About: 514 Cherry

An Entity of Type: infrastructure, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

The 514 Cherry was a streetcar route of the Toronto streetcar system in Toronto, Ontario, Canada, that operated from June 19, 2016, until October 7, 2018. The 514 operated through the financial district and downtown Toronto between Dufferin Gate Loop and the Distillery Loop. It used to supplement with the 504 King service along King Street, specifically to the dense residential areas in Liberty Village, the Canary District and the Distillery District. The City of Toronto's "King Street Visioning Study" proposed a transit and pedestrian corridor through which this route would operate.

Property Value
dbo:abstract
  • The 514 Cherry was a streetcar route of the Toronto streetcar system in Toronto, Ontario, Canada, that operated from June 19, 2016, until October 7, 2018. The 514 operated through the financial district and downtown Toronto between Dufferin Gate Loop and the Distillery Loop. It used to supplement with the 504 King service along King Street, specifically to the dense residential areas in Liberty Village, the Canary District and the Distillery District. The City of Toronto's "King Street Visioning Study" proposed a transit and pedestrian corridor through which this route would operate. The 514 Cherry route was replaced by two overlapping branches of the 504 King route, one (504A) serving the Distillery District, and the other (504B) serving Dufferin Gate at Exhibition Place. (en)
dbo:closingDate
  • 2018-10-07 (xsd:date)
dbo:closingYear
  • 2018-01-01 (xsd:gYear)
dbo:isPartOf
dbo:lineLength
  • 7000.000000 (xsd:double)
dbo:location
dbo:numberOfStations
  • 18 (xsd:nonNegativeInteger)
dbo:openingDate
  • 2016-06-19 (xsd:date)
dbo:openingYear
  • 2016-01-01 (xsd:gYear)
dbo:operator
dbo:railwayRollingStock
dbo:routeEnd
dbo:routeStart
dbo:thumbnail
dbo:wikiPageExternalLink
dbo:wikiPageID
  • 49169573 (xsd:integer)
dbo:wikiPageLength
  • 16096 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1086970264 (xsd:integer)
dbo:wikiPageWikiLink
dbp:boxWidth
  • auto (en)
dbp:close
  • 2018-10-07 (xsd:date)
dbp:depot
dbp:electrification
  • 600 (xsd:integer)
dbp:end
dbp:imageWidth
  • 280 (xsd:integer)
dbp:locale
  • Toronto, Ontario (en)
dbp:mapState
  • collapsed (en)
dbp:name
  • 514 (xsd:integer)
dbp:open
  • 2016-06-19 (xsd:date)
dbp:operator
dbp:start
dbp:stations
  • 18 (xsd:integer)
  • (en)
dbp:stock
dbp:system
dbp:type
  • Streetcar route (en)
dbp:wikiPageUsesTemplate
dct:subject
gold:hypernym
rdf:type
rdfs:comment
  • The 514 Cherry was a streetcar route of the Toronto streetcar system in Toronto, Ontario, Canada, that operated from June 19, 2016, until October 7, 2018. The 514 operated through the financial district and downtown Toronto between Dufferin Gate Loop and the Distillery Loop. It used to supplement with the 504 King service along King Street, specifically to the dense residential areas in Liberty Village, the Canary District and the Distillery District. The City of Toronto's "King Street Visioning Study" proposed a transit and pedestrian corridor through which this route would operate. (en)
rdfs:label
  • 514 Cherry (en)
rdfs:seeAlso
owl:sameAs
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
foaf:name
  • (en)
  • 514 Cherry (en)
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License