was the site of two performances by [[Jenny Lind]] in October 1850 during her [[Jenny Lind tour of America, 1850–52|tour of the United States]].<ref name=terminals />{{rp|9}} |
The 1843-opened [[Fitchburg Railroad]] originally terminated in [[Charlestown, Boston|Charlestown]], near the north end of the [[Warren Bridge]]. On August 9, 1848, the railroad opened a new station with large Norman style towers at Causeway Street, just east of the B&M tracks.<ref name=terminals />{{rp|5}} The second floor was the largest auditorium in New England at the time; it was the site of two performances by [[Jenny Lind]] in October 1850 during her [[Jenny Lind tour of America, 1850–52|tour of the United States]].<ref name=terminals />{{rp|9}} |
||
Line 65: | Line 81: | ||
The [[Eastern Railroad]] opened in 1838 with an East Boston terminal; ferries carried passengers between there and [[Lewis Wharf]] in Boston.<ref name=terminals />{{rp|17}} On April 10, 1854, the railroad opened its Boston terminal on Causeway Street opposite Friend Street – west of the B&M tracks and east of the soon-to-be-built B&L station.<ref name=terminals />{{rp|18}} This "temporary" station was destroyed by fire on June 21, 1862.<ref name=terminals />{{rp|22}} The brick replacement station, completed the next year, "had a reputation of being dirty, unattractive, and uninviting."<ref name=terminals />{{rp|23}} |
The [[Eastern Railroad]] opened in 1838 with an East Boston terminal; ferries carried passengers between there and [[Lewis Wharf]] in Boston.<ref name=terminals />{{rp|17}} On April 10, 1854, the railroad opened its Boston terminal on Causeway Street opposite Friend Street – west of the B&M tracks and east of the soon-to-be-built B&L station.<ref name=terminals />{{rp|18}} This "temporary" station was destroyed by fire on June 21, 1862.<ref name=terminals />{{rp|22}} The brick replacement station, completed the next year, "had a reputation of being dirty, unattractive, and uninviting."<ref name=terminals />{{rp|23}} |
||
===North Union Station=== |
=== North Union Station === |
||
[[File:North Union Station, 1897.png|thumb| |
[[File:North Union Station, 1897.png|thumb|left|North Union Station around 1897]] |
||
The B&M leased the Eastern in 1884, though it continued to use its own terminal.<ref name=terminals />{{rp|23}} As a condition of the B&M's 1887 lease of the B&L, the state required the B&M to construct a [[union station]] for use by the combined B&M system plus the Fitchburg.<ref name=terminals />{{rp|43}} After years of resistance by the B&M, construction on North Union Station began in 1893.<ref name=terminals />{{rp|47}} The station was built as an eastward expansion of the B&L station, with a total frontage of {{convert|568|feet}} on Causeway Street. The center of the new facade was an {{convert|80|ft|adj=on}}-high granite [[triumphal arch]] flanked by four massive columns.<ref name=terminals />{{rp|50}} The east side was formed by a five-story baggage and express building.<ref name=terminals />{{rp|53}} The station was designed by the firm of [[Shepley, Rutan and Coolidge]], which designed [[South Station]] several years later.<ref name=meeks>{{cite book |title=The Railroad Station: An Architectural History |url=https://archive.org/details/railroadstation00meek |url-access=registration |last=Meeks |first=Carroll Louis Vanderslice |year=1956 |publisher=Yale University Press |isbn= |
The B&M leased the Eastern in 1884, though it continued to use its own terminal.<ref name=terminals />{{rp|23}} As a condition of the B&M's 1887 lease of the B&L, the state required the B&M to construct a [[union station]] for use by the combined B&M system plus the Fitchburg.<ref name=terminals />{{rp|43}} After years of resistance by the B&M, construction on North Union Station began in 1893.<ref name=terminals />{{rp|47}} The station was built as an eastward expansion of the B&L station, with a total frontage of {{convert|568|feet}} on Causeway Street. The center of the new facade was an {{convert|80|ft|adj=on}}-high granite [[triumphal arch]] flanked by four massive columns.<ref name=terminals />{{rp|50}} The east side was formed by a five-story baggage and express building.<ref name=terminals />{{rp|53}} The station was designed by the firm of [[Shepley, Rutan and Coolidge]], which designed [[South Station]] several years later.<ref name=meeks>{{cite book |title=The Railroad Station: An Architectural History |url=https://archive.org/details/railroadstation00meek |url-access=registration |last=Meeks |first=Carroll Louis Vanderslice |year=1956 |publisher=Yale University Press |isbn=0-300-00764-7}}</ref>{{rp|129}} |
||
The new station was opened in stages from August 1893 to June 1894.<ref name=terminals />{{rp|50}} The Eastern depot had been demolished in 1893 to allow construction to proceed.<ref name=terminals />{{rp|23}} The B&M depot was demolished in 1897, with the site used for the [[Canal Street incline]] of the [[Tremont Street subway]].<ref name=terminals />{{rp|42}} The Fitchburg was leased by the B&M in 1900, after which the former Fitchburg depot was used as the B&M offices.<ref name=terminals />{{rp|10}} By that time, the station was popularly known as "North Station".<ref name=formative>{{cite journal |title=Boston's Main Line El: The Formative Years 1879–1908 |first=George Jr. |last=Chasson |journal=Headlights |publisher=Electric Railroader's Association |volume=49 |year=1987 |editor=Lonto, Arthur J. |page=11}}</ref> The former Fitchburg depot burned on January 17, 1925; it was demolished in 1926–28.<ref name=terminals />{{rp|12}} |
The new station was opened in stages from August 1893 to June 1894.<ref name=terminals />{{rp|50}} The Eastern depot had been demolished in 1893 to allow construction to proceed.<ref name=terminals />{{rp|23}} The B&M depot was demolished in 1897, with the site used for the [[Canal Street incline]] of the [[Tremont Street subway]].<ref name=terminals />{{rp|42}} The Fitchburg was leased by the B&M in 1900, after which the former Fitchburg depot was used as the B&M offices.<ref name=terminals />{{rp|10}} By that time, the station was popularly known as "North Station".<ref name=formative>{{cite journal |title=Boston's Main Line El: The Formative Years 1879–1908 |first=George Jr. |last=Chasson |journal=Headlights |publisher=Electric Railroader's Association |volume=49 |year=1987 |editor=Lonto, Arthur J. |page=11}}</ref> The former Fitchburg depot burned on January 17, 1925; it was demolished in 1926–28.<ref name=terminals />{{rp|12}} |
||
{{clear left}} |
|||
===North Station=== |
=== North Station === |
||
[[File:New North Station, Boston, Mass.jpg|thumb|left|North Station circa |
[[File:New North Station, Boston, Mass.jpg|thumb|left|North Station {{circa|1928}}]] |
||
In 1926, the B&M began work on an expansion and modernization of the freight yards north of North Station in Somerville.<ref>{{cite news |url=https://www.newspapers.com/clip/36819946/the-boston-globe/ |title=Hopes to Complete New Terminal in Two Years |newspaper=Boston Globe |date=October 28, 1926 |page=36 |via=Newspapers.com}} {{open access}}</ref> The next November, the railroad announced plans for a new North Station complex.<ref>{{cite news |url=https://www.newspapers.com/clip/50261631/the-boston-globe/ |title=B. & M. R. R. Announces Vast Building Plans |newspaper=Boston Globe |date=November 15, 1927 |pages=1, [https://www.newspapers.com/clip/50261724/the-boston-globe/ 15] |via=Newspapers.com}} {{open access}}</ref> Demolition of the old station began the next month.<ref name=terminals />{{rp|65}} The partially-complete station was opened on August 19, 1928; it was formally opened on November 14, 1928 – one year after the original announcement.<ref name=terminals />{{rp|74}} |
