Red de Expresos Regionales

From Wikipedia, the free encyclopedia
Red de Expresos Regionales
Tunnels connecting the main terminus in Buenos Aires, as shown on the render
Tunnels connecting the main terminus in Buenos Aires, as shown on the render
Overview
LocaleBuenos Aires
Transit typeRapid transit and Commuter rail
Number of lines6
Daily ridership3 million per day (projected)
Websitebuenosaires.gob.ar/rer
Operation
Began operationNo
Technical
System length16 km (9.9 mi) of tunnels added to existing 815 km (506 mi) network
Track gauge1,676 mm (5 ft 6 in)
1,000 mm (3 ft 3+38 in)
System map

Center Existing commuter rail network with RER tunnels completed.

The Regional Express Network (Spanish: Red de Expresos Regionales) was a planned commuter network system in Buenos Aires, which consisted in an underground connection among the 3 mainline railway stations of the city: Retiro, Constitucion and Once, in the north, south and west respectively.

The project was launched by then Chief of Government of Buenos Aires Mauricio Macri in May 2015,[1] and the first call for tender was made three years later.[2] The RER system project was modelled on the Réseau Express Régional in Paris.[3]

The tunnels would have had 2 new stations: the Central Station at Obelisco and the Correo Central underneath the old post office building.

At Central Station there would have been an interchange with the Underground network in the stations of Lima (A Line), Carlos Pellegrini (B Line), Diagonal Norte and Avenida de Mayo (C Line) and 9 de Julio (D Line), and the Metrobus BRT network.

At Correo Central it would be possible to interchange with two stations: Leandro N. Alem on B Line and Correo Central on E Line.

These tunnels were planned to reconnect the network, disconnected since 1897 with the closure after a fire of the Buenos Aires Central Station, constructed by the British company Buenos Aires Great Southern Railway few meters from Plaza de Mayo.

Despite all the announcements, the project was never carried out so it never surpassed its bidding process. After the administration leaded by Javier Milei suspended all the public works in Argentina,[4] the Red de Expresos Regionales continues with no plans for its construction.

History

[edit]
The 16km of tunnels joining the three main railway stations. The City of Buenos Aires is shown in dark orange while Greater Buenos Aires is shown in light orange.

The idea of linking the main commuter rail lines of Buenos Aires through a tunnel dates back to 1969, resulting in a 1973 study which suggested creating a Red Expresa Regional.[5] While the original proposal sought to link the Mitre Line and Roca Line through the centre of the city, more recent proposals suggested creating tunnels between Retiro railway station, Once railway station and Constitución railway station - the three biggest rail terminals of the city.[5][6]

Such a line would connect all urban and suburban commuter rail lines in the city, with the exception of the Urquiza Line which has access tunnels to Line B at of the Buenos Aires Underground Federico Lacroze railway station and the Belgrano Sur Line, whose inclusion in RER first depends on the current plans for the extension of the line to Constitución being completed.[7]

The current RER proposal was put forward by Buenos Aires mayor Mauricio Macri in 2015.[8] The project includes the construction of 16 km (9.9 mi) of tunnels to link the three main railway terminals and the construction of five new underground stations: one at each of the terminals, one underneath the Obelisco in the centre of the city and another in the Central Business District underneath the Buenos Aires Central Post Office.[9]

The total cost of the project will be US$1.8 billion and will integrate the existing 815 km (506 mi) network through the tunnels.[10] The central station will connect with the Metrobus network, as well as the Buenos Aires Underground lines , , and , while the Correo Central station will also connect with .[10]

The first stage of the project will take four years to complete and consists of building the Obelisco station and the north–south tunnels from Retiro railway station to Constitución railway station, integrating the Mitre Line, Roca Line and San Martín Line. The second stage will take a further two years and will see the building of the east–west tunnels connecting Once railway station to the central station and the building of the Correo Central station, integrating the Sarmiento Line into the network. The final stage will take a further two years and will extend the Belgrano Sur Line to Constitución from its existing terminal using viaducts (a project already under way independently of RER[7]) then build a new tunnel between Constitución and Retiro connecting the two metre gauge railways after they are electrified.[9][10][11]

Perhaps the most notable omission from the project is the inclusion of the Urquiza Line whose terminal as at Federico Lacroze railway station in the West of the city. The line is distinctive from the other lines due to its standard gauge configuration since it was originally intended to be part of Line B of the Buenos Aires Underground. Urquiza Line trains without any modification could use the access tunnel at the Federico Lacroze underground station and travel through the line's tunnels to Carlos Pellegrini station which is where Line B would combine with RER regardless of the inclusion of the Urquiza line.

Challenges

[edit]

The main challenges to the implementation of the RER network were found in the differing track gauges and state of electrification found in the different lines in Greater Buenos Aires:

Buenos Aires Commuter Rail[12]
Line Length (kilometres) Track gauge Electrification Annual ridership (2008)
Roca
237.2
1,676 mm (5 ft 6 in)
Yes
125,556,026
Sarmiento
184.1
1,676 mm (5 ft 6 in)
Yes
118,143,006
Mitre
185.5
1,676 mm (5 ft 6 in)
Yes
73,207,048
San Martín
56.3
1,676 mm (5 ft 6 in)
Planned
46,647,676
Belgrano Norte
54.3
1,000 mm (3 ft 3+38 in)
No
45,830,200
Urquiza
29.9
1,435 mm (4 ft 8+12 in)
Yes
24,212,133
Belgrano Sur
66.3
1,000 mm (3 ft 3+38 in)
Planned
11,472,416

