An Entity of Type: infrastructure, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

Nordsee-Ost offshore wind farm is an offshore wind farm in operation in the eastern part of the North Sea German sector. The project was developed by RWE Innogy, a subsidiary of RWE. The wind farm consists of 48 turbines with a total capacity of 295 MW. The 6.15 MW turbines were provided by REpower. Steel foundations for generators were supplied by Aker Verdal. Power converters were supplied by Woodward Governor Company. A consortium of Siemens and Prysmian built the high-voltage direct current submarine cable from the wind farm to the German transmission system operated by Transpower, a subsidiary of TenneT.

Property Value
dbo:abstract
  • Nordsee Ost ist ein Offshore-Windpark der innogy in der deutschen Ausschließlichen Wirtschaftszone (AWZ) der Nordsee. Die 48 Windenergieanlagen produzieren jährlich etwa 1.000 GWh elektrische Energie. Am 11. Mai 2015 wurde der Windpark feierlich in Betrieb genommen. Die Einweihung wurde von Bundeswirtschafts- und Energieminister Sigmar Gabriel vorgenommen, der im Rahmen eines Treffens der Energieminister der G7-Staaten mit seinen Amtskollegen den Windpark und die dazugehörige Konverterplattform HelWin alpha besuchte. (de)
  • Nordsee-Ost offshore wind farm is an offshore wind farm in operation in the eastern part of the North Sea German sector. The project was developed by RWE Innogy, a subsidiary of RWE. The wind farm consists of 48 turbines with a total capacity of 295 MW. The 6.15 MW turbines were provided by REpower. Steel foundations for generators were supplied by Aker Verdal. Power converters were supplied by Woodward Governor Company. A consortium of Siemens and Prysmian built the high-voltage direct current submarine cable from the wind farm to the German transmission system operated by Transpower, a subsidiary of TenneT. Delays in power line construction by Dutch TenneT delayed its operational start. On 11 May 2015 the wind farm was officially put into operation. (en)
  • Le parc éolien de Nordsee-Ost est un parc éolien en construction situé en mer du Nord, dans la zone économique exclusive de l'Allemagne. * Portail des énergies renouvelables * Portail de la mer du Nord * Portail de l’Allemagne (fr)
  • ВЕС Нордзе-Ост (нім. Offshore-Windpark Nordsee Ost) — німецька офшорна вітрова електростанція, введена в експлуатацію у 2015 році. Місце для розміщення ВЕС обрали в Північному морі за 30 км на північ від острова Гельголанд. Будівництво ВЕС розпочалось у 2012 році зі спорудження фундаментів. Спеціалізоване судно Victoria Mathias опускало на дно гратчаті опорні основи висотою 50 метрів та вагою 550 тон, після чого закріплювало кожну чотирма палями. В один рейс воно брало з берегової бази у Бремергафені по два комплекти фундаментів. Подальший монтаж вітрових агрегатів провадило це ж судно, проте на певному етапі випробували новий метод. Згідно з ним Victoria Mathias після встановлення башти та гондоли переходило на нову точку, а кріплення лопатей здійснювало судно Friedrich Ernestine, яке прибуло після завершення робіт на британській станції Гвінт-і-Мор. Гратчату опорну основу («джекет») вагою 700 тон для офшорної трасформаторної підстанції встановив плавучий кран Rambiz, а згадане вище судно Victoria Mathias закріпило її палями. Той же плавучий кран пізніше змонтував надбудову з обладнанням («топсайд») вагою 1850 тон. Для видачі продукції проклали два кабелі довжиною по 4 км до офшорної платформи HelWin alpha, яка перетворює змінний струм у прямий для подальшої подачі на берег за допомогою технології HVDC (лінії постійного струму високої напруги). 48 вітроагрегатів ВЕС розташовані на площі 10 квадратних миль у районі з глибинами моря до 25 метрів. На баштах висотою 100 метрів змонтували вітрові турбіни Senvion 6M (Repower 6M) з одиничною потужністю 6,15 МВт та діаметром ротора 126 метрів. Проект вартістю 1,1 млрд євро реалізувала енергетична компанія RWE. Очікується, що станція вироблятиме біля 1,1 млрд кВт-год електроенергії на рік. (uk)