In 1926, the B&M began work on an expansion and modernization of the freight yards north of North Station in Somerville.<ref>{{cite news |url=https://www.newspapers.com/clip/36819946/the-boston-globe/ |title=Hopes to Complete New Terminal in Two Years |newspaper=Boston Globe |date=October 28, 1926 |page=36 |via=Newspapers.com}} {{open access}}</ref> The next November, the railroad announced plans for a new North Station complex.<ref>{{cite news |url=https://www.newspapers.com/clip/50261631/the-boston-globe/ |title=B. & M. R. R. Announces Vast Building Plans |newspaper=Boston Globe |date=November 15, 1927 |pages=1, [https://www.newspapers.com/clip/50261724/the-boston-globe/ 15] |via=Newspapers.com}} {{open access}}</ref> Demolition of the old station began the next month.<ref name=terminals />{{rp|65}} The partially-complete station was opened on August 19, 1928; it was formally opened on November 14, 1928 – one year after the original announcement.<ref name=terminals />{{rp|74}} |
||
The new station had 22 tracks paired around island platforms, largely similar to its previous configuration.<ref name=terminals />{{rp|72}} The concourse was topped with the [[Boston Garden]] arena, with a 14-story office building to the east and a hotel to the west. (Early plans had called for these to be integrated into the station like the arena.<ref name=meeks />{{rp|156}}) The complex fronted on Causeway Street for {{convert|700|feet}} from Nashua Street to Beverly Street.<ref>{{cite book |url=https://www.wardmaps.com/viewasset.php?aid=4814 |title=Atlas of the City of Boston |page=Plate 6 |no-pp=yes |year=1938 |publisher=G.W. Bromley & Co. |via=Ward Maps }}{{ |
The new station had 22 tracks paired around island platforms, largely similar to its previous configuration.<ref name=terminals />{{rp|72}} The concourse was topped with the [[Boston Garden]] arena, with a 14-story office building to the east and a hotel to the west. (Early plans had called for these to be integrated into the station like the arena.<ref name=meeks />{{rp|156}}) The complex fronted on Causeway Street for {{convert|700|feet}} from Nashua Street to Beverly Street.<ref>{{cite book |url=https://www.wardmaps.com/viewasset.php?aid=4814 |title=Atlas of the City of Boston |page=Plate 6 |no-pp=yes |year=1938 |publisher=G.W. Bromley & Co. |via=Ward Maps }}{{dead link|date=March 2022 |bot=InternetArchiveBot |fix-attempted=yes }}</ref> A project lasting from August 26, 1930 to mid-1931 rebuilt the approach to the station, with four new drawbridges crossing a relocated Charles River channel.<ref name=terminals />{{rp|76}} |
||
<!--[[File:North Station and West End redevelopment aerial view.jpg|thumb|left|North Station in the early 1960s]]--> |
<!--[[File:North Station and West End redevelopment aerial view.jpg|thumb|left|North Station in the early 1960s]]--> |
||
Until the 1960s, the station was the hub for [[Boston and Maine Railroad#Boston trains|long-distance B&M service]] to multiple locales north and west of [[Boston]], usually in conjunction with other railroads.<ref>Boston & Maine September 1937 timetable</ref><ref>Boston & Maine April 1946 timetable</ref><ref>'Official Guide of the Railways,' June 1961, Boston & Maine section</ref> Service cutbacks began in the 1950s, and service soon dwindled down to [[commuter rail]] operations. The last [[intercity rail|intercity]] service to [[Portland, Maine]] and to north of [[Concord, New Hampshire]] ended on January 4, 1965.<ref name=netransit /> By this point, the intercity train itineraries consisted of self-propelled [[Budd Rail Diesel Car]]s, often just one or two cars for the trip. Single commuter-oriented daily round trips on these routes to Concord and [[Dover, New Hampshire]] lasted until June 30, 1967.<ref name="netransit">{{NETransit}}</ref> (Limited [[MBTA Commuter Rail]] service to Concord was run from January 28, 1980 to March 1, 1981 as part of a federally funded experiment.<ref name=netransit />) In the 1960s, the B&M removed two drawbridges and cut the station to ten tracks. The south end of the platforms were removed to make room for a parking lot.<ref name=terminals />{{rp|79}} |
Until the 1960s, the station was the hub for [[Boston and Maine Railroad#Boston trains|long-distance B&M service]] to multiple locales north and west of [[Boston]], usually in conjunction with other railroads.<ref>Boston & Maine September 1937 timetable</ref><ref>Boston & Maine April 1946 timetable</ref><ref>'Official Guide of the Railways,' June 1961, Boston & Maine section</ref> Service cutbacks began in the 1950s, and service soon dwindled down to [[commuter rail]] operations. The last [[intercity rail|intercity]] service to [[Portland, Maine]] and to north of [[Concord, New Hampshire]] ended on January 4, 1965.<ref name=netransit /> By this point, the intercity train itineraries consisted of self-propelled [[Budd Rail Diesel Car]]s, often just one or two cars for the trip. Single commuter-oriented daily round trips on these routes to Concord and [[Dover, New Hampshire]] lasted until June 30, 1967.<ref name="netransit">{{NETransit}}</ref> (Limited [[MBTA Commuter Rail]] service to Concord was run from January 28, 1980 to March 1, 1981 as part of a federally funded experiment.<ref name=netransit />) In the 1960s, the B&M removed two drawbridges and cut the station to ten tracks. The south end of the platforms were removed to make room for a parking lot.<ref name=terminals />{{rp|79}} |
||
{{clear left}} |
{{clear left}} |
||
'''Prior interstate train service from North Station''': |
'''Prior interstate train service from North Station''': |
||
Line 84: | Line 101: | ||
!Name!!Final B & M station at peak level!!Partner railroad in continuing joint train service!!Final destination!!Year discontinued |
!Name!!Final B & M station at peak level!!Partner railroad in continuing joint train service!!Final destination!!Year discontinued |
||
|- |
|- |
||
|'' |
|''[[Minute Man]]''||[[Union Station (Troy, New York)|Troy, New York]] via [[Fitchburg, Massachusetts]] and [[Greenfield, Massachusetts]]||[[New York Central]]||[[Chicago, Illinois]]||1957 |
||
|- |
|- |
||
|''The Cheshire''||[[Bellows Falls, Vermont]] via Fitchburg, Massachusetts and [[Keene, New Hampshire]]|| - || - ||1958 |
|''The Cheshire''||[[Bellows Falls, Vermont]] via Fitchburg, Massachusetts and [[Keene, New Hampshire]]|| - || - ||1958 |
||
Line 92: | Line 109: | ||
|''Mount Royal''||Bellows Falls, Vermont||[[Rutland Railway]]||[[Burlington, Vermont]], [[Montreal, Quebec]] ||1953 |
|''Mount Royal''||Bellows Falls, Vermont||[[Rutland Railway]]||[[Burlington, Vermont]], [[Montreal, Quebec]] ||1953 |
||
|- |
|- |
||
|''[[Ambassador (B&M train)|Ambassador]]''<ref>{{cite web |title=White River Junction, Vt. and Area, |
|''[[Ambassador (B&M train)|Ambassador]]''<ref>{{cite web |title=White River Junction, Vt. and Area, 1964–65 and 2000 |url=http://www.trainweb.org/theattic/UpperNE.html |publisher=Trainweb.org |date=September 2002}}</ref>||[[White River Junction (Amtrak station)|White River Junction, Vermont]] via [[Lowell, Massachusetts]] and [[Concord, New Hampshire]]||[[Central Vermont Railway]]||[[Essex Junction, Vermont]], Montreal, Quebec||1956 |
||
|- |
|- |
||
