dbo:abstract
|
- Canadian Pacific's Galt Subdivision is Canadian Pacific's 114.6 mile long section of its Montréal-Detroit freight corridor. It is located in Southern Ontario, Canada. Getting its name from the historic City of Galt (now the City of Cambridge) that it passes through, the track runs from the bustling hub of Toronto, Ontario, to London, Ontario. GO Transit's Milton GO train service operates on this line from Toronto Union Station to Milton GO station. The rest of the line plays host to mixed freight and intermodal traffic, from Toronto to termini like Detroit, and Chicago. This Central Ontario line also had CP passenger rail service till 1971 when it was eliminated. Passenger rail service would be partly restored halfway through the line through the introduction of GO Transit operations in 1981 westward only as far as the Town of Milton. (en)
|
dbo:isPartOf
| |
dbo:location
| |
dbo:owner
| |
dbo:routeEnd
| |
dbo:routeStart
| |
dbo:status
| |
dbo:thumbnail
| |
dbo:type
| |
dbo:wikiPageID
| |
dbo:wikiPageLength
|
- 7514 (xsd:nonNegativeInteger)
|
dbo:wikiPageRevisionID
| |
dbo:wikiPageWikiLink
| |
dbp:end
| |
dbp:locale
|
- Southern Ontario, Canada (en)
|
dbp:logo
|
- Canadian Pacific Railway logo 2014.svg (en)
|
dbp:logoAlt
| |
dbp:name
| |
dbp:owner
| |
dbp:routes
| |
dbp:start
| |
dbp:stations
| |
dbp:status
| |
dbp:system
| |
dbp:type
| |
dbp:wikiPageUsesTemplate
| |
dcterms:subject
| |
rdf:type
| |
rdfs:comment
|
- Canadian Pacific's Galt Subdivision is Canadian Pacific's 114.6 mile long section of its Montréal-Detroit freight corridor. It is located in Southern Ontario, Canada. Getting its name from the historic City of Galt (now the City of Cambridge) that it passes through, the track runs from the bustling hub of Toronto, Ontario, to London, Ontario. GO Transit's Milton GO train service operates on this line from Toronto Union Station to Milton GO station. The rest of the line plays host to mixed freight and intermodal traffic, from Toronto to termini like Detroit, and Chicago. This Central Ontario line also had CP passenger rail service till 1971 when it was eliminated. Passenger rail service would be partly restored halfway through the line through the introduction of GO Transit operations in 19 (en)
|
rdfs:label
| |
owl:sameAs
| |
prov:wasDerivedFrom
| |
foaf:depiction
| |
foaf:isPrimaryTopicOf
| |
foaf:name
| |
is dbo:wikiPageRedirects
of | |
is dbo:wikiPageWikiLink
of | |
is foaf:primaryTopic
of | |