dbo:location
dbo:openingDate
  • 2015-05-11 (xsd:date)
dbo:openingYear
  • 2015-01-01 (xsd:gYear)
dbo:owner
dbo:status
  • O
dbo:thumbnail
dbo:wikiPageExternalLink
dbo:wikiPageID
  • 28064761 (xsd:integer)
dbo:wikiPageLength
  • 4638 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1050710882 (xsd:integer)
dbo:wikiPageWikiLink
dbp:commissioned
  • 2015-05-11 (xsd:date)
dbp:country
  • Germany (en)
dbp:location
dbp:name
  • Nordsee-Ost offshore wind farm (en)
dbp:owner
dbp:psElectricalCapacity
  • 295.200000 (xsd:double)
dbp:psSiteArea
  • 36.0 (dbd:squareKilometre)
dbp:psUnitsManuModel
  • Senvion 6.2M126 (en)
dbp:psUnitsOperational
  • 48 (xsd:integer)
dbp:status
  • O (en)
dbp:website
dbp:wikiPageUsesTemplate
dbp:windFarmType
  • Offshore (en)
dbp:windHubHeight
  • 92 m (en)
dbp:windOffshoreDepth
  • 25 m (en)
dbp:windOffshoreDistance
  • 57.0 (dbd:kilometre)
dbp:windRotorDiameter
  • 126 m (en)
dct:subject
gold:hypernym
georss:point
  • 54.44 7.68
rdf:type
rdfs:comment
  • Nordsee Ost ist ein Offshore-Windpark der innogy in der deutschen Ausschließlichen Wirtschaftszone (AWZ) der Nordsee. Die 48 Windenergieanlagen produzieren jährlich etwa 1.000 GWh elektrische Energie. Am 11. Mai 2015 wurde der Windpark feierlich in Betrieb genommen. Die Einweihung wurde von Bundeswirtschafts- und Energieminister Sigmar Gabriel vorgenommen, der im Rahmen eines Treffens der Energieminister der G7-Staaten mit seinen Amtskollegen den Windpark und die dazugehörige Konverterplattform HelWin alpha besuchte. (de)
  • Le parc éolien de Nordsee-Ost est un parc éolien en construction situé en mer du Nord, dans la zone économique exclusive de l'Allemagne. * Portail des énergies renouvelables * Portail de la mer du Nord * Portail de l’Allemagne (fr)
  • Nordsee-Ost offshore wind farm is an offshore wind farm in operation in the eastern part of the North Sea German sector. The project was developed by RWE Innogy, a subsidiary of RWE. The wind farm consists of 48 turbines with a total capacity of 295 MW. The 6.15 MW turbines were provided by REpower. Steel foundations for generators were supplied by Aker Verdal. Power converters were supplied by Woodward Governor Company. A consortium of Siemens and Prysmian built the high-voltage direct current submarine cable from the wind farm to the German transmission system operated by Transpower, a subsidiary of TenneT. (en)
  • ВЕС Нордзе-Ост (нім. Offshore-Windpark Nordsee Ost) — німецька офшорна вітрова електростанція, введена в експлуатацію у 2015 році. Місце для розміщення ВЕС обрали в Північному морі за 30 км на північ від острова Гельголанд. Гратчату опорну основу («джекет») вагою 700 тон для офшорної трасформаторної підстанції встановив плавучий кран Rambiz, а згадане вище судно Victoria Mathias закріпило її палями. Той же плавучий кран пізніше змонтував надбудову з обладнанням («топсайд») вагою 1850 тон. (uk)
rdfs:label
  • Offshore-Windpark Nordsee Ost (de)
  • Parc éolien de Nordsee-Ost (fr)
  • Nordsee-Ost offshore wind farm (en)
  • ВЕС Нордзе-Ост (uk)
owl:sameAs
geo:geometry
  • POINT(7.6799998283386 54.439998626709)
geo:lat
  • 54.439999 (xsd:float)
geo:long
  • 7.680000 (xsd:float)
prov:wasDerivedFrom
foaf:depiction
foaf:homepage
foaf:isPrimaryTopicOf
foaf:name
  • Nordsee-Ost offshore wind farm (en)
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License