|''[[Alouette (train)|Alouette]]''<ref name=runthrough>{{cite web |first=James |last=VanBokkelen |title=Run-Through Passenger Trains in New England |url=http://www.faracresfarm.com/jbvb/rr/run_thru.html |publisher=Far Acres Farm |access-date=April 2, 2017}}</ref>||[[Wells River, Vermont]] via Lowell, Massachusetts and Concord, New Hampshire||[[Canadian Pacific Railway]]||Montreal, Quebec||1956 (unnamed train from |
|''[[Alouette (train)|Alouette]]''<ref name=runthrough>{{cite web |first=James |last=VanBokkelen |title=Run-Through Passenger Trains in New England |url=http://www.faracresfarm.com/jbvb/rr/run_thru.html |publisher=Far Acres Farm |access-date=April 2, 2017}}</ref>||[[Wells River, Vermont]] via Lowell, Massachusetts and Concord, New Hampshire||[[Canadian Pacific Railway]]||Montreal, Quebec||1956 (unnamed train from 1956–1965) |
||
|- |
|- |
||
|''[[Connecticut Yankee (train)|Connecticut Yankee]]''||Travelling as the ''Red Wing'' via [[Concord, New Hampshire]] and [[Plymouth, New Hampshire]], then connecting with main route from New York City at [[White River Junction, Vermont]]||[[Central Vermont Railway]]<br />[[Quebec Central Railway]]||[[Quebec City, Quebec]] via [[Sherbrooke, Quebec]]|| |
|''[[Connecticut Yankee (train)|Connecticut Yankee]]''||Travelling as the ''Red Wing'' via [[Concord, New Hampshire]] and [[Plymouth, New Hampshire]], then connecting with main route from New York City at [[White River Junction, Vermont]]||[[Central Vermont Railway]]<br />[[Quebec Central Railway]]||[[Quebec City, Quebec]] via [[Sherbrooke, Quebec]]||{{circa|1952}} |
||
|- |
|- |
||
|''[[Flying Yankee]]''||[[Portland, Maine]] via [[Dover, New Hampshire]]||[[Maine Central Railroad]]||[[Bangor, Maine]]||1957 |
|''[[Flying Yankee]]''||[[Portland, Maine]] via [[Dover, New Hampshire]]||[[Maine Central Railroad]]||[[Bangor, Maine]]||1957 |
||
|- |
|- |
||
|''[[The Gull]]''<ref name=runthrough />||Portland, Maine||[[Maine Central Railroad]]<br>[[Canadian Pacific Railway]]<br>[[Canadian National Railway]]||[[Halifax, Nova Scotia]] via [[Saint John, New Brunswick]]||1960 |
|''[[The Gull]]''<ref name=runthrough />||Portland, Maine||[[Maine Central Railroad]]<br />[[Canadian Pacific Railway]]<br />[[Canadian National Railway]]||[[Halifax, Nova Scotia]] via [[Saint John, New Brunswick]]||1960 |
||
|- |
|- |
||
|''Kennebec Limited''||Portland, Maine||Maine Central Railroad||Vanceboro, Maine||1958 |
|''Kennebec Limited''||Portland, Maine||Maine Central Railroad||Vanceboro, Maine||1958 |
||
Line 113: | Line 130: | ||
|} |
|} |
||
===MBTA era=== |
=== MBTA era === |
||
====New station==== |
==== New station ==== |
||
[[File:MBTA trains at North Station (1), June 10, 1988.jpg|thumb|left|Trains at North Station in 1988, viewed from the north end of the island platforms]] |
[[File:MBTA trains at North Station (1), June 10, 1988.jpg|thumb|left|Trains at North Station in 1988, viewed from the north end of the island platforms]] |
||
On January 20, 1984, a fire destroyed the wooden trestles leading to the North Station drawbridges. Temporary terminals were soon established: [[Haverhill Line|Haverhill/Reading]] trains terminated at {{bts|Oak Grove}}, [[Newburyport/Rockport Line|Rockport/Ipswich]] trains at a temporary platform at {{bts|Sullivan}}, and [[Lowell Line|Lowell]] and [[Fitchburg Line|Gardner]] trains at a temporary station near {{bts|Lechmere}}.<ref name=netransit /> On June 28, 1984, the MBTA awarded a $11.3 million contract for construction of replacement trestles plus new tracks and platforms.<ref name=chronicle>{{cite book |url=http://web.mit.edu/cron/project/uncertainty/Dowd_Data/Baum_Snow/boston-history.txt |title=A Chronicle of the Boston Transit System |year=1992 |publisher=Massachusetts Bay Transportation Authority |via=Massachusetts Institute of Technology |last=Sanborn |first=George M. |access-date=2019-10-29 |archive-date=2015-08-18 |archive-url=https://web.archive.org/web/20150818013323/http://web.mit.edu/cron/project/uncertainty/Dowd_Data/Baum_Snow/boston-history.txt |url-status=dead }}</ref> The rebuilt station opened on April 20, 1985.<ref name=netransit /> On March 29, 1989, the MBTA awarded a $13.7 million construction contract to raise the five commuter rail platforms for [[accessibility]].<ref name=chronicle /> (Until then, a modified [[forklift]] was used as a mobile lift.)<ref name=pressured /> Groundbreaking was held for the underground garage on June 25, 1990, followed by the platform project on July 12.<ref name=chronicle /> However, the nearest accessible subway transfer was [[State station]] over half a mile away; not until 2001 were the North Station and Haymarket subway stations made accessible.<ref name=pressured>{{cite news |url=https://www.newspapers.com/clip/44834961/the_boston_globe/ |title=T pressured to open all routes to |
On January 20, 1984, a fire destroyed the wooden trestles leading to the North Station drawbridges. Temporary terminals were soon established: [[Haverhill Line|Haverhill/Reading]] trains terminated at {{bts|Oak Grove}}, [[Newburyport/Rockport Line|Rockport/Ipswich]] trains at a temporary platform at {{bts|Sullivan}}, and [[Lowell Line|Lowell]] and [[Fitchburg Line|Gardner]] trains at a temporary station near {{bts|Lechmere}}.<ref name=netransit /> On June 28, 1984, the MBTA awarded a $11.3 million contract for construction of replacement trestles plus new tracks and platforms.<ref name=chronicle>{{cite book |url=http://web.mit.edu/cron/project/uncertainty/Dowd_Data/Baum_Snow/boston-history.txt |title=A Chronicle of the Boston Transit System |year=1992 |publisher=Massachusetts Bay Transportation Authority |via=Massachusetts Institute of Technology |last=Sanborn |first=George M. |access-date=2019-10-29 |archive-date=2015-08-18 |archive-url=https://web.archive.org/web/20150818013323/http://web.mit.edu/cron/project/uncertainty/Dowd_Data/Baum_Snow/boston-history.txt |url-status=dead }}</ref> The rebuilt station opened on April 20, 1985.<ref name=netransit /> On March 29, 1989, the MBTA awarded a $13.7 million construction contract to raise the five commuter rail platforms for [[accessibility]].<ref name=chronicle /> (Until then, a modified [[forklift]] was used as a mobile lift.)<ref name=pressured /> Groundbreaking was held for the underground garage on June 25, 1990, followed by the platform project on July 12.<ref name=chronicle /> However, the nearest accessible subway transfer was [[State station]] over half a mile away; not until 2001 were the North Station and Haymarket subway stations made accessible.<ref name=pressured>{{cite news |url=https://www.newspapers.com/clip/44834961/the_boston_globe/ |title=T pressured to open all routes to accessible |newspaper=Boston Globe |first=Jerry |last=Ackerman |date=March 8, 1989 |pages=1, 16 |via=Newspapers.com}} ([https://www.newspapers.com/clip/44835027/the_boston_globe/ second page], [https://www.newspapers.com/clip/44835490/the_boston_globe/ third page]) {{open access}}</ref> |
||
