abstract |
There is provided a method for well construction comprising the steps of: a first phase of the well construction, in which a bottom hole assembly, BHA, with a first drill is used for drilling, and a conductor casing is lowered into the well and cemented; a second phase of the well construction, in which a second drill is used for drilling, wherein a production adapter base, PAB, is installed in parallel with lowering a blowout preventer, BOP; and a third phase of the well construction in which a third drill is used for drilling, for the steps of landing and geonavigation inside a reservoir. |