abstract |
A plugging liquid for plugging of a zone of a subterranean formation around a drill hole, consisting of an emulsion comprising (a) a continuous phase containing a hydrophobic liquid, an emulsifier and a crosslinking agent for a polysaccharide, and (b) a discontinuous phase containing water and a polysaccharide. A variant of the plugging composition contains in addition a weighting material in the discontinuous phase. Also described is a method for preparing the plugging liquid and a method for plugging a zone of a subterranean formation penetrated by a drill hole in fluid communication with the zone, according to which method the new plugging liquid is injected into the zone via the drill hole and is subjected to high shear forces in the drill hole, whereby the polysaccharide and the crosslinking agent are brought into contact with one another with resulting initiation of a crosslinking of the polysaccharide and the crosslinking agent and a setting of the plugging liquid. When the drilling liquid contains a weighting material it is primarily used to inhibit or prevent an undesired blow-out in or from a well. |