In February 1993, the state reached a deal with a developer for the replacement of the aging Boston Garden. In exchange for the land and easements to construct the [[TD Garden|FleetCenter]], the developer would construct a new train shed and waiting area on the ground floor of the new arena. The MBTA would also be granted easements for a Green Line tunnel under the arena to replace the Causeway Street Elevated, for a combined underground "superstation" for the Green and Orange lines, and for pedestrian access to North Station.<ref>{{cite book |url=https://archives.lib.state.ma.us/handle/2452/26030 |chapter=Chapter 0015: An Act Furthering The Establishment Of Multipurpose Arena And Transportation Center |date=February 26, 1993 |publisher=Massachusetts General Court |title=Acts and Resolves |pages=23–33}}</ref> The FleetCenter, North Station concourse, and garage opened in 1995.<ref name=great>{{cite web |url=https://www.greatamericanstations.com/stations/boston-north-station-ma-bon/ |title=Boston – North Station, MA (BON) |work=Great American Stations |publisher=Amtrak}}</ref><ref>{{cite report |url=https://www.mass.gov/files/documents/2016/08/st/200205833a2.pdf |title=INDEPENDENT STATE AUDITOR'S REPORT ON CERTAIN ACTIVITIES OF THE MASSACHUSETTS BAY TRANSPORTATION AUTHORITY: JULY 1, 1995 TO JUNE 30, 2002 |date=March 28, 2003 |publisher=Auditor of the Commonwealth}}</ref> |
In February 1993, the state reached a deal with a developer for the replacement of the aging Boston Garden. In exchange for the land and easements to construct the [[TD Garden|FleetCenter]], the developer would construct a new train shed and waiting area on the ground floor of the new arena. The MBTA would also be granted easements for a Green Line tunnel under the arena to replace the Causeway Street Elevated, for a combined underground "superstation" for the Green and Orange lines, and for pedestrian access to North Station.<ref>{{cite book |url=https://archives.lib.state.ma.us/handle/2452/26030 |chapter=Chapter 0015: An Act Furthering The Establishment Of Multipurpose Arena And Transportation Center |date=February 26, 1993 |publisher=Massachusetts General Court |title=Acts and Resolves |pages=23–33}}</ref> The FleetCenter, North Station concourse, and garage opened in 1995.<ref name=great>{{cite web |url=https://www.greatamericanstations.com/stations/boston-north-station-ma-bon/ |title=Boston – North Station, MA (BON) |work=Great American Stations |publisher=Amtrak}}</ref><ref>{{cite report |url=https://www.mass.gov/files/documents/2016/08/st/200205833a2.pdf |title=INDEPENDENT STATE AUDITOR'S REPORT ON CERTAIN ACTIVITIES OF THE MASSACHUSETTS BAY TRANSPORTATION AUTHORITY: JULY 1, 1995 TO JUNE 30, 2002 |date=March 28, 2003 |publisher=Auditor of the Commonwealth}}</ref> |
||
Line 126: | Line 143: | ||
In April 2006, the MBTA announced plans for an enlargement of the waiting area at North Station.<ref>{{cite press release |url=https://www.mbta.com/news/2006-04-26/north-station-concourse-more-double-size |title=North Station Concourse To More Than Double In Size |publisher=Massachusetts Bay Transportation Authority |date=April 26, 2006}}</ref> The project covered over the southern {{convert|80|feet}} of the platforms, adding {{convert|20000|sqft}} of waiting and retail space. The $5 million project was completed in February 2007.<ref>{{cite web |archive-url=https://web.archive.org/web/20070216070208/http://mbta.com/about_the_mbta/t_projects/?id=10194 |archive-date=February 16, 2007 |url=http://mbta.com/about_the_mbta/t_projects/?id=10194 |title=North Station Improvement Project |publisher=Massachusetts Bay Transportation Authority}}</ref><ref>{{cite press release |url=https://www.mbta.com/news/2007-02-06/north-station-concourse-doubles-size |title=North Station Concourse Doubles In Size |date=February 7, 2007 |publisher=Massachusetts Bay Transportation Authority}}</ref> Two large train information displays, with electronic noises to imitate [[Solari board]]s, were added in November 2007.<ref>{{cite press release |url=https://www.mbta.com/news/2007-11-14/new-train-announcement-boards-activated-north-station |title=New Train Announcement Boards Activated at North Station |date=November 14, 2007 |publisher=Massachusetts Bay Transportation Authority}}</ref> |
In April 2006, the MBTA announced plans for an enlargement of the waiting area at North Station.<ref>{{cite press release |url=https://www.mbta.com/news/2006-04-26/north-station-concourse-more-double-size |title=North Station Concourse To More Than Double In Size |publisher=Massachusetts Bay Transportation Authority |date=April 26, 2006}}</ref> The project covered over the southern {{convert|80|feet}} of the platforms, adding {{convert|20000|sqft}} of waiting and retail space. The $5 million project was completed in February 2007.<ref>{{cite web |archive-url=https://web.archive.org/web/20070216070208/http://mbta.com/about_the_mbta/t_projects/?id=10194 |archive-date=February 16, 2007 |url=http://mbta.com/about_the_mbta/t_projects/?id=10194 |title=North Station Improvement Project |publisher=Massachusetts Bay Transportation Authority}}</ref><ref>{{cite press release |url=https://www.mbta.com/news/2007-02-06/north-station-concourse-doubles-size |title=North Station Concourse Doubles In Size |date=February 7, 2007 |publisher=Massachusetts Bay Transportation Authority}}</ref> Two large train information displays, with electronic noises to imitate [[Solari board]]s, were added in November 2007.<ref>{{cite press release |url=https://www.mbta.com/news/2007-11-14/new-train-announcement-boards-activated-north-station |title=New Train Announcement Boards Activated at North Station |date=November 14, 2007 |publisher=Massachusetts Bay Transportation Authority}}</ref> |
||
====Boston Garden Towers changes==== |
==== Boston Garden Towers changes ==== |
||
Beginning in early 2016, [[Boston Properties]] built 'The Hub On Causeway', a [[mixed-use development]] including two towers, on the former Boston Garden site. The development included a new entrance to the rail station from Causeway Street opposite Canal Street, plus an underground passageway from the rail station to the subway station.<ref>{{cite news |url=http://www.bizjournals.com/boston/real_estate/2015/11/boston-properties-clears-major-hurdle-for.html |title=Boston Properties clears major hurdle for ambitious Boston Garden project |newspaper=Boston Business Journal |last=Carlock |first=Caroline |date=November 5, 2015 |access-date=November 25, 2015}}</ref><ref>{{cite web |url=http://www.bostonredevelopmentauthority.org/getattachment/b3db460f-33b9-42e2-a39d-21e886cd2ca4 |title=Expanded Project Notification Form: The Boston Garden |publisher=Boston Redevelopment Authority |author=Epsilon Associates, Inc. |date=September 6, 2013 |access-date=November 25, 2015}}</ref> The passageway opened on January 6, 2019.<ref>{{cite news |url=https://www.bostonglobe.com/metro/2019/01/06/underground-tunnel-connecting-north-station-commuter-rail-station-now-open/jVcvyFZSxtwR29ak3SRJyM/story.html |title=Underground tunnel connecting North Station commuter rail, T stations is now open |newspaper=Boston Globe |date=January 6, 2019 |first=Sean |last=Smyth}}</ref> |
Beginning in early 2016, [[Boston Properties]] built 'The Hub On Causeway', a [[mixed-use development]] including two towers, on the former Boston Garden site. The development included a new entrance to the rail station from Causeway Street opposite Canal Street, plus an underground passageway from the rail station to the subway station.<ref>{{cite news |url=http://www.bizjournals.com/boston/real_estate/2015/11/boston-properties-clears-major-hurdle-for.html |title=Boston Properties clears major hurdle for ambitious Boston Garden project |newspaper=Boston Business Journal |last=Carlock |first=Caroline |date=November 5, 2015 |access-date=November 25, 2015}}</ref><ref>{{cite web |url=http://www.bostonredevelopmentauthority.org/getattachment/b3db460f-33b9-42e2-a39d-21e886cd2ca4 |title=Expanded Project Notification Form: The Boston Garden |publisher=Boston Redevelopment Authority |author=Epsilon Associates, Inc. |date=September 6, 2013 |access-date=November 25, 2015}}</ref> The passageway opened on January 6, 2019.<ref>{{cite news |url=https://www.bostonglobe.com/metro/2019/01/06/underground-tunnel-connecting-north-station-commuter-rail-station-now-open/jVcvyFZSxtwR29ak3SRJyM/story.html |title=Underground tunnel connecting North Station commuter rail, T stations is now open |newspaper=Boston Globe |date=January 6, 2019 |first=Sean |last=Smyth}}</ref> |
