dbo:abstract
|
- HVDC HelWin1 is a high voltage direct current (HVDC) link built to transmit Offshore wind power to the power grid of the German mainland. The project differs from most HVDC systems in that one of the two converter stations is built on a platform in the sea. Voltage-Sourced Converters are used and the total cable length is 130 km. The project was completed and handed over to its owner, TenneT, in February 2015. (en)
|
dbo:thumbnail
| |
dbo:wikiPageExternalLink
| |
dbo:wikiPageID
| |
dbo:wikiPageLength
|
- 6843 (xsd:nonNegativeInteger)
|
dbo:wikiPageRevisionID
| |
dbo:wikiPageWikiLink
| |
dbp:acVoltage
| |
dbp:cableManufacturer
| |
dbp:capacity
| |
dbp:caption
|
- The land converter station for HelWin1 and HelWin2 at Büttel (en)
|
dbp:country
| |
dbp:currentType
| |
dbp:dcVoltage
| |
dbp:expected
| |
dbp:finish
| |
dbp:length
| |
dbp:name
| |
dbp:photo
|
- Stromrichterstation Buttel 25112012 3.JPG (en)
|
dbp:polesNo
| |
dbp:start
|
- HelWin Alpha platform (en)
|
dbp:substationManufacturer
| |
dbp:through
| |
dbp:type
| |
dbp:wikiPageUsesTemplate
| |
dct:subject
| |
gold:hypernym
| |
georss:point
|
- 53.91694444444445 9.231944444444444
|
rdf:type
| |
rdfs:comment
|
- HVDC HelWin1 is a high voltage direct current (HVDC) link built to transmit Offshore wind power to the power grid of the German mainland. The project differs from most HVDC systems in that one of the two converter stations is built on a platform in the sea. Voltage-Sourced Converters are used and the total cable length is 130 km. The project was completed and handed over to its owner, TenneT, in February 2015. (en)
|
rdfs:label
| |
owl:sameAs
| |
geo:geometry
|
- POINT(9.2319440841675 53.916942596436)
|