Jump to content

Iron Gate I Hydroelectric Power Station

Coordinates: 44°40′15″N 22°31′45″E / 44.67083°N 22.52917°E / 44.67083; 22.52917
From Wikipedia, the free encyclopedia
(Redirected from Lake Đerdap)
Iron Gate I Hydroelectric Power Station
Iron Gates seen from Kladovo
Iron Gate I Hydroelectric Power Station is located in Serbia
Iron Gate I Hydroelectric Power Station
Location of Iron Gate I Hydroelectric Power Station in Serbia
Iron Gate I Hydroelectric Power Station is located in Romania
Iron Gate I Hydroelectric Power Station
Iron Gate I Hydroelectric Power Station (Romania)
LocationIron Gate
Serbia
Romania
Coordinates44°40′15″N 22°31′45″E / 44.67083°N 22.52917°E / 44.67083; 22.52917
Construction began7 September 1964
Opening date16 May 1972 (1972-05-16)
Dam and spillways
ImpoundsDanube River
Height60 m (200 ft)
Length1,278 m (4,193 ft)[1]
Reservoir
CreatesIron Gate I Reservoir
Total capacity2.1 km3 (0.50 cu mi)
Catchment area577,250 km2 (222,880 sq mi)
Surface area104.41 km2 (40.31 sq mi)
Power Station
TurbinesRomania: 6 × 194.3 MW
Serbia: 6 × 201 MW
Installed capacity2,371.8 MW
Annual generationRomania: 5.24 TWh
Serbia: 5.65 TWh

The Iron Gate I Hydroelectric Power Station (Romanian: Porțile de Fier I, Serbian: Ђердап I/Đerdap I) is the largest dam on the Danube river and one of the largest hydro power plants in Europe. It is located on the Iron Gate gorge, between Romania and Serbia.

The Romanian side of the power station produces approximately 5.24 TWh annually, while the Serbian side of the power station produces 5.65 TWh.[2]

History

[edit]

The project started in 1964 as a joint-venture between the governments of Romania and Yugoslavia for the construction of a major dam on the Danube River which would serve both countries. At the time of completion in 1972, it was the 10th largest hydroelectric power stations in the world with twelve Kaplan turbines generating 2,052 MW, divided equally between the two countries at 1,026 MW each.[2]

The small inhabited island of Ada Kaleh was submerged during the construction.

Modernization

[edit]

As the original turbines' 30 years lifespan came to an end, in 1998 the Romanian half of the dam started a program of modernization. As part of this program, the first of the turbines was stopped in 1999. By 2007 the program was completed and the Romanian half of the dam's operations were back to full capacity. The nominal capacity of each of the six units was increased from 171 MW to 194.3 MW, thus giving an installed capacity of 1,165.8 MW[3] and increasing the entire power generation capacity of the dam to 2,192 MW at the time. On the Serbian part of the dam, modernization started in July 2008;[4] till March 2016 were modernised units 4 to 6.[5] Modernisation was finished in December 2023, the nominal capacity of each of the six units was increased from 174 MW to 201 MW. Units were upgraded with the help of Russian company Power Machines from Saint Petersburg, as well as their subcontractors with the participation of eleven domestic companies.[6]

In addition to the upgrades, the Serbian side is planning on building a new, smaller power station, called Iron Gate III (Serbian: Ђердап III/Đerdap III).[7]

[edit]

See also

[edit]

References

[edit]
  1. ^ "Specifications". Archived from the original on 2016-01-27. Retrieved 2010-08-08.
  2. ^ a b HE Djerdap (in Serbian) Archived 2009-08-13 at the Wayback Machine
  3. ^ "Hidroelectrica". Archived from the original on 2012-11-22. Retrieved 2012-09-01.
  4. ^ "ХЕ Ђердап - Технички инфо - Ревитализација". Archived from the original on 2009-06-27. Retrieved 2009-03-26.
  5. ^ ""Силовые машины» изготовили партию гидрооборудования для сербской ГЭС «Джердап-1"". www.power-m.ru. Archived from the original on 2017-11-07. Retrieved 2017-11-04.
  6. ^ "Реновация ГЭС "Джердап-1", важнейшего российско-сербского проекта, завершена - посол РФ".
  7. ^ "HE Đerdap - Razvoj". Archived from the original on 2009-10-06. Retrieved 2009-03-26.
[edit]