||
Installation of [[Automated fare collection|fare gates]] on the North Station concourse began on March 24, 2022 |
Installation of [[Automated fare collection|fare gates]] on the North Station concourse began on March 24, 2022.<ref>{{cite web |url=https://cdn.mbta.com/sites/default/files/2022-02/GM%20Remarks%202.24.22.pdf |page=12 |title=Report from the General Manager |date=February 24, 2022 |publisher=Massachusetts Bay Transportation Authority}}</ref><ref>{{cite tweet |number=1506977756466327562 |title=🚧 Attention riders! Beginning Thursday, March 24, two sections of the North Station concourse will be blocked off for the first phase of fare gate construction. Construction will include removal of flooring & installation of electrical needed to power the gates. |author=MBTA Commuter Rail |user=MBTA_CR}}</ref> The gates were activated on October 1, 2022.<ref>{{cite press release |url=https://www.mbta.com/news/2022-09-23/commuter-rail-begin-operating-fare-gates-north-station-october-1 |title=Commuter Rail to Begin Operating Fare Gates at North Station on October 1 |date=September 23, 2022 |publisher=Massachusetts Bay Transportation Authority}}</ref> |
||
====Drawbridge replacement==== |
==== Drawbridge replacement ==== |
||
The two aging two-track |
The [[Charles River Bridge (Commuter Rail)|two aging two-track drawbridges]] at North Station are planned to be replaced by three new two-track spans, which will be more reliable and have higher capacity. The unfinished sixth platform will be completed to serve long out-of-service tracks 11 and 12, the [[Fitchburg Line|Fitchburg mainline]] will be slightly relocated to provide more layover space near the maintenance facility, and FX interlocking will be reconfigured.<ref name=may2023 /><ref>{{cite web |url=http://www.mbta.com/uploadedfiles/About_the_T/Board_Meetings/NorthSideOverviewCRSchedules.pdf#page=13 |title=Commuter Rail Schedules Initiative: North Side |publisher=Massachusetts Bay Transportation Authority |date=October 6, 2015 |page=13 |access-date=October 14, 2016 |archive-date=February 2, 2017 |archive-url=https://web.archive.org/web/20170202112956/http://www.mbta.com/uploadedfiles/About_the_T/Board_Meetings/NorthSideOverviewCRSchedules.pdf#page=13 |url-status=dead }}</ref> The signals contract associated with the new drawbridges was awarded in May 2019.<ref>{{cite web |title=MBTA Contract No. Q60CN01: North Station Terminal Area Signal System Improvements |url=https://cdn.mbta.com/sites/default/files/fmcb-meeting-docs/2019/05-may/2019-05-20/2019-05-20-fmcb-joint-25-north-station-signal-system-accessible.pdf |access-date=29 December 2019}}</ref> By November 2022, signal work was expected to be completed in August 2023.<ref>{{cite web |url=https://www.mbta.com/projects/north-station-terminal-area-signal-system-improvement-project |title=North Station Terminal Area Signal System Improvement Project |access-date=November 29, 2022 |publisher=Massachusetts Bay Transportation Authority}}</ref> Design of the new [[vertical lift bridge]]s began in 2019 and was 75% complete by May 2023, with design completion expected in 2024.<ref name=may2023>{{cite web |url=https://cdn.mbta.com/sites/default/files/2023-05/2023-05-North-Station-Drawbridge-Replacement-Presentation-Overview-V2.pdf |title=North Station Draw One Bridge Replacement: Project Overview Spring 2023 |date=May 2023 |publisher=Massachusetts Bay Transportation Authority}}</ref> In September 2024, the MBTA was awarded a $472 million federal grant for the bridge replacement.<ref>{{cite press release |url=https://www.mbta.com/news/2024-09-23/massachusetts-wins-472-million-federal-funding-north-station-draw-one-bridge |title=Massachusetts Wins $472 Million in Federal Funding for North Station Draw One Bridge Replacement |date=September 23, 2024 |publisher=Massachusetts Bay Transportation Authority}}</ref> |
||
==References== |
== References == |
||
{{reflist|30em}} |
{{reflist|30em}} |
||
==External links== |
== External links == |
||
{{Commons category}} |
{{Commons category}} |
||
{{Amtrak web|BON|Boston |
{{Amtrak web|BON|Boston, MA–North Station}} |
||
*[https://www.mbta.com/stops/place-north MBTA – North Station] |
*[https://www.mbta.com/stops/place-north MBTA – North Station] |
||
*[https://www.mbta.com/projects/north-station-draw-one-bridge-replacement MBTA – North Station Draw One Bridge Replacement] |
|||
*Google Maps Street View: [https://www.google.com/maps/@42.3654824,-71.0611057,3a,75y,321.31h,94.65t/data=!3m6!1e1!3m4!1sbmI1_9yPFyrUH0Ixc9Yhwg!2e0!7i16384!8i8192 Main entrance], [https://www.google.com/maps/@42.3649992,-71.0619995,3a,75y,325.15h,84.81t/data=!3m6!1e1!3m4!1siGlJdNwpgoV74WVRJ2lpKQ!2e0!7i16384!8i8192 Causeway Street west entrance], [https://www.google.com/maps/@42.3657845,-71.0637852,3a,75y,74.8h,87.76t/data=!3m6!1e1!3m4!1smbJAzlcUbHAJzZGWgKDSsQ!2e0!7i13312!8i6656 Nashua Street entrance] |
|||
*Amtrak – Great American Stations: [http://www.greatamericanstations.com/Stations/BON Boston-North Station, MA (BON)] |
|||
*TrainWeb – USA RailGuide: [http://www.trainweb.org/usarail/boston_north.htm Boston, MA – North (BON)] |
|||
{{Amtrak Massachusetts stations}} |
|||
{{MBTA}} |
{{MBTA}} |
||
{{Boston Bruins}} |
{{Boston Bruins}} |
||
Line 152: | Line 168: | ||
[[Category:MBTA Commuter Rail stations in Boston]] |
[[Category:MBTA Commuter Rail stations in Boston]] |
||
[[Category:Railway stations in Boston]] |
[[Category:Railway stations in Boston]] |
||
[[Category: |
[[Category:Former Boston and Maine Railroad stations]] |
||
[[Category:Union stations in the United States |
[[Category:Union stations in the United States]] |
||
[[Category:West End, Boston]] |
[[Category:West End, Boston]] |
||
[[Category:Railway stations in the United States opened in 1928]] |
[[Category:Railway stations in the United States opened in 1928]] |
||
[[Category:Railway stations in the United States opened in 1995]] |
[[Category:Railway stations in the United States opened in 1995]] |
||
[[Category:Railway stations in the United States opened in 1893]] |
[[Category:Railway stations in the United States opened in 1893]] |
Latest revision as of 05:37, 2 October 2024
North Station | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
Location | 126 Causeway Street Boston, Massachusetts United States | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Coordinates | 42°21′59″N 71°03′44″W / 42.36630°N 71.06222°W | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owned by | Massachusetts Bay Transportation Authority | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line(s) | Western Route Eastern Route New Hampshire Main Line Fitchburg Route | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Platforms | 5 island platforms | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Tracks | 10 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Connections | Green Line Orange Line at North Station MBTA bus: 4 EZRide | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Construction | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
