The history of rail transport in Spain begins in the 19th century. In 1848, a railway line between Barcelona and Mataró was inaugurated,[1] although a line in Cuba (then a Spanish overseas province) connecting Havana and Bejucal had already opened in 1837.[2] In 1852 the first narrow gauge line was built, in 1863 a line reached the Portuguese border. By 1864 the Madrid-Irun line had been opened, and the French border reached.[1]

In 1911 the first line to be electrified was the Gergal-Santa Fe line.[1]

In 1941 RENFE was created.[1]

The last steam locomotive was withdrawn in 1975, in 1986 the maximum speed on the railways was raised to 160 km/h (99 mph), and in 1992 the Madrid–Seville high-speed rail line opened,[1] beginning the process of building a nationwide high speed network.

Development

[edit]
The Havana-Güines rail line
Railway network in Spain and Portugal in 1906

Railway transport was first developed in Northern Europe during the 19th century, spurred not only by rapid economic growth, but also by landscapes favourable to railway construction. The mountainous terrain, low population density, relatively weak 19th century economic development and political up-and-downs hindered the development of the railway network in Spain.[3] There was an operating railway in the island of Cuba since 1837: The HavanaBejucal stretch of the Havana–Güines line was finished in 1837, and the full line in 1838.[4] The first line to be built in the Peninsula was a short link from Barcelona to Mataró opened in 1848. Prior to 1854, the only lines built in Mainland Spain were Barcelona–Mataró, MadridAranjuez (prolonged to Albacete), LangreoGijón and ValenciaJátiva.[5] The development of a true railway network began under the overarching legal frame of the 3 June 1855 Ley General de Caminos de Hierro, during the bienio progresista.[6]

A major company, the Compañía de los Ferrocarriles de Madrid a Zaragoza y Alicante [es] (MZA), was constituted in 1856 as joint venture of the Marquis of Salamanca and the Rothschilds.[7] Primarily led by the Péreires, its main rival was the Compañía de los Caminos de Hierro del Norte de España ('Norte'), constituted in 1858.[8]

One key development was the decision, taken at an early stage, that Spain's railways should be built to an unusual broad track gauge of 1,672 mm (5 ft 5+1316 in), or six Castilian feet). Some believe that the choice of gauge was influenced by Spain's hostility to neighbouring France during the 1850s: it was believed that making the Spanish railway network incompatible with that of France would hinder any French invasion.[9] Other sources state that that decision was taken to allow bigger engines that could have enough power to climb the steep passes in the second most mountainous country in Europe. As a result, Portuguese railways were also built to a broad gauge (roughly the same, 1,664 mm or 5 ft 5+12 in, but rounded to five Portuguese feet). In 1955 Spain and Portugal decided to halve this difference of 8 mm (516 in), and defined their gauge to be 1,668 mm (5 ft 5+2132 in), called Iberian gauge.

The decision for an Iberian gauge would later come to hinder interoperability of rail services with France, and it also made railway construction more expensive. Apart from the widespread broad-gauge lines, a large system of narrow gauge railways was built in the more mountainous parts of Spain, especially in the north coast of the country, where narrow gauge was the most adequate option. In 2023 transport officials in RENFE in Spain resigned when it was found that narrow-gauge passenger rolling-stock ordered in 2020 for the northern regions of Asturias and Cantabria would be too wide for the tunnels and were to be redesigned with delays of a year or two in delivery.[10]

The main-line network was roughly complete by the 1870s. Because of Spain's (until recently) relative lack of economic development, the Spanish railway network never became as extensive as those of most other European countries. For instance, in terms of land area Spain is about 2.5 times the size of Great Britain but its railway network is about 3,000 km (1,900 mi) smaller.

During the Spanish Civil War in the 1930s the railway network was extensively damaged.

Nationalization of rail network

[edit]

Immediately after the war Francoist Spain nationalized the broad gauge network, and in 1941 RENFE was formed. Narrow gauge lines were nationalized in the 1950s, later being grouped to form FEVE.

It took many years for the railway system to recover from the war. In spite of this, innovators like Goicoechea created advanced trains like the Talgo and the TER. Only with the Spanish transition to democracy in 1975, did the Spanish railway network begin to modernize and catch up with the rest of Europe.[citation needed]

Tail end of a Talgo III train, designed in the late 1960s

Following the decentralization of Spain after 1978, those narrow gauge lines which did not cross the limits of autonomous communities of Spain were taken out of the control of FEVE and transferred to the regional governments, which formed, amongst others, Eusko Trenbideak and Ferrocarrils de la Generalitat de Catalunya. Madrid (Madrid Metro), Barcelona, Valencia and Bilbao (Metro Bilbao) all have autonomous metro services.

In 1986/7, many radial routes were closed: thousands of kilometres of passenger lines were axed.

The Railway Sector Act of 2003 separated the management, maintenance and construction of rail infrastructure from train operation. The former is now the responsibility of Administrador de Infraestructuras Ferroviarias (ADIF), while Renfe Operadora ('Renfe') owns the rolling stock and remains responsible for the planning, marketing and operation of passenger and freight services (though no longer with a legal monopoly).

