NTPC, Barauni Or Barauni Thermal Power Station is an existing 720 megawatt coal-fired power station earlier owned by Bihar State Electricity Board (BSEB)and currently by NTPC Limited. The power station is located at Barauni in Begusarai district, Bihar, India. Barauni thermal power station in Bihar came into existence in association with the Russian collaboration and came into operation in the year 1962. Bihar Government was mulling over the idea to hand over Barauni Thermal Power Station to NTPC Limited. On 17 April 2018, Bihar state cabinet, headed by chief minister Nitish Kumar, gave its nod to handing over of Barauni Thermal Power Station to National Thermal Power Corporation. On 15 May 2018, Bihar Government signed a memorandum of understanding (MoU) to hand over the thermal plant to
Property | Value |
---|---|
dbo:abstract |
|
dbo:installedCapacity |
|
dbo:location | |
dbo:openingDate |
|
dbo:openingYear |
|
dbo:owner | |
dbo:status |
|
dbo:thumbnail | |
dbo:wikiPageID |
|
dbo:wikiPageLength |
|
dbo:wikiPageRevisionID |
|
dbo:wikiPageWikiLink |
|
dbp:commissioned |
|
dbp:country |
|
dbp:location | |
dbp:name |
|
dbp:nameOfficial |
|
dbp:operator |
|
dbp:owner |
|
dbp:psElectricalCapacity |
|
dbp:psUnitsOperational |
|
dbp:status |
|
dbp:thFuelPrimary | |
dbp:wikiPageUsesTemplate | |
dcterms:subject | |
georss:point |
|
rdf:type |
|
rdfs:comment |
|
rdfs:label |
|
owl:sameAs | |
geo:geometry |
|
geo:lat |
|
geo:long |
|
prov:wasDerivedFrom | |
foaf:depiction | |
foaf:isPrimaryTopicOf | |
foaf:name |
|
is dbo:wikiPageWikiLink of |
|
is foaf:primaryTopic of |