http://rdf.ncbi.nlm.nih.gov/pubchem/patent/CN-205116206-U

Outgoing Links

Predicate Object
assignee http://rdf.ncbi.nlm.nih.gov/pubchem/patentassignee/MD5_51fb8073bf0a1f9bd198ca2971b17ea9
classificationIPCInventive http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/E02D27-42
http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/E02D27-44
http://rdf.ncbi.nlm.nih.gov/pubchem/patentipc/E02D5-58
filingDate 2015-10-30^^<http://www.w3.org/2001/XMLSchema#date>
grantDate 2016-03-30^^<http://www.w3.org/2001/XMLSchema#date>
inventor http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_ea6734decb0216a44f5338d938507004
http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_16c92538737b0c15f6932a5422251734
http://rdf.ncbi.nlm.nih.gov/pubchem/patentinventor/MD5_053145c97a8ad530fce31485c3fc952c
publicationDate 2016-03-30^^<http://www.w3.org/2001/XMLSchema#date>
publicationNumber CN-205116206-U
titleOfInvention Stress tube stake stand in advance
abstract The utility model discloses a stress tube stake stand in advance, including steel lattice column, tubular pile and tubular pile lock pin, the coaxial fixed connection of tubular pile lock pin in steel lattice column lower extreme, the tubular pile lock pin is fixed insert the tubular pile of locating annular column in, steel lattice column lower extreme links to each other with the tubular pile end plate at tubular pile top with tubular pile lock pin upper end fixed connection, tubular pile lock pin upper end, tubular pile lock pin lower extreme fixed mounting has the layer board, layer board and tubular pile lie in an inboard void formation watering space of layer board top part, should water to water in the space has expansion concrete, the utility model discloses will be in advance stress tube stake and steel lattice column combine regard as deep basal pit horizontal support's stand system together, construction speed is fast for this system, the expense of saving has great inertia couple, promotes the stiffness's effect, while full play the steel lattice column be connected, pass through the superiority that base plate watertightness was under construction on foundation ditch upper portion with the support.
isCitedBy http://rdf.ncbi.nlm.nih.gov/pubchem/patent/CN-108239975-A
http://rdf.ncbi.nlm.nih.gov/pubchem/patent/CN-105239594-A
http://rdf.ncbi.nlm.nih.gov/pubchem/patent/CN-105239594-B
priorityDate 2015-10-30^^<http://www.w3.org/2001/XMLSchema#date>
type http://data.epo.org/linked-data/def/patent/Publication

Incoming Links

Predicate Subject
isDiscussedBy http://rdf.ncbi.nlm.nih.gov/pubchem/compound/CID962
http://rdf.ncbi.nlm.nih.gov/pubchem/substance/SID419512635

Showing number of triples: 1 to 20 of 20.