Line 22 (Shanghai Metro)
Appearance
Line 22 | |
---|---|
Chongming | |
Overview | |
Status | Planned |
Locale | Shanghai, China |
Termini | |
Stations | 8 |
Service | |
Type | Rapid transit |
Rolling stock | 6-car Type A[1] |
Technical | |
Line length | 42.8 km |
Operating speed | 120 km/h[1] |
The Chongming line (Chinese: 崇明线; pinyin: Chóngmíng xiàn) is a line on the Shanghai Metro that is part of the 2018-2023 Shanghai Metro plan.[2] The Chongming line was previously treated as the last phase of Line 9, and was Line 19 until 2016, when it was renamed the Chongming line.
The Chongming line starts at Template:SHM stations in Pudong and ends at Template:SHM stations in Chongming District.[3] The Chongming line will interchange with Lines 9 and 12.[3] The line is 42.8 km in length, including 40.7 km underground section.
Planned stations
Station name according to the April 2019 version.[3]
Station name | Connections | Distance km |
Location | ||
---|---|---|---|---|---|
English | Chinese | ||||
Template:SHM stations | 金吉路 | 9 | |||
Template:SHM stations | 申江路 | 12 | |||
Template:SHM stations | 高宝路 | ||||
Template:SHM stations | 凌空北路 | ||||
Template:SHM stations | 长兴岛 | ||||
Template:SHM stations | 陈家镇 | ||||
Template:SHM stations | 东滩 | ||||
Template:SHM stations | 裕安 | ||||
References
- ^ a b "上海市轨道交通崇明线工程环境影响评价咨询项目招标公告". 2019-05-27. Archived from the original on 2019-05-27. Retrieved 2019-09-15.
{{cite web}}
: Unknown parameter|dead-url=
ignored (|url-status=
suggested) (help) - ^ "国家发展改革委关于上海市城市轨道交通第三期建设规划(2018~2023年)的批复". Archived from the original on 2018-12-19. Retrieved 2018-12-19.
{{cite web}}
: Unknown parameter|dead-url=
ignored (|url-status=
suggested) (help) - ^ a b c "上海市轨道交通崇明线选线专项规划(草案公示)" (PDF). Archived from the original (PDF) on 2019-04-27. Retrieved 2019-04-27.
{{cite web}}
: Unknown parameter|dead-url=
ignored (|url-status=
suggested) (help)