Jump to content

Tomahawk (YTB-789)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Bonewah (talk | contribs) at 18:12, 2 March 2010 (Created page with '{|{{Infobox Ship Begin}} {{Infobox Ship Image |Ship image= 300px |Ship caption= }} {{Infobox Ship Career |Hide header= |Ship countr...'). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff)
History
NameUSS Tomahawk
BuilderMarinette Marine, Marinette, Wisconsin
Laid downJanuary 1966
Launched5 May 1966
Acquired8 July 1966
Fatedisposed of by Defense Reutilization and Marketing Service (DRMS) by Exchange/Sale for reuse/conversion, 1 October 2004
General characteristics
Class and typeNatick-class tugboat
Displacement283 long tons (288 t)
Length109 ft (33 m)
Beam31 ft (9.4 m)
Draft14 ft (4.3 m)
Speed12 knots (22 km/h; 14 mph)
Complement12
ArmamentNone

The second Tomahawk (YTB-789) was laid down in January 1966 at Marinette, Wis., by the Marinette Marine Corp.; launched on 5 May 1966; and delivered to the Navy on 7 June 1966. Her fitting-out period ended on 8 July 1966, and the large harbor tug reported to the 10th Naval District, San Juan, Puerto Rico, and provided tug and tow services out of Roosevelt Roads until reassigned to the 6th Naval District in the spring of 1971 and stationed at Mayport, FL

References