Parking | 1,275 spaces (privately owned garage) 38 accessible spaces | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Bicycle facilities | 20 spaces; Bluebikes dock | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Accessible | Yes | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Other information | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
Station code | Amtrak: BON | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Fare zone | 1A (MBTA Commuter Rail) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | 1893 (North Union Station) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rebuilt | 1928, 1989, 1995, January 2007 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Passengers | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
2012 | 18,427 daily boardings[1] (MBTA Commuter Rail) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
FY 2023 | 399,798 annual boardings and alightings[2] (Amtrak) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
North Station is a commuter rail and intercity rail terminal station in Boston, Massachusetts. It is served by four MBTA Commuter Rail lines – the Fitchburg Line, Haverhill Line, Lowell Line, and Newburyport/Rockport Line – and the Amtrak Downeaster intercity service. The concourse is located under the TD Garden arena, with the platforms extending north towards drawbridges over the Charles River. The eponymous subway station, served by the Green Line and Orange Line, is connected to the concourse with an underground passageway.
Description
[edit]The concourse of the station, named for longtime Boston Celtics coach and executive Red Auerbach, is located under the TD Garden arena, with two entrances from Causeway Street, as well as entrances from Nashua Street to the west. Five island platforms serving ten tracks run north from the concourse. Just north of the platforms, a pair of two-track drawbridges cross the Charles River. Eight commuter rail lines and three Amtrak services terminate at South Station about 1 mile (1.6 km) to the south, with no direct rail link between the two stations. The proposed North–South Rail Link would link the two halves of the commuter rail system, with new underground platforms at both stations.
North Station is accessible on all modes. MBTA bus route 4 runs on Causeway Street, with stops near Canal Street. The EZRide Shuttle loops on Red Auerbach Way with a stop near the secondary entrance to North Station.[3]
Lovejoy Wharf, located off Beverly Street northeast of North Station, is the head of navigation of the Charles River due to the adjacent Charles River Dam.[3] It is served by water taxi services to Logan Airport and the Boston waterfront by two private companies, and a Lovejoy Wharf – Fan Pier ferry route.[4]
History
[edit]Previous stations
[edit]The four major northside railroads originally built separate terminal stations in Boston. The Boston and Lowell Railroad (B&L) was the first to open, with service beginning on June 24, 1835.[5]: 26 The first station was built later in 1835 along Lowell Street (now Lomasney Way) and was several blocks north of Causeway Street. A new station was built at Causeway Street east of Nashua Street in 1857, with the original depot converted to a freight house.[5]: 33 An even larger third station on the Causeway Street site, constructed of brick with towers at the front corners, was opened on November 24, 1873.[5]: 33
The Boston and Maine Railroad (B&M) opened in July 1845, with a temporary station at Canal and Traverse streets. The permanent station, opened on October 20, was between Canal and Haverhill streets and fronted on Haymarket Square. Trains had to cross busy Causeway Street to reach the station; at first, a city ordinance required the railroad to pull cars across the street with oxen rather than locomotives. In 1867, the station was extended northwards from Market Street to Traverse Street.[5]: 38
The 1843-opened Fitchburg Railroad originally terminated in Charlestown, near the north end of the Warren Bridge. On August 9, 1848, the railroad opened a new station with large Norman style towers at Causeway Street, just east of the B&M tracks.[5]: 5 The second floor was the largest auditorium in New England at the time; it was the site of two performances by Jenny Lind in October 1850 during her tour of the United States.[5]: 9
The Eastern Railroad opened in 1838 with an East Boston terminal; ferries carried passengers between there and Lewis Wharf in Boston.[5]: 17 On April 10, 1854, the railroad opened its Boston terminal on Causeway Street opposite Friend Street – west of the B&M tracks and east of the soon-to-be-built B&L station.[5]: 18 This "temporary" station was destroyed by fire on June 21, 1862.[5]: 22 The brick replacement station, completed the next year, "had a reputation of being dirty, unattractive, and uninviting."[5]: 23
North Union Station
[edit]The B&M leased the Eastern in 1884, though it continued to use its own terminal.[5]: 23 As a condition of the B&M's 1887 lease of the B&L, the state required the B&M to construct a union station for use by the combined B&M system plus the Fitchburg.[5]: 43 After years of resistance by the B&M, construction on North Union Station began in 1893.[5]: 47 The station was built as an eastward expansion of the B&L station, with a total frontage of 568 feet (173 m) on Causeway Street. The center of the new facade was an 80-foot (24 m)-high granite triumphal arch flanked by four massive columns.[5]: 50 The east side was formed by a five-story baggage and express building.[5]: 53 The station was designed by the firm of Shepley, Rutan and Coolidge, which designed South Station several years later.[6]: 129
The new station was opened in stages from August 1893 to June 1894.[5]: 50 The Eastern depot had been demolished in 1893 to allow construction to proceed.[5]: 23 The B&M depot was demolished in 1897, with the site used for the Canal Street incline of the Tremont Street subway.[5]: 42 The Fitchburg was leased by the B&M in 1900, after which the former Fitchburg depot was used as the B&M offices.[5]: 10 By that time, the station was popularly known as "North Station".[7] The former Fitchburg depot burned on January 17, 1925; it was demolished in 1926–28.[5]: 12
North Station
[edit]In 1926, the B&M began work on an expansion and modernization of the freight yards north of North Station in Somerville.[8] The next November, the railroad announced plans for a new North Station complex.[9] Demolition of the old station began the next month.[5]: 65 The partially-complete station was opened on August 19, 1928; it was formally opened on November 14, 1928 – one year after the original announcement.[5]: 74
The new station had 22 tracks paired around island platforms, largely similar to its previous configuration.[5]: 72 The concourse was topped with the Boston Garden arena, with a 14-story office building to the east and a hotel to the west. (Early plans had called for these to be integrated into the station like the arena.[6]: 156 ) The complex fronted on Causeway Street for 700 feet (210 m) from Nashua Street to Beverly Street.[10] A project lasting from August 26, 1930 to mid-1931 rebuilt the approach to the station, with four new drawbridges crossing a relocated Charles River channel.[5]: 76