Discounting the Urquiza Line which is not included in the project and which could easily be integrated into the Buenos Aires Underground, the problems are then found within the San Martín Line and the two Belgrano lines of the General Belgrano Railway. The San Martín Line, while sharing the same 1,676 mm (5 ft 6 in) as the majority of the network, currently uses diesel-electric CSR SDD7 rolling stock, however electrification of the line has now been planned for some time and the rolling stock would presumably be moved to other parts of the country.[13][14][15] In 2015, the first studies on the line's electrification began, while the government announced that funding had been secured.[16][17]

The Belgrano Sur and Belgrano Norte perhaps provided the biggest challenge since both had a different track gauge to the rest of the network and neither are electrified, with no immediate plans to carry out electrification at the time the RER project was announced. However, both lines are having their rolling stock replaced with electrification in mind, with the Belgrano Sur line using new CNR DMUs which have been designed to be easily converted to electric power, while the Belgrano Norte has a similar case with its new Argentine-made Emepa Alerce DMUs which are also designed to be easily converted.[18][19]

Converting the gauge of the lines was out of the question, so there would have been a separate north–south tunnel between Retiro and Constitución for the two lines. Since both lines have the lower traffic than the Sarmiento, Mitre and Roca lines and given the current lack of electrification, difference in gauge and necessary extension of the Belgrano Sur line to Constitución, the connection of these two lines to the RER network will be left to the third and final stage of its construction.[9] Conversely, those three lines are the most straight forward especially considering that they all share the same CSR rolling stock.[20]

Existing tunnels and connections

[edit]
A Line B car operating above-ground on the Urquiza Line.

As noted, the Urquiza Line already has a connection to both future stations in the centre of the city through the use of Line B, though currently this connection is not made use of since services terminate at Federico Lacroze railway station and do not continue on underground.[21]

Likewise, the Sarmiento Line and San Martín Line are connected by a one-track tunnel which runs through the city from the Sarmiento Line's terminus at Once railway station in what would be RER's trajectory to Puerto Madero, while a double-track segment connects the former Puerto Madero station with the San Martín Line's terminus at Retiro railway station. This route between the two lines has been traditionally used for freight services, though it was briefly used for passenger services to the centre of the city on the Sarmiento Line during the 1990s.[22]

Similarly, the tracks of what was the Buenos Aires and Ensenada Port Railway and the Tranvia del Este provide a north–south connection through the Puerto Madero district, though today these areas have heavy road traffic and would be unsuitable for overground commuter rail.

See also

[edit]

References

[edit]
  1. ^ En campaña, Macri presentó un proyecto de RER on En el subte, 9 May 2015
  2. ^ Red de Expresos Regionales (RER): el Gobierno nacional licitará la obra a través del sistema de PPP on Trenes Argentinos, 13Mar 2018
  3. ^ Una idea que nació en París - Buenos Aires Ciudad, 12 May 2015.
  4. ^ El anticipo de Javier Milei: se suspenden todas las obras públicas, incluso las que están en ejecución on Página/12, 22 Nov 2023
  5. ^ a b Planificacion Y Estrategia En la región metropolitana - Pagina/12, 20 October 2013.
  6. ^ RER: UN PROYECTO INDISPENSABLE PARA LA MOVILIDAD METROPOLITANA DE BUENOS AIRES - Roberto Agosta and Martín Blas Orduna, 2009.
  7. ^ a b Elevarán las trazas del ferrocarril San Martín y del Belgrano Sur - InfoBAE, 16 December 2014.
  8. ^ Mauricio Macri lanzó el proyecto de obra de transporte de pasajeros más importante de la historia de la Ciudad - Buenos Aires Ciudad, 8 May 2015.
  9. ^ a b c Detalles del proyecto para conectar todos los ferrocarriles urbanos debajo del Obelisco - Buenos Aires Ciudad, 12 May 2015.
  10. ^ a b c Macri promete una estación central debajo del Obelisco - La Nacion, 9 May 2015.
  11. ^ En campaña, Macri presentó un proyecto de RER - EnElSubte, 9 May 2015.
  12. ^ Secretaria de Transporte de la Nacion Facts and Figures / TABLE No. 2 (Spanish) Retrieved on 19 February 2011
  13. ^ Randazzo: “La electrificación no está descartada” Archived 2015-04-02 at the Wayback Machine - Diario Pilar, 15 June 2014.
  14. ^ Los nuevos trenes chinos en el San Martín - La Nacion, 26 October 2013.
  15. ^ El San Martín, entre obras y una electrificación impostergable - EnElSubte, 11 May 2015.
  16. ^ Tras reunirse con autoridades del BID, Randazzo señaló que "Argentina obtendrá financiamiento para otros importantes proyectos ferroviarios" - Ministerio del Interior y Transporte, 4 August 2015.
  17. ^ China realizará el estudio de factibilidad para electrificar la línea San Martín Archived 2015-09-13 at the Wayback Machine - Presidencia de la Nacion, 9 September 2015.
  18. ^ Servicio diferencial en la Línea Belgrano Norte con coches motores "Alerce" - Cronica Ferroviaria, 26 March 2015.
  19. ^ Así son los nuevos coches motores CNR para el Belgrano Sur - EnElSubte, 16 April 2015.
  20. ^ La Presidenta presentó los 300 vagones cero kilómetro destinados al ferrocarril Roca, que a fin de año estará electrificado - Sala de Prensa de la Republica Argentina, 05 March 2015.
  21. ^ Martorelli: “Sería importante vincular el FC Urquiza con la línea B” - EnElSubte, 22 September 2014.
  22. ^ Desde Puerto Madero a Castelar en 20 minutos - La Nacion, 8 August 1997.
[edit]