Buuruljuut Power Plant
Appearance
Buuruljuut Power Plant | |
---|---|
Country | Mongolia |
Location | Bayanjargalan, Töv |
Coordinates | 47°16′23.5″N 107°53′26.7″E / 47.273194°N 107.890750°E |
Status | Under construction |
Construction began | 2022 |
Commission date | October 2024 (unit 1) 2025 (unit 2) |
Construction cost | MNT300 billion |
Owners | Tsetsens Mining and Energy |
Power generation | |
Units planned | 4 |
The Buuruljuut Power Plant is a coal-fired power station under construction in Bayanjargalan District, Töv Province, Mongolia.
History
Feasibility study to construct the power plant was carried out in 2016–2020. Construction then started in 2022.[1] The first unit of the power plant will be commissioned in October 2024 with an installed capacity of 150 MW. The second unit is expected to be commissioned in 2025.[2]
Technical specifications
The power plant is a coal-fired plant which will have a full installed capacity of 600 MW from four generation units.[2]
Finance
The power plant is constructed with a cost of MNT300 billion.[2] It is developed and owned by Tsetsens Mining and Energy.[3]
See also
References
- ^ "Buruljuut Coal Mine and Power Plant Integrated Project". Bodi Group. 2024. Retrieved 22 July 2024.
- ^ a b c Б, Өнөболд (17 July 2024). "First Block of Buuruljuut Power Plant to be Operational in October". Mongolian National News Agency. Retrieved 22 July 2024.
- ^ "Power plant profile: Buuruljuut Coal Fired Power Plant, Mongolia". Power Technology. 19 June 2024. Retrieved 22 July 2024.