abstract |
According to one aspect of the embodiment, a steam turbine power plant 10 is provided with a steam turbine system 20 which generates electricity by driving a steam turbine by the steam from a boiler 21 or the like which generates the steam by combustion heat, and a carbon dioxide recovery system 50 which recovers carbon dioxide contained in the combustion gas from the boiler 21 or the like. In the steam turbine system 20 , part of the steam having performed the expansion work in a high-pressure turbine 22 is introduced into a back-pressure turbine 27 . The steam introduced into the back-pressure turbine 27 performs the expansion work and partly supplied to the carbon dioxide recovery system 50 through a pipe 42 to heat an absorption liquid 90 in a regeneration tower 70. |