Until the 1960s, the station was the hub for long-distance B&M service to multiple locales north and west of Boston, usually in conjunction with other railroads.[11][12][13] Service cutbacks began in the 1950s, and service soon dwindled down to commuter rail operations. The last intercity service to Portland, Maine and to north of Concord, New Hampshire ended on January 4, 1965.[14] By this point, the intercity train itineraries consisted of self-propelled Budd Rail Diesel Cars, often just one or two cars for the trip. Single commuter-oriented daily round trips on these routes to Concord and Dover, New Hampshire lasted until June 30, 1967.[14] (Limited MBTA Commuter Rail service to Concord was run from January 28, 1980 to March 1, 1981 as part of a federally funded experiment.[14]) In the 1960s, the B&M removed two drawbridges and cut the station to ten tracks. The south end of the platforms were removed to make room for a parking lot.[5]: 79
Prior interstate train service from North Station:
Name | Final B & M station at peak level | Partner railroad in continuing joint train service | Final destination | Year discontinued |
---|---|---|---|---|
Minute Man | Troy, New York via Fitchburg, Massachusetts and Greenfield, Massachusetts | New York Central | Chicago, Illinois | 1957 |
The Cheshire | Bellows Falls, Vermont via Fitchburg, Massachusetts and Keene, New Hampshire | - | - | 1958 |
Green Mountain Flyer | Bellows Falls, Vermont | Rutland Railway | Burlington, Vermont, Montreal, Quebec | 1953 |
Mount Royal | Bellows Falls, Vermont | Rutland Railway | Burlington, Vermont, Montreal, Quebec | 1953 |
Ambassador[15] | White River Junction, Vermont via Lowell, Massachusetts and Concord, New Hampshire | Central Vermont Railway | Essex Junction, Vermont, Montreal, Quebec | 1956 |
Alouette[16] | Wells River, Vermont via Lowell, Massachusetts and Concord, New Hampshire | Canadian Pacific Railway | Montreal, Quebec | 1956 (unnamed train from 1956–1965) |
Connecticut Yankee | Travelling as the Red Wing via Concord, New Hampshire and Plymouth, New Hampshire, then connecting with main route from New York City at White River Junction, Vermont | Central Vermont Railway Quebec Central Railway |
Quebec City, Quebec via Sherbrooke, Quebec | c. 1952 |
Flying Yankee | Portland, Maine via Dover, New Hampshire | Maine Central Railroad | Bangor, Maine | 1957 |
The Gull[16] | Portland, Maine | Maine Central Railroad Canadian Pacific Railway Canadian National Railway |
Halifax, Nova Scotia via Saint John, New Brunswick | 1960 |
Kennebec Limited | Portland, Maine | Maine Central Railroad | Vanceboro, Maine | 1958 |
Mountaineer (summer only) | Littleton, New Hampshire via North Conway, and Crawford Notch in the White Mountains | Maine Central Railroad | Intervale, New Hampshire | 1955 |
Penobscot | Portland, Maine | Maine Central Railroad | Bangor, Maine | 1957 |
Pine Tree Limited | Portland, Maine | Maine Central Railroad | Bangor, Maine | 1958 |
Red Wing | Wells River, Vermont via Lowell, Massachusetts and Concord, New Hampshire | Canadian Pacific Railway | Montreal, Quebec | 1959 |
MBTA era
[edit]New station
[edit]On January 20, 1984, a fire destroyed the wooden trestles leading to the North Station drawbridges. Temporary terminals were soon established: Haverhill/Reading trains terminated at Oak Grove, Rockport/Ipswich trains at a temporary platform at Sullivan, and Lowell and Gardner trains at a temporary station near Lechmere.[14] On June 28, 1984, the MBTA awarded a $11.3 million contract for construction of replacement trestles plus new tracks and platforms.[17] The rebuilt station opened on April 20, 1985.[14] On March 29, 1989, the MBTA awarded a $13.7 million construction contract to raise the five commuter rail platforms for accessibility.[17] (Until then, a modified forklift was used as a mobile lift.)[18] Groundbreaking was held for the underground garage on June 25, 1990, followed by the platform project on July 12.[17] However, the nearest accessible subway transfer was State station over half a mile away; not until 2001 were the North Station and Haymarket subway stations made accessible.[18]
In February 1993, the state reached a deal with a developer for the replacement of the aging Boston Garden. In exchange for the land and easements to construct the FleetCenter, the developer would construct a new train shed and waiting area on the ground floor of the new arena. The MBTA would also be granted easements for a Green Line tunnel under the arena to replace the Causeway Street Elevated, for a combined underground "superstation" for the Green and Orange lines, and for pedestrian access to North Station.[19] The FleetCenter, North Station concourse, and garage opened in 1995.[20][21]
Two MBTA Boat routes – the F3 Lovejoy Wharf – Boston Navy Yard and F5 Lovejoy Wharf – World Trade Center via Moakley Courthouse – began operation in 1997 during Big Dig construction.[22] They were discontinued on January 21, 2005 due to low ridership.[22][23] The F5X Lovejoy Wharf – World Trade Center Express route, which did not rely on MBTA funding, was run until February 24, 2006.[23] A one-year pilot of the privately funded Fan Pier route, intended mostly as a private employee shuttle, began in January 2019.[24]
In 2001, intercity service returned to North Station with Amtrak's Downeaster to Portland, Maine (later extended to Brunswick), using the Lowell and Haverhill lines to the New Hampshire border. It has become one of the more popular routes in New England.[14] Due in part to this, North Station was the 24th busiest Amtrak station in the country in fiscal 2019, and the sixth busiest in New England (behind South Station, Providence, New Haven Union, Back Bay and Route 128).[25]
In April 2006, the MBTA announced plans for an enlargement of the waiting area at North Station.[26] The project covered over the southern 80 feet (24 m) of the platforms, adding 20,000 square feet (1,900 m2) of waiting and retail space. The $5 million project was completed in February 2007.[27][28] Two large train information displays, with electronic noises to imitate Solari boards, were added in November 2007.[29]
Boston Garden Towers changes
[edit]Beginning in early 2016, Boston Properties built 'The Hub On Causeway', a mixed-use development including two towers, on the former Boston Garden site. The development included a new entrance to the rail station from Causeway Street opposite Canal Street, plus an underground passageway from the rail station to the subway station.[30][31] The passageway opened on January 6, 2019.[32]
Installation of fare gates on the North Station concourse began on March 24, 2022.[33][34] The gates were activated on October 1, 2022.[35]
Drawbridge replacement
[edit]The two aging two-track drawbridges at North Station are planned to be replaced by three new two-track spans, which will be more reliable and have higher capacity. The unfinished sixth platform will be completed to serve long out-of-service tracks 11 and 12, the Fitchburg mainline will be slightly relocated to provide more layover space near the maintenance facility, and FX interlocking will be reconfigured.[36][37] The signals contract associated with the new drawbridges was awarded in May 2019.[38] By November 2022, signal work was expected to be completed in August 2023.[39] Design of the new vertical lift bridges began in 2019 and was 75% complete by May 2023, with design completion expected in 2024.[36] In September 2024, the MBTA was awarded a $472 million federal grant for the bridge replacement.[40]
References
[edit]- ^ Central Transportation Planning Staff (2019). "2018 Commuter Rail Counts". Massachusetts Bay Transportation Authority.