High speed

[edit]
High speed lines operating, under construction and planned

In recent years Spain's railways have received very heavy investment, much of it coming from the European Union. In 1992, a standard gauge high-speed rail line was built between Madrid and Seville and the AVE high-speed service was introduced for first time. In 2003, a second AVE service was introduced on a new line from Madrid to Lleida via Zaragoza and extended to Barcelona in 2008. The same year, the sections from Madrid to Valladolid and from Córdoba to Málaga were inaugurated.

The Madrid–Barcelona line is extended via an international Perthus Tunnel beneath the Pyrenees to Perpignan where it is linked up with the French TGV high-speed system. Although the LGV Perpignan-Figueres was finished on the French side since 2010, delays on the part of the French government in authorizing construction on its side of the border held up Spanish plans to some extent, and the Spanish side could not be finished before January 2013, when the entire Barcelona–Figueres section was officially inaugurated.

In December 2010 the Madrid–Cuenca–Valencia high-speed railway and the Cuenca–Albacete branch were finished as a part of the Madrid–Levante high-speed rail network. In June 2011, RENFE announced they would suppress the three daily high-speed trains between Toledo, Cuenca and Albacete because of lack of passengers despite an investment of 3.5 billion euros (this figure includes the full Madrid–Levante railway network construction costs, with its later extensions to Alicante opened in 2013 and to Murcia opened in 2021).[11] Some media stated that the average number of daily passengers was 9 between Toledo and Albacete and 6 between Toledo and Cuenca while the daily cost was 18,000 euros, while official figures gave us an average of 403–464 daily passengers.[12] Those trains ran over existing high speed lines (the lines to Toledo, Seville and Valencia) and so services to those cities remain open, but passengers traveling between Toledo and other destinations had to change trains at Madrid. However, in 2022, as the Madrid–Cuenca–Valencia traditional railway was closed, direct trains between Toledo, Cuenca and Albacete have been reinstated, this time operated as Avant services, catering better to the needs of passengers than the AVE trains that operated since 2011.

Other lines in the network include the Zaragoza–Huesca section and the Madrid–Toledo railway, both inaugurated in end 2005, the Madrid–Málaga high-speed rail line inaugurated in December 2007, the Seville–Cádiz section in October 2015, the Valencia–Castellón de la Plana section in January 2018, the Antequera–Granada section in June 2019, the Madrid–Galicia high-speed rail line in December 2021 along with the Atlantic Axis high-speed rail line in the region of Galicia which is in operation since 2015, the Venta de BañosBurgos section inaugurated in July 2022 and the Madrid–Asturias high-speed rail line in November 2023.

Further high-speed links are under construction such as from Madrid to Lisbon via the region of Extremadura, from Madrid to the region of Cantabria and the city of Santander, from Burgos to the Basque Country and the Basque Y that will link the three main Basque cities, from Zaragoza to Pamplona and finally the Murcia–Almería high-speed rail line.

Loading Gauge

[edit]

Width

[edit]

Standard gauge was adopted in Spain partly in view of the desire to integrate with the rest of Europe, and the rest of Africa. If it uses the UIC loading gauge width of 3,150 millimetres (10 ft 4 in) then there would be inconsistency with the 3,400 millimetres (11 ft 2 in) width of the futuristic African Integrated High Speed Railway Network.

Spain UIC loading gauge


Thus UIC width trains can happily work on OSShD platforms with a wider gap, but not the other way round.

See also

[edit]

References

[edit]
  1. ^ a b c d e Significant events in the history of Spanish infrastructures and railways www.fomento.es
  2. ^ Tovar, Julio (21 June 2020). "Breve historia de la esclavitud en España". CTXT.
  3. ^ "España en líneas" (PDF). museo del Ferrocarril. p. 10.
  4. ^ Diego García, Emilio de (1983). "El ferrocarril La Habana-Güines". Cuadernos de Historia Moderna y Contemporánea. 4. Madrid: Ediciones Complutense: 73. ISSN 0211-0849.
  5. ^ Ruzafa Ortega 2018, p. 33.
  6. ^ Ruzafa Ortega, Rafael (2018). "Entre política y negocios. Las élites de alcance nacional en la primera construcción ferroviaria en España (1850-1866)". Historia Social (91): 29–48. ISSN 0214-2570. JSTOR 26543241.
  7. ^ Rubio, Javier (27 January 2010). "Línea férrea Madrid-Sevilla: de los Rothschild al AVE". El Mundo.
  8. ^ García García, Carmen (2007). "Intereses públicos, intereses privados: los Péreire y sus aliados españoles (1856-1868)" (PDF). Ayer. 66 (2): 72–73. ISSN 1134-2277.
  9. ^ Kamen, Henry (2 December 2008). The Disinherited. HarperCollins. p. 216. ISBN 9780060730871. Retrieved 2015-04-19.
  10. ^ "Heads roll in Spain over trains too wide for tunnels". Stuff/Fairfax. 2023.
  11. ^ "Renfe suprimeix l'AVE Toledo-Albacete-Conca per manca de viatgers". 27 June 2011.
  12. ^ CCMA (27 June 2011). "Renfe suprimeix l'AVE Toledo-Albacete-Conca per manca de viatgers" (in Catalan). Retrieved 2016-02-06.
[edit]