- ^ "Amtrak Fact Sheet, Fiscal Year 2023: Commonwealth of Massachusetts" (PDF). Amtrak. March 2024. Retrieved June 27, 2024.
- ^ a b "North Station Neighborhood Map" (PDF). Massachusetts Bay Transportation Authority. April 2012. Archived from the original (PDF) on December 20, 2016. Retrieved November 25, 2015.
- ^ "Water Transport: Water Shuttles and Water Taxis". Massachusetts Port Authority. Archived from the original on July 2, 2017. Retrieved December 8, 2015.
- ^ a b c d e f g h i j k l m n o p q r s t u v w x y Barrett, Richard C. (1996). Boston's Depots and Terminals. Railroad Research Publications. ISBN 1-884650-03-1.
- ^ a b Meeks, Carroll Louis Vanderslice (1956). The Railroad Station: An Architectural History. Yale University Press. ISBN 0-300-00764-7.
- ^ Chasson, George Jr. (1987). Lonto, Arthur J. (ed.). "Boston's Main Line El: The Formative Years 1879–1908". Headlights. 49. Electric Railroader's Association: 11.
- ^ "Hopes to Complete New Terminal in Two Years". Boston Globe. October 28, 1926. p. 36 – via Newspapers.com.
- ^ "B. & M. R. R. Announces Vast Building Plans". Boston Globe. November 15, 1927. pp. 1, 15 – via Newspapers.com.
- ^ Atlas of the City of Boston. G.W. Bromley & Co. 1938. Plate 6 – via Ward Maps.[permanent dead link]
- ^ Boston & Maine September 1937 timetable
- ^ Boston & Maine April 1946 timetable
- ^ 'Official Guide of the Railways,' June 1961, Boston & Maine section
- ^ a b c d e f Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association.
- ^ "White River Junction, Vt. and Area, 1964–65 and 2000". Trainweb.org. September 2002.
- ^ a b VanBokkelen, James. "Run-Through Passenger Trains in New England". Far Acres Farm. Retrieved April 2, 2017.
- ^ a b c Sanborn, George M. (1992). A Chronicle of the Boston Transit System. Massachusetts Bay Transportation Authority. Archived from the original on 2015-08-18. Retrieved 2019-10-29 – via Massachusetts Institute of Technology.
- ^ a b Ackerman, Jerry (March 8, 1989). "T pressured to open all routes to accessible". Boston Globe. pp. 1, 16 – via Newspapers.com. (second page, third page)
- ^ "Chapter 0015: An Act Furthering The Establishment Of Multipurpose Arena And Transportation Center". Acts and Resolves. Massachusetts General Court. February 26, 1993. pp. 23–33.
- ^ "Boston – North Station, MA (BON)". Great American Stations. Amtrak.
- ^ INDEPENDENT STATE AUDITOR'S REPORT ON CERTAIN ACTIVITIES OF THE MASSACHUSETTS BAY TRANSPORTATION AUTHORITY: JULY 1, 1995 TO JUNE 30, 2002 (PDF) (Report). Auditor of the Commonwealth. March 28, 2003.
- ^ a b "Lovejoy Ferry Service Ends" (PDF). TRANSreport. Boston Region Metropolitan Planning Organization: 3. January 2005. Retrieved November 25, 2015.
- ^ a b Ridership and Service Statistics (PDF) (13 ed.). Massachusetts Bay Transportation Authority. 2010. Archived from the original (PDF) on August 13, 2011.
- ^ Vaccaro, Adam (January 4, 2019). "Boston will get a new ferry soon, but only for some people". Boston Globe.
- ^ "Amtrak Company Profile (FY 2019)" (PDF). Amtrak. March 31, 2019. p. 2. Retrieved February 10, 2021.
- ^ "North Station Concourse To More Than Double In Size" (Press release). Massachusetts Bay Transportation Authority. April 26, 2006.
- ^ "North Station Improvement Project". Massachusetts Bay Transportation Authority. Archived from the original on February 16, 2007.
- ^ "North Station Concourse Doubles In Size" (Press release). Massachusetts Bay Transportation Authority. February 7, 2007.
- ^ "New Train Announcement Boards Activated at North Station" (Press release). Massachusetts Bay Transportation Authority. November 14, 2007.
- ^ Carlock, Caroline (November 5, 2015). "Boston Properties clears major hurdle for ambitious Boston Garden project". Boston Business Journal. Retrieved November 25, 2015.
- ^ Epsilon Associates, Inc. (September 6, 2013). "Expanded Project Notification Form: The Boston Garden". Boston Redevelopment Authority. Retrieved November 25, 2015.
- ^ Smyth, Sean (January 6, 2019). "Underground tunnel connecting North Station commuter rail, T stations is now open". Boston Globe.
- ^ "Report from the General Manager" (PDF). Massachusetts Bay Transportation Authority. February 24, 2022. p. 12.
- ^ MBTA Commuter Rail [@MBTA_CR] (March 24, 2022). "🚧 Attention riders! Beginning Thursday, March 24, two sections of the North Station concourse will be blocked off for the first phase of fare gate construction. Construction will include removal of flooring & installation of electrical needed to power the gates" (Tweet) – via Twitter.
- ^ "Commuter Rail to Begin Operating Fare Gates at North Station on October 1" (Press release). Massachusetts Bay Transportation Authority. September 23, 2022.
- ^ a b "North Station Draw One Bridge Replacement: Project Overview Spring 2023" (PDF). Massachusetts Bay Transportation Authority. May 2023.
- ^ "Commuter Rail Schedules Initiative: North Side" (PDF). Massachusetts Bay Transportation Authority. October 6, 2015. p. 13. Archived from the original (PDF) on February 2, 2017. Retrieved October 14, 2016.
- ^ "MBTA Contract No. Q60CN01: North Station Terminal Area Signal System Improvements" (PDF). Retrieved 29 December 2019.
- ^ "North Station Terminal Area Signal System Improvement Project". Massachusetts Bay Transportation Authority. Retrieved November 29, 2022.
- ^ "Massachusetts Wins $472 Million in Federal Funding for North Station Draw One Bridge Replacement" (Press release). Massachusetts Bay Transportation Authority. September 23, 2024.
External links
[edit]- Amtrak stations in Massachusetts
- MBTA Commuter Rail stations in Boston
- Railway stations in Boston
- Former Boston and Maine Railroad stations
- Union stations in the United States
- West End, Boston
- Railway stations in the United States opened in 1928
- Railway stations in the United States opened in 1995
- Railway stations in the United